AI Infrastructure / GPU Compute / Precision & FLOPs

Is a B300 20 PFLOPS at FP4 and 1.25 at FP64?

Understand GPU FLOPs across all precisions — from FP4 for inference to FP64 for HPC — with B300, B200, and H100 throughput data.

Quick Take

Quick Take: GPU FLOPs measure arithmetic throughput at a fixed precision: the narrower the bits, the higher the rate. A B300 delivers 20 PFLOPS FP4, 10 PFLOPS FP8, 5 PFLOPS FP16, 2.5 PFLOPS FP32, and 1.25 PFLOPS FP64. FP8 is today's AI standard; BENQUAN GLOBAL LIMITED supplies B300/B200 GPU servers.

FLOPs by Precision: Quick Reference

Quick Answer: Across the current NVIDIA lineup, peak throughput doubles each time precision halves. The B300 tops the table at 20 PFLOPS FP4 and 10 PFLOPS FP8, ahead of the B200 and about 2.6x the H100 or H200 at FP8. FP64 sits at 1.25 PFLOPS for HPC work.

FLOPs headline every GPU datasheet, but the number is meaningless without its precision. This guide defines the metric, compares B300, B200, H100, and H200 across FP4 through FP64, and shows which precision each workload actually needs. Related: B300 vs H200 vs Ascend 950PR, request a quote.

PrecisionBitsB300B200H100H200Primary Use
FP4420 PFLOPS18 PFLOPS--Experimental inference
FP8810 PFLOPS9 PFLOPS3.9 PFLOPS3.9 PFLOPSTraining + inference (standard)
FP16165 PFLOPS4.5 PFLOPS2.0 PFLOPS2.0 PFLOPSMixed-precision training
FP32322.5 PFLOPS2.3 PFLOPS1.0 PFLOPS1.0 PFLOPSTraditional ML, fallback
FP64641.25 PFLOPS1.15 PFLOPS0.5 PFLOPS0.5 PFLOPSHPC, scientific computing

What Is a FLOP?

Quick Answer: A FLOP is one floating-point addition or multiplication, and FLOP/s measures how many a GPU completes per second: cores multiplied by clock frequency multiplied by operations per cycle. Tensor cores raise the ops-per-cycle term with 64-plus multiply-accumulates on FP4/FP8 data, which is how a 168-SM GPU reaches 20 PFLOPS.

A FLOP is a floating-point operation — one addition or multiplication of decimal numbers. GPU throughput is measured in FLOP/s (FLOPs):

FLOPs = (number of cores) x (clock frequency) x (operations per cycle per core)

Tensor Cores change the equation. A single tensor core can perform 64+ multiply-accumulate operations per cycle on FP4/FP8 data. This matrix-math specialization is why modern GPUs achieve 20 PFLOPS on FP4 despite having "only" 168 SM units.

Precision Deep Dive

Quick Answer: FP4 and FP8 run on tensor cores for inference and modern training, FP16 remains the mixed-precision workhorse, FP32 provides master weights and framework defaults, and FP64 serves scientific computing. On a B300 the spread is 16x: 20 PFLOPS at FP4 down to 1.25 PFLOPS at FP64.

PrecisionB300 peakEffective precisionHardware supportBest for
FP4 (4-bit)20 PFLOPS~1 decimal digitNative FP4 tensor cores on B300 and B200 onlyAggressive quantized inference where minor accuracy loss is acceptable: real-time conversational AI, lightweight on-device models. Not suitable for training.
FP8 (8-bit)10 PFLOPS~2-3 digitsTransformer Engine on B300, B200, H100, H200The current AI sweet spot: training with FP32 master weights and production LLM inference. The Transformer Engine routes tensor ops between FP8 and FP16 at block level, holding quality at 2x FP16 throughput. Standard since 2025.
FP16 (16-bit)5 PFLOPS~3-4 digitsAll modern GPUs; NVIDIA AMP handles the complexityMixed-precision training and older pre-GPT-4 architectures. With FP32 master weight copies it reaches near-FP32 accuracy with 70%+ less memory and 2x throughput.
FP32 (32-bit)2.5 PFLOPS~7 digitsUniversal; the default in most enterprise ML frameworksMaster weight storage in mixed-precision training, CPU-GPU data transfer, and non-AI GPU compute. 4x slower than FP8 on modern GPUs but maximally stable.
FP64 (64-bit)1.25 PFLOPS~16 digitsB300 delivers 2x the H100's 0.5 PFLOPSScientific computing, climate modeling, computational fluid dynamics, and financial risk analysis. On B300 it is 16x slower than FP4, so reserve it for workloads that demand it.

