Quick Take
Quick Take: End-of-Order on the 70F, 80F and 100F removes the safe option of reordering what you already run. The successor is not chosen by name similarity: check firewall and threat throughput, port mix and HA cabling before approving a 90G or 120G BOM, and carry the existing FortiGuard tier onto the successor SKU.
What End-of-Order Changes for Buyers
Quick Answer: EoO stops new factory orders for that SKU. You may still buy remaining distributor inventory for a short window, but identical replacements and multi-site rollouts become unreliable. Treat EoO as a forced BOM decision: migrate to G-series now, or accept scarce F-series leftovers with an explicit spare plan.
Renewal teams that keep quoting “same model, one more year” on 70F/80F/100F will hit a wall: factory builds stop, channel stock thins, and spare identical units become lottery tickets. This page is the migration RFQ playbook — not a renew-vs-refresh TCO essay (use renewal vs hardware refresh for that).
Related: renewal SKU bundle trap, Fortinet Q3 2026 list increase, 100F/200F specs, 900G specs. BENQUAN GLOBAL LIMITED supplies Fortinet FortiGate hardware and FortiCare/FortiGuard bundles with worldwide shipping — request a free migration BOM risk assessment.
| Lifecycle signal | What it means | Procurement action |
|---|---|---|
| End-of-Order (EoO) | No new factory builds | Stop copying last year’s OPN into new projects |
| Channel inventory only | Finite ATP, no replenishment | RFQ stock with expiry; parallel-quote G-series |
| End-of-Support (later) | Signatures/TAC eventually end | Plan migration years before EoS, not at EoS |
| List uplift (e.g. Aug 2026) | Baseline price moves on remaining SKUs | Do not let EoO + list hike stack unplanned |
Reported 2026 EoO clusters for mid-range F-series (confirm per SKU): 100F earlier in spring, 200F earlier still, 70F / 80F / 600F into May windows on many channel calendars. If your estate still standardizes on those OPNs for new sites, the standard is already obsolete.
Migration Map: 70F / 80F / 100F → 90G / 120G
Quick Answer: Use KPI mapping, not name similarity. Branch/campus edge designs on 70F/80F usually shortlist FortiGate 90G; 100F-class designs usually shortlist 120G. Re-check firewall/threat throughput, port mix (GE vs 10G SFP+), and HA cabling before you approve the successor BOM.
| Current F-series tier | Typical G-series path | What to re-validate |
|---|---|---|
| 70F / 80F | 90G | NP ASIC gen, 10G uplinks, PoE-less port count |
| 100F | 120G | Threat throughput, SFP+ needs, HA pair optics |
| 200F | Next G-series mid-range (site-specific) | Do not assume 120G covers every 200F KPI |
| 600F | 900G-class or sized mid/high G SKU | See 900G guide; size to threat KPI |
1. Freeze the security KPI band
Required threat-protection throughput, SSL inspection expectation, VPN concurrency, and port map. Marketing “firewall throughput” alone will oversize or undersize the G-series pick.
2. Decide HA and spare policy
EoO makes identical cold spares scarce. Prefer active-passive G-series pairs with a documented spare SKU — or accept longer RMA risk in writing.
3. Keep configuration migration in the project plan
Hardware OPNs are only half the BOM. Budget FortiConverter / cutover windows so the G-series box is not idle while policy is still on the F-series.
The Bundle Trap on Migration Quotes
Quick Answer: Migration quotes often look cheaper because the support tier dropped. Carry the live FortiGuard service set forward — Essentials is not UTP. Match suffixes line-by-line on the G-series SKU the same way you would on a renewal. See the bundle trap guide before you sign.
- Export live FortiGuard licenses from the F-series GUI before the RFQ.
- Require the partner to map each service to the G-series bundle OPN.
- Reject “hardware only” migration quotes if production still needs IPS/web filter/AV.
- Stack this check with any August 2026 list timing on subscriptions.
RFQ Sequencing Before Stock and List Cuts
Quick Answer: Run one RFQ with two columns: remaining F-series channel stock (qty, ship date) and G-series primary BOM (90G/120G + bundles). Pick per site — do not wait for “one more F-series pallet” that never replenishes while August list exposure grows.
Path A — Finish with channel F-series
Only for sites already designed on F-series with near-term cutover and verified ATP. Buy spares in the same PO; assume no second buy.
Path B — Standardize on G-series
Default for new sites and multi-site rollouts. Quote 90G/120G (or sized alternate) with matched UTP-class services and HA pairs.
Path C — Hybrid estate
Keep healthy F-series under FortiCare until EoS planning, but stop new OPNs. Every new closet or replacement uses G-series only.
Buyer Checklist Before You RFQ
Quick Answer: Attach model/serial inventory, live FortiGuard tiers, target successor OPNs (90G/120G), HA/spare policy, and cutover dates. Ask for channel F-series qty and G-series ATP side by side — a single lump quote hides whether you are buying leftovers or a sustainable standard.
- Live FortiGate models and serials exported
- EoO status confirmed per OPN (not assumed from blog dates)
- KPI band written (threat throughput, ports, VPN, HA)
- Successor map: 70F/80F→90G, 100F→120G (or documented alternate)
- FortiCare / FortiGuard bundle suffixes matched to live services
- Channel F-series stock qty + ship date requested
- G-series ATP and lead time requested in the same RFQ
- August list exposure noted if PO cannot clear earlier
Frequently Asked Questions
Quick Answer: Several mid-range F-series FortiGates hit EoO in 2026; new buys map to 90G/120G-class G-series; channel leftovers are finite; EoO is not immediate EoS. Re-freeze the BOM with matched bundles and RFQ stock versus G-series ATP before the next list cut.
Channel notices commonly include 70F, 80F, 100F, 200F, and 600F on staggered 2026 dates. Confirm the exact calendar for your OPN with Fortinet or your partner before you freeze CapEx.
For new procurement, 90G commonly replaces 80F (and many 70F) use cases; 120G commonly replaces 100F-class designs. Re-validate ports and threat throughput against your KPI band.
Often only from remaining channel inventory. Treat it as a short ATP window. New multi-site standards should quote G-series with matched bundles.
No. Support and signatures can continue for years after EoO. The operational risk is spare hardware scarcity — which is why migration belongs on this year’s plan.
Send model/serial list and live bundle tiers via Free Compatibility & Delivery Risk Assessment or email info@benquan.hk. You receive successor mapping, bundle checks, and stock/ATP options from a global free-port hub.
Key Takeaway
Key Takeaway: Stop waiting on one more F-series pallet. Run a single RFQ that prices remaining channel stock against 90G and 120G availability side by side, match FortiGuard suffixes line by line, and decide per site. BENQUAN GLOBAL LIMITED supplies FortiGate 90G and 120G appliances with competitive pricing and worldwide shipping.