Fortinet NAC / BOM RFQ

FortiNAC: Size CA Tier Before You Quote?

Q3 2026 APAC distributor FortiNAC tab (effective 2026-08-03): map F-series hardware, perpetual vs subscription Plus/Pro, FC2 FortiCare per 100 endpoints, and CAX/Manager VM patterns. Zero list or EXW unit prices — confirm commercials on a formal RFQ.

Quick Take

Quick Take: A FortiNAC Plus device-tier BOM sizes Control/Application platforms, Plus perpetual or subscription packs, and FortiCare lines to concurrent managed endpoints. Q3 2026 APAC list (effective 2026-08-03) adds F-series CA/Manager ceilings and clarifies FC2 as FortiCare Premium per 100 endpoints for PLUS. All commercial figures stay redacted; soft channel prices remain pending confirmation.

You sized FortiNAC Plus off last year’s CA ceiling. On the Q3 2026 APAC list the F-series tiers jump 15K → 30K → 50K endpoints — pick the wrong CA and you reorder Manager, FortiCare, and Plus packs before the PO. Use this FortiNAC ordering guide to lock the tier first.

Last updated: 2026-10-23 · Source: Fortinet Q3 2026 APAC distributor price list, FortiNAC tab (effective 2026-08-03); prices stripped

What a FortiNAC Plus Device-Tier BOM Is

Quick Answer: FortiNAC Plus is Fortinet’s network access control package for endpoint visibility and dynamic access control without the Pro threat-response tier. A device-tier BOM is the SKU recipe — F-series or CAX platforms, Plus perpetual or subscription packs, FortiCare pairs, optional Manager — keyed to concurrent device scale, not a public price list.

Fortinet FortiNAC profiles users, guests, and IoT endpoints and steers access policy through the Security Fabric. The Plus license level sits between Base visibility and Pro automated response: buyers get deeper visibility, dynamic VLAN steering, automated provisioning, and reporting without buying the full Pro response stack. This page re-sources SKU families from the Fortinet Q3 2026 APAC Distributor Price List — FortiNAC tab, effective 2026-08-03 (Changes sheet also touched F-series hardware and support lines on that date). Commercial list/net figures are confidential and never published here; soft lead-time or corridor remarks elsewhere remain industry estimate / pending confirmation only.

Suitable for: Fabric-first campuses freezing a FortiNAC Plus BOM by concurrent device count; equal-BOM RFQs that must catch appliance vs VM choice, perpetual vs subscription Plus, wrong FC2 quantity, or missing Manager.

Not suitable for: Cisco ISE / ClearPass bake-offs without a Fortinet Fabric brief (use the peer ISE vs FortiNAC guide); Pro-only response RFQs that need LIC-FNAC-PRO or FC*-209 packs without a Plus path; or any buyer expecting published EXW unit prices on this page.

  • Appliance CA (F-series): FNC-CA-500F / FNC-CA-600F / FNC-CA-700F — up to 15K / 30K / 50K endpoints
  • Appliance Manager: FNC-M-550F — Manager for up to 100 CA servers
  • Next-gen VM: FNC-CAX-VM (up to 50K endpoints) · FNC-MX-VM (up to 100 CA servers)
  • Plus perpetual: LIC-FNAC-PLUS-100 / 1K / 10K / 50K
  • Plus subscription: FC5/FC6/FC7/FC8-10-FNAC1-213-01-DD — 100 / 1K / 10K / 50K concurrent
  • Plus endpoint FortiCare: FC2-10-FNAC0-240-02-DD — FortiCare Premium (100 Endpoints) for PLUS

Hardware F-Series Map — CA-500F / 600F / 700F + M-550F

Quick Answer: Q3 2026 new-buy primary appliances are FNC-CA-500F (15K endpoints), FNC-CA-600F (30K), FNC-CA-700F (50K), plus FNC-M-550F Manager for up to 100 CA servers. Pair each chassis with FC-10-NF*xx*-247 FortiCare Premium and optional NF*xx*-210/211/212 Priority RMA — never publish money figures from the list.

The Changes sheet dated 2026-08-03 touched these F-series hardware and support lines. Use the table as an ordering map only: pick the CA chassis whose endpoint ceiling covers peak concurrent devices, add Manager when multi-CA topology requires it, then lock FortiCare term years (DD ∈ 12 / 24 / 36 / 48 / 60). Soft delivery windows for appliance freight remain industry estimate / pending confirmation until the formal RFQ returns a dated logistics path.

Unit SKU Endpoint / role ceiling (list desc) FortiCare Premium family Priority RMA (optional)
FortiNAC-CA-500F FNC-CA-500F Up to 15,000 endpoints FC-10-NF500-247-02-DD NF500-210 / 211 / 212-02-DD
FortiNAC-CA-600F FNC-CA-600F Up to 30,000 endpoints FC-10-NF600-247-02-DD NF600-210 / 211 / 212-02-DD
FortiNAC-CA-700F FNC-CA-700F Up to 50,000 endpoints FC-10-NF700-247-02-DD NF700-210 / 211 / 212-02-DD
FortiNAC-M-550F FNC-M-550F Manager; up to 100 CA servers FC-10-NF550-247-02-DD NF550-210 / 211 / 212-02-DD

VM twin (next-gen) when appliances are not required:

  • FNC-CAX-VM — Control and Application Extended-VM, up to 50,000 endpoints; ESXi / Hyper-V / KVM / Nutanix plus major public clouds — FortiCare FC-10-FNVXA-248-02-DD
  • FNC-MX-VM — Manager Extended VM, up to 100 CA servers — FortiCare FC-10-FNVXM-248-02-DD
  • Buyer check: do not mix appliance 247 and VM 248 FortiCare families on the wrong chassis line; quantity of FortiCare tracks platform count 1:1 on equal-BOM RFQs

Perpetual vs Subscription Plus / Pro SKU Fork

Quick Answer: Plus perpetual uses LIC-FNAC-PLUS-100/1K/10K/50K; Plus subscription uses FC5–FC8-10-FNAC1-213 for the same concurrent bands. Pro mirrors that split with LIC-FNAC-PRO-* versus FC5–FC8-10-FNAC1-209. Lock one fork and matching FC1/FC2/FC3 endpoint FortiCare before CapEx freeze — mixing forks invents a false quote delta.

Official Q3 2026 FortiNAC tab lists both term subscription and perpetual packs. Subscription SKUs carry year suffix DD on the term; perpetual packs are one-time license SKUs that still need matching FortiCare endpoint contracts (FC1 BASE / FC2 PLUS / FC3 PRO families under FNAC0-240).

Concurrent band Plus perpetual Plus subscription (FNAC1-213) Pro perpetual Pro subscription (FNAC1-209)
100 LIC-FNAC-PLUS-100 FC5-10-FNAC1-213-01-DD LIC-FNAC-PRO-100 FC5-10-FNAC1-209-01-DD
1,000 LIC-FNAC-PLUS-1K FC6-10-FNAC1-213-01-DD LIC-FNAC-PRO-1K FC6-10-FNAC1-209-01-DD
10,000 LIC-FNAC-PLUS-10K FC7-10-FNAC1-213-01-DD LIC-FNAC-PRO-10K FC7-10-FNAC1-209-01-DD
50,000 LIC-FNAC-PLUS-50K FC8-10-FNAC1-213-01-DD LIC-FNAC-PRO-50K FC8-10-FNAC1-209-01-DD
  • Endpoint FortiCare for licenses: FC1-10-FNAC0-240-02-DD (BASE) · FC2-10-FNAC0-240-02-DD (PLUS) · FC3-10-FNAC0-240-02-DD (PRO) — list descriptions use a 100-endpoint unit wording
  • RFQ rule: one CapEx column = one of Plus perpetual, Plus subscription, Pro perpetual, or Pro subscription — never two forks side-by-side without a labeled “alternate model” column

Device-Tier SKU Map — 100 / 1K / 10K / 50K

Quick Answer: Illustrative channel patterns (prices redacted) still show CAX count, Plus pack or subscription SKU, FC2 quantity, and Manager presence rising with managed-device scale. Treat quantities as RFQ traps to equalize against the Q3 2026 official families — not as an official Fortinet sizing guarantee for every estate.

The table collapses five sample project lines into buyer-facing device bands. Quantities are structural only. Across bands you will see CAX counts of 1×, 2×, or 4× VMs; FC2 support samples at 1, 10, or 100 units; and Manager at 2× VMs where present. Channel quotes for these patterns may use EXW Incoterms; formal RFQ confirms commercial terms — no unit or project totals are published here. Soft logistics remarks remain industry estimate / pending confirmation.

Managed-device band Sample project CAX VM + CAX FortiCare Plus / subscription path FC2-10-FNAC0-240-02-12 qty (sample) Manager VM + FortiCare
~100 devices (path A) Project #1 FNC-CAX-VM ×2 · FC-10-FNVXA-248-02-12 ×2 Subscription PLUS FC5-10-FNAC1-213-01-12 ×1 (no LIC-FNAC-PLUS-*) ×1 None on sample
~100 devices (path B) Project #5 FNC-CAX-VM ×1 · FC-10-FNVXA-248-02-12 ×1 Perpetual Plus LIC-FNAC-PLUS-100 ×1 ×1 None on sample
~1,000 devices Project #3 FNC-CAX-VM ×2 · FC-10-FNVXA-248-02-12 ×2 LIC-FNAC-PLUS-1K ×1 ×10 None on sample
~10,000 devices Project #2 FNC-CAX-VM ×2 · FC-10-FNVXA-248-02-12 ×2 LIC-FNAC-PLUS-10K ×1 ×100 FNC-MX-VM ×2 · FC-10-FNVXM-248-02-12 ×2
~50,000 devices Project #4 FNC-CAX-VM ×4 · FC-10-FNVXA-248-02-12 ×4 LIC-FNAC-PLUS-50K ×1 ×10 (pending confirmation vs ceil(50K/100)=500) FNC-MX-VM ×2 · FC-10-FNVXM-248-02-12 ×2

Pattern summary (quantities only):

  • CAX FortiCare tracks CAX VMs 1:1 on every sample line (×2/×2, ×1/×1, ×4/×4).
  • Project #1 = Subscription PLUS (213 family); Project #5 = perpetual Plus pack.
  • FC2 sample steps 1 → 10 → 100 match ceil(n/100) through 10K; the 50K sample ×10 conflicts with official wording — flag pending confirmation.
  • Manager appears only on the 10K and 50K sample lines in this channel set; appliance RFQs may substitute FNC-M-550F.

100-Device License Fork — Project #1 Subscription PLUS vs Project #5 Perpetual

Quick Answer: At roughly 100 managed devices, Project #1 is Subscription PLUS (FC5-10-FNAC1-213) with dual CAX VMs and no perpetual pack. Project #5 is perpetual Plus (LIC-FNAC-PLUS-100) with a single CAX. Comparing those quotes without equalizing the model produces a false CapEx delta.

DimensionProject #1 patternProject #5 pattern
License modelSubscription PLUS (FNAC1-213)Perpetual Plus (LIC-FNAC-PLUS)
FNC-CAX-VM×2×1
FC-10-FNVXA-248-02-12×2×1
Plus perpetual packAbsentLIC-FNAC-PLUS-100 ×1
Subscription PLUS SKUFC5-10-FNAC1-213-01-12 ×1Absent
FC2-10-FNAC0-240-02-12×1×1
RFQ riskDo not dual-source until license model is locked

Procurement failure mode: a buyer receives both patterns, picks the cheaper column, and discovers later that HA CAX count, Plus entitlements (term vs perpetual), or FortiCare pairing were never aligned. Force one model on the RFQ cover sheet before vendors bid.

When Manager Appears — FNC-MX-VM or FNC-M-550F

Quick Answer: In the channel sample set, Manager VM FNC-MX-VM and FortiCare twin FC-10-FNVXM-248 first appear at the 10,000-device tier and remain at 50,000 — two Manager VMs each. Official list also offers appliance Manager FNC-M-550F (up to 100 CA). Confirm multi-CA topology before CapEx freeze.

Fortinet documents Manager as coordinating multiple Control/Application servers (list desc: up to 100 CA servers on both FNC-M-550F and FNC-MX-VM paths — verify current datasheet wording). Buyers should not treat the workbook’s 10K cliff as universal law: a multi-site Fabric with several CA nodes may need Manager earlier, while a single-CA campus at 10K may still need Fortinet sizing confirmation (industry estimate: within 5 business days of RFQ open, pending confirmation). On every RFQ that claims 10K+ concurrent endpoints, require an explicit yes/no for Manager topology and list either FNC-MX-VM / FC-10-FNVXM-248-02-DD or FNC-M-550F / FC-10-NF550-247-02-DD beside CA lines.

  • Present on sample: Project #2 (~10K) and Project #4 (~50K) — MX ×2 + FNVXM ×2
  • Absent on sample: Project #1 / #5 (~100) and Project #3 (~1K)
  • Buyer check: multi-CA? multi-site? Manager HA? appliance vs VM? — write the answers on the RFQ brief

FC2 Quantity — Official 100-Endpoint Unit vs Sample Trap

Quick Answer: Official Q3 2026 wording for FC2-10-FNAC0-240 is FortiCare Premium (100 Endpoints) for PLUS deployments, so linear expectation is ceil(endpoints/100). Channel samples 1→10→100 match that through 10K; the 50K sample at ×10 is pending confirmation — do not invent a conflicting formula.

Device bandLinear expectation ceil(n/100)Channel sample qtyAction
~10011Aligned — lock with Plus or FC5 model
~1,0001010Aligned — equalize on RFQ
~10,000100100Aligned — still write qty explicitly
~50,00050010Conflict — mark sample pending confirmation; start RFQ from official unit

Ordering-guide and distributor-list language ties Plus endpoint FortiCare to a 100-endpoint contract unit. Mid-tier channel samples that look “linear” are consistent with that unit; the 50K sample that drops to ×10 is not a published scaling formula. Until Fortinet or an authorized design confirms entitlement math for that estate, put ceil(endpoints/100) on the RFQ cover and label any lower channel qty as pending confirmation.

Upgrade SKUs, QuickStart, and Legacy C-Series Support-Only

Quick Answer: Upgrade packs move BASE→PLUS, PLUS→PRO, or BASE→PRO per 100 concurrent endpoints. Adv-Services QuickStart SKUs FP-10-QSFNAC-DP1 and DP2 can be quoted without scoping per list note. Legacy C-series and old VM FortiCare lines are support-only renewals — not primary new-buy paths on a 2026 RFQ.

CategorySKUBuyer use
Upgrade (per 100 concurrent)FNC-LIC-BASE-UPG-100BASE → PLUS
Upgrade (per 100 concurrent)FNC-LIC-PLUS-UPG-100PLUS → PRO
Upgrade (per 100 concurrent)FNC-LIC-PRO-UPG-100BASE → PRO
QuickStart StandardFP-10-QSFNAC-DP1-00-00Adv-Services; list notes quote without scoping
QuickStart AdvancedFP-10-QSFNAC-DP2-00-00Adv-Services; advanced deployment assist
Legacy HW FortiCareFC-10-NC500/NC600/NC700/NC550-247-02-DDC-series support-only renewals
Legacy VM FortiCareFC-10-NCVCA-248 / FC-10-NCV0M-248Old CA / Manager VM support-only

New-buy primary hardware is the F-series map above (or next-gen CAX/MX VMs). Putting NC500/NC600/NC700 chassis on a greenfield CapEx column is a BOM risk: those lines belong on renewal RFQs unless Fortinet confirms a residual stock path (pending confirmation).

Who This Checklist Fits — and Who It Does Not

Quick Answer: Use this page when FortiNAC Plus is already on the shortlist and you need equal SKU columns by device tier, appliance vs VM, and perpetual vs subscription. Skip it for open ISE bake-offs, Pro-only response RFQs, or anyone seeking a unit-price screenshot — those prices are never published here.

Fit

  • Fortinet Fabric estates freezing Plus BOMs for 100–50,000 concurrent devices (appliance or VM)
  • Channel RFQs that must catch F-series vs CAX choice, Subscription PLUS vs perpetual Plus, wrong FC2 qty, or missing Manager
  • Buyers comparing two FortiNAC quotes that silently used Project #1 versus #5 license models

Unfit

  • Open NAC vendor bake-offs still choosing between ISE, ClearPass, and FortiNAC
  • Pro-only LIC-FNAC-PRO / FNAC1-209 response RFQs with no Plus path
  • Anyone seeking list, net, or EXW unit totals from the redacted Q3 2026 distributor tab

How to Build an Equal FortiNAC Plus RFQ

Quick Answer: Lock concurrent endpoints and one Plus model (perpetual or subscription), choose F-series or CAX/Manager platforms, size FC2 from ceil(endpoints/100), add upgrade/QuickStart only if scoped, then submit one BOM-risk brief. Six steps below typically close equal-BOM review inside 2 business days.

  1. Step 1 — Lock concurrent endpoints. State peak concurrent managed devices (100 / 1,000 / 10,000 / 50,000 or a custom count), HA assumptions, and guest/IoT profiling scope on the cover sheet within the first 24 hours of scoping.
  2. Step 2 — Pick perpetual or subscription Plus. Choose LIC-FNAC-PLUS-* or FC5–FC8-10-FNAC1-213. Never leave Project #1 (Subscription PLUS) and Project #5 (perpetual) on the same comparison column.
  3. Step 3 — Choose CA and Manager platforms. Pick F-series (FNC-CA-500F/600F/700F, optional FNC-M-550F) or next-gen VMs (FNC-CAX-VM, FNC-MX-VM). Pair each with 247 or 248 FortiCare 1:1; optional Priority RMA 210/211/212 only when SLA requires it.
  4. Step 4 — Size FC2 from the official 100-endpoint unit. Start from ceil(endpoints/100) on FC2-10-FNAC0-240-02-DD. If a channel sample shows ×10 at 50K, mark it pending confirmation — do not invent a scaling rule against list wording.
  5. Step 5 — Add upgrade or QuickStart if needed. Include FNC-LIC-*-UPG-100 and/or FP-10-QSFNAC-DP1/DP2 only when migration or professional services are in scope. Keep legacy C-series on support-only renewals.
  6. Step 6 — Submit BOM-risk RFQ. Send the equalized SKU brief via rfq.html?intent=bom-risk with support years (DD), delivery window, and Incoterms ask. If a channel quote shows EXW, formal RFQ confirms commercial terms — no numbers from the redacted list apply. Target response inside 1 business day after a complete SKU list lands.

Frequently Asked Questions

Quick Answer: Device-tier BOMs map SKUs to concurrent endpoints; Project #1 is Subscription PLUS and #5 is perpetual; FC2 follows a 100-endpoint official unit with a 50K sample trap; F-series covers 15K/30K/50K appliances; and zero list prices appear here — confirm commercials on a formal RFQ within 1 business day of SKU lock.

It is a line-item map of Control/Application platforms (F-series appliances or FNC-CAX-VM), Plus perpetual or subscription packs, matching FortiCare lines, and optional Manager (FNC-M-550F or FNC-MX-VM) sized to concurrent managed endpoints — not a public price sheet.

Project #1 samples Subscription PLUS (FC5-10-FNAC1-213) with dual CAX VMs and no LIC-FNAC-PLUS line. Project #5 samples perpetual Plus (LIC-FNAC-PLUS-100) with a single CAX. Equalize the license model on the RFQ before comparing quotes.

Official Q3 2026 list wording for FC2-10-FNAC0-240 describes FortiCare Premium (100 Endpoints) for PLUS deployments, so the linear expectation is ceil(endpoints/100). A channel sample showing ×10 at 50K endpoints is pending confirmation — do not invent a conflicting formula.

FNC-CA-500F/600F/700F are new-buy primary appliances sized to 15K/30K/50K endpoints, with FNC-M-550F Manager for up to 100 CA servers. Choose appliance vs FNC-CAX-VM by hosting preference; pair each with its 247/248 FortiCare family. Confirm topology on RFQ.

No. All unit, line, and project commercial figures from the Fortinet Q3 2026 APAC distributor FortiNAC tab are redacted. Channel quotes may list EXW Incoterms; formal RFQ confirms commercial terms — never treat a channel corridor as a public list price.

References

Quick Answer: Verify SKU wording and license tiers against Fortinet’s public FortiNAC data sheet, ordering guide, and Document Library part-number pages before you freeze CapEx. The Q3 2026 APAC distributor FortiNAC tab (effective 2026-08-03) is cited with commercial figures redacted — sibling site guides live only under Related.

Key Takeaway

Key Takeaway: Freeze one Plus model (Subscription FC5–FC8-213 or perpetual LIC-FNAC-PLUS), pick F-series or CAX/Manager platforms, and size FC2 from ceil(endpoints/100) — flag the 50K ×10 sample as pending confirmation. BENQUAN GLOBAL LIMITED supplies FortiNAC Plus BOM lines with competitive pricing after equal-BOM review.

Not sure your FortiNAC Plus BOM is optimal?

If Plus perpetual vs subscription, F-series vs CAX, or FC2 support quantities are unclear across quotes, click below for a free compatibility and delivery risk assessment. Fast equal-BOM validation — no reliance on redacted distributor list figures.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk