Quick Take
Quick Take: FortiManager is the policy and firmware control plane for a FortiGate fleet, and it is licensed by managed object rather than by box. Every VDOM consumes a device slot, so an estate with heavy virtual-domain use can outgrow an entry appliance long before the site count suggests it will.
Model Comparison
Quick Answer: Capacity is licensed in managed devices, and every VDOM counts as one: the 1U FMG-200G handles 30, the 410G and 1000G step to 150 and 1,000, and the 3100G and 3750G stretch to 8,000 and 100,000 with add-on licenses. Daily log allowances stay small — keep analytics on FortiAnalyzer.
Figures follow the current Fortinet FortiManager datasheet (G-Series). Confirm software train and device add-on SKUs on the quote. BENQUAN GLOBAL LIMITED supplies FortiManager hardware and support. Related: FortiAnalyzer, FortiGate 6000F, FortiADC, SKU Lookup. Request a quote.
| Model | Devices/VDOMs (default) | Max (w/ add-on) | GB/day | Usable storage | Form |
|---|---|---|---|---|---|
| FMG-200G | 30 | — | 2 | 4 TB | 1U |
| FMG-410G | 150 | — | 2 | 24 TB | 2U |
| FMG-1000G | 1,000 | — | 2 | 24 TB | 2U |
| FMG-3100G | 4,000 | 8,000 | 10 | 56 TB | 3U |
| FMG-3750G | 10,000 | 100,000 | 10 | ~336 TB (RAID50 default path) | 4U |
Sustained log rates on datasheet are modest (≈50–150) — FMG is not a substitute for FAZ when you need heavy analytics ingest.
| Model | Interfaces (datasheet) | Raw storage (typical) |
|---|---|---|
| FMG-200G | 4× RJ45 GE | 8 TB (2× 4 TB) |
| FMG-410G | 4× GE RJ45 + 2× SFP | 32 TB SED |
| FMG-1000G | 2× 2.5GBase-T + 2× 25GbE SFP28 | 32 TB SED |
| FMG-3100G | 2× GE RJ45 + 2× 25GbE SFP28 | 64 TB + NVMe SSD |
| FMG-3750G | 2× 10GbE RJ45 + 2× 25GbE SFP28 | 384 TB HDD + large NVMe SED |
Overview
Quick Answer: Single pane for FortiGate and wider Fabric provisioning: policy packages, ADOMs, firmware campaigns, and scripted changes, available as an appliance or a VM and deployable as an HA pair for production. Capacity is expressed in managed devices and VDOMs, while the logging allowance stays deliberately small.
vs FortiAnalyzer
Quick Answer: Buy FMG to push policy and manage lifecycle. Buy FAZ to retain and analyze logs at high GB/day. Best practice: both, with FAZ sized on analytic ingest. Policy packages / ADOMs / firmware SOC search / IOC / long retention logs.
| Need | Primary platform |
|---|---|
| Policy packages / ADOMs / firmware | FortiManager |
| SOC search / IOC / long retention logs | FortiAnalyzer |
| Device count scale | FMG devices/VDOMs + add-ons |
| Log ingest scale | FAZ GB/day + analytic rate |
Sizing Guide
Quick Answer: Inventory physical FortiGates + VDOMs + other managed Fabric objects, add growth headroom, then pick the next default tier (or 3100G/3750G + add-ons). Count devices and VDOMs (each VDOM = 1) Add FAZ if analytics are in scope Confirm device upgrade licenses for 3100G/3750G class.
- Count devices and VDOMs (each VDOM = 1)
- Decide ADOMs / MSSP multi-tenancy
- Plan HA pair for production
- Add FAZ if analytics are in scope
- Confirm device upgrade licenses for 3100G/3750G class
Use Cases
Quick Answer: Enterprise policy control plane, SD-WAN / Secure SD-WAN fleets, MSSP ADOMs, and Fabric-wide firmware campaigns. FMG-410G or FMG-1000G managing dozens to hundreds of FortiGates with consistent policy packages. Central templates for branch FortiGates; 1000G+ when site count and VDOM sprawl grow.
Campus / mid enterprise
FMG-410G or FMG-1000G managing dozens to hundreds of FortiGates with consistent policy packages.
Distributed / SD-WAN
Central templates for branch FortiGates; 1000G+ when site count and VDOM sprawl grow.
MSSP / large enterprise
FMG-3100G / 3750G with device add-ons and ADOMs; pair with high-capacity FortiAnalyzer.
Buying Checklist
Quick Answer: Devices/VDOMs → model → HA → optics → FortiCare → FAZ companion → add-on licenses if scaling past default. Licensed device/VDOM count (today + 24 months) HA topology and shared storage/network plan FortiAnalyzer BOM if logging is required Search Fortinet parts on SKU Lookup.
- Licensed device/VDOM count (today + 24 months)
- Hardware SKU vs FMG-VM stack
- HA topology and shared storage/network plan
- 25GbE optics on 1000G+
- Device upgrade licenses (3100G/3750G class)
- FortiAnalyzer BOM if logging is required
Search Fortinet parts on SKU Lookup.
Frequently Asked Questions
Quick Answer: FortiManager owns policy packages, ADOMs, and firmware, but its 2–10 GB/day logging cannot substitute for FortiAnalyzer analytics. Device add-on expansion exists only on the FMG-3100G and FMG-3750G class, so FMG-200G, 410G, and 1000G stay at 30, 150, and 1,000 devices. VM licenses stack by device count.
The official FortiManager PDF is on Fortinet: fortimanager.pdf. This page is the RFQ ladder — device count on 200G / 410G / 1000G versus add-on expansion on 3100G / 3750G — so you size before opening that PDF. Confirm ADOM and FortiCare on the quote.
No for serious analytics. FMG’s GB/day figures are small versus FAZ analytic platforms. Use FAZ for SOC-grade logging.
Datasheet shows add-on maximums on FMG-3100G / FMG-3750G class. Entry 200G/410G/1000G are sized to their default device counts — plan an appliance upgrade when you outgrow them.
Yes — FortiManager-VM licenses stack by devices/VDOMs (up to very large counts per datasheet). Hardware is preferred when you want appliance RAID and dual PSU operational models.
BENQUAN GLOBAL LIMITED supplies FortiManager G-Series and support. Contact info@benquan.hk or request a quote.
Key Takeaway
Key Takeaway: Size on devices plus VDOMs with two years of headroom, then respect one hard boundary: add-on device licenses exist only on the 3100G and 3750G class, so entry appliances stay at their default counts forever. Budget FortiAnalyzer separately. BENQUAN GLOBAL LIMITED supplies FortiManager G-Series appliances with competitive pricing.