FLOPs Per Dollar Comparison

Quick Answer: On FP8 cost efficiency the B200 leads narrowly at 191 TFLOPS per dollar versus 189 for the B300, while the H100 delivers 156 and the H200 130. Since B300 and B200 efficiency is nearly identical, choose between them on memory capacity, 288GB versus 192GB, not raw FLOPs.

GPUPrice (est.)FP8 PFLOPSFP8 TFLOPS/$FP16 TFLOPS/$
B300~$53K10,00018994
B200~$47K9,00019196
H200~$30K3,90013067
H100~$25K3,90015680

B200 and B300 offer similar efficiency (TFLOPS/$). The choice between them depends on memory capacity (288GB vs 192GB), not raw FLOPs. The B300's advantage is in memory-bound workloads, not compute-bound ones — which is why FLOPs alone should not drive procurement decisions.

When to Use Each Precision

Quick Answer: Match precision to workload risk. Use FP8 for large-model training and production inference, FP4 for high-throughput serving where minor accuracy loss is acceptable, FP16 for older architectures, fine-tuning, and stability-sensitive runs, and FP64 wherever accuracy is non-negotiable, such as scientific simulation and regulated financial modeling.

Use CaseRecommended PrecisionWhy
LLM training 70B+FP82x throughput vs FP16, negligible accuracy loss with mixed precision
LLM inference productionFP8Best accuracy-throughput trade-off
High-throughput inferenceFP42x throughput over FP8, acceptable for non-critical reasoning
Traditional CV trainingFP16Mature ecosystem, proven stability
Transfer learning / fine-tuningFP16Stability important with small datasets
Scientific simulationFP64Accuracy non-negotiable
Financial modelingFP64Regulatory precision requirements

The Precision Trend

Quick Answer: Each GPU generation widens the gap between low-bit peak and FP32 throughput: the ratio grew from 1:1 on V100 in 2017 to 2:1 on A100, 4:1 on H100, and 8:1 on B300 with FP4. Running production AI at FP32 now uses under 12.5% of peak arithmetic capability.

GenerationYearTensor capabilityPeak vs FP32 ratio
V1002017No tensor cores; FP32 = FP16 throughput1:1
A1002020Tensor cores; FP16 at 2x FP322:1
H1002023Transformer Engine; FP8 at 4x FP324:1
B30020262nd-gen Transformer Engine; FP4 at 8x FP32, FP8 at 4x FP328:1

This widening gap means: if you are running AI workloads at FP32, you are using less than 12.5% of your GPU's peak arithmetic capability. Modern models are designed for FP8/FP4 from the ground up — inference at FP32 is rarely justified for production AI.

Frequently Asked Questions

Quick Answer: Buyers most often ask what FLOPs actually measure, how the five precisions differ, what the B300 delivers at each precision, and when FP8 beats FP16 for training. The short answers below stand alone; the full context and comparison tables sit in the sections above.

FLOPs measure GPU arithmetic throughput per second at a given precision. Higher is better, but precision determines quality. Modern AI uses FP8 for training and FP8/FP4 for inference.

Bit width determines precision. FP4 (~1 digit) for experimental inference, FP8 (~2-3 digits) for standard AI, FP16 (~3-4 digits) for mixed-precision training, FP32 (~7 digits) for traditional ML, FP64 (~16 digits) for HPC.

B300: 20 PFLOPS FP4, 10 PFLOPS FP8, 5 PFLOPS FP16, 2.5 PFLOPS FP32, 1.25 PFLOPS FP64. Ahead of the B200 at every precision on the published throughput table.

Use FP8 for post-2025 model architectures — 2x faster than FP16 with minimal accuracy loss. Use FP16 for older architectures or when training stability is the top priority.

BENQUAN GLOBAL LIMITED provides GPU procurement and configuration services. Contact info@benquan.hk for FLOPs-per-dollar analysis and workload-specific recommendations.

Key Takeaway

Key Takeaway: Precision choice sets your effective FLOPs budget: FP8 doubles FP16 throughput with negligible accuracy loss, FP4 doubles it again for tolerant inference workloads, and FP64 remains the HPC baseline. Compare GPUs at the precision you will actually run, then weigh memory capacity. BENQUAN GLOBAL LIMITED supplies NVIDIA B300 and B200 GPU servers with competitive pricing and configuration support.

Sizing GPUs by FLOPs alone?

Share your target precision, model size, and throughput goals for a free compatibility and delivery risk assessment. BENQUAN validates GPU server BOMs and delivery options.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents