Cybersecurity / NGFW / Branch & Campus Edge / Migration / Procurement

FortiGate 90G vs 120G: is about 2.2 Gbps of threat protection enough, or do you need 2.8?

The two G-series NGFWs that carry most F-series migrations — 90G for 70F/80F-class sites, 120G for 100F-class edge. Throughput, ports, form factor, and the bundle RFQ checklist. No prices, no hype.

Quick Take

Quick Take: FortiGate 90G (desktop, ~2.2 Gbps threat protection) suits 70F/80F-class sites; 120G (1U, ~2.8 Gbps, 10GE FortiLink, dual PSU) carries 100F-class edges. Size on threat protection, tunnel counts, and port mix — then keep UTP bundles intact. Official FortiGate 90G vs 120G datasheet figures guide sizing — confirm SKUs on the quote.

When 90G vs 120G Actually Matters

Quick Answer: This comparison matters when freezing a G-series successor bill of materials for F-series sites, mapping 70F and 80F to the 90G and 100F-class to the 120G. Validate threat protection throughput, tunnel capacity and port mix before issuing the RFQ, because name similarity does not guarantee spec equivalence.

70F/80F/100F End-of-Order windows are converting "same model, one more year" renewals into hardware decisions. The failure mode is not choosing 90G or 120G — it is quoting hardware without matching FortiCare/FortiGuard bundle lines, or mapping a site to the wrong port mix.
2.2/2.8
Threat Protection Gbps
3M
Sessions (Both)
10GE
FortiLink on 120G
1U
120G Rack Form

F-Series Successor Map — 70F / 80F / 100F → 90G / 120G

Quick Answer: FortiGate 90G commonly replaces the 80F and many 70F deployments, keeping the desktop form factor with WiFi and PoE variants. FortiGate 120G commonly replaces 100F-class branch and campus edges in 1U with SFP uplinks. 200F-class sites escalate to the 200G rather than the 120G.

Outgoing model Default successor Migration note
70F / 80F FortiGate 90G Desktop form factor, GE-only uplinks, WiFi/PoE variants (FWF-90G, FPOE-90G) keep rack space and cabling unchanged
100F FortiGate 120G 1U rack, SFP + 10GE FortiLink slots, higher IPS/threat protection headroom for campus and HQ branches
200F FortiGate 200G Do not assume 120G covers every 200F KPI — 200G carries ~6 Gbps threat protection, 8x 10GE SFP+, and 11M sessions for the next band
60F FortiGate 70G / 90G Small-office 60F-class sites usually land on 70G; use 90G when SSL inspection or SD-WAN headroom matters

Mapping traps

Name similarity is not a spec: "G-series is newer" is true, but the port mix differs — 90G has no SFP slots, 120G adds 8x GE SFP and 4x 10GE SFP+. Tunnel ceilings differ: 90G supports 200 gateway-to-gateway IPsec tunnels, 120G supports 2,000 — a multi-site SD-WAN mesh on 90G will need re-design. HA pairs: check FortiLink uplink and HA cabling before approving the successor pair, not after delivery.

Performance & Capacity

Quick Answer: The 120G outruns the 90G on every published metric: 39 against 28 Gbps firewall, 3.1 against 2.5 Gbps NGFW, 2.8 against 2.2 Gbps threat protection, and 2,000 against 200 gateway-to-gateway tunnels. Both hold 3 million concurrent sessions. Size on threat protection with SSL inspection enabled.

Metric (enterprise traffic mix) FortiGate 90G FortiGate 120G
Firewall throughput (1518/512/64 byte) 28 / 28 / 27.9 Gbps 39 / 39 / 28 Gbps
IPS throughput 4.5 Gbps 5.3 Gbps
NGFW throughput 2.5 Gbps 3.1 Gbps
Threat protection throughput 2.2 Gbps 2.8 Gbps
IPsec VPN throughput (512 byte) 25 Gbps 35 Gbps
SSL inspection (IPS, avg HTTPS) 2.6 Gbps 3 Gbps
Concurrent sessions 3 million 3 million
New sessions / second 124,000 140,000
Firewall policies 5,000 10,000
GW-to-GW IPsec tunnels 200 2,000
Client-to-GW IPsec tunnels 2,500 16,000
SSL-VPN users (recommended) 200 500
Firewall latency (64 byte) 3.23 µs 3.17 µs

Sizing rule

Buy against threat protection with SSL inspection enabled, not the firewall-only number. A site needing 2 Gbps of inspected traffic has no headroom on 90G (2.2 Gbps published); it belongs on 120G. Both figures follow Fortinet datasheets — re-validate on your FortiOS release notes and confirm NP/CP generation with your partner.

Hardware, Interfaces & Form Factor

Quick Answer: 90G is a desktop unit with 8x GE RJ45 plus 2x 10GE shared port pairs and WiFi/PoE variants; 120G is a 1U rack appliance with 18x GE RJ45, 8x GE SFP, 4x 10GE SFP+ FortiLink slots, dual PSUs, and a 480 GB SSD option on the 121G.

Hardware FortiGate 90G FortiGate 120G
GE RJ45 ports 8x GE RJ45 + 2x 10GE shared port pairs 18x GE RJ45 (16 switch ports + MGMT + HA)
SFP / 10GE slots Shared 10GE port pairs 8x GE SFP, 4x 10GE SFP+ FortiLink slots
Form factor Desktop 1U rack mount (44 x 432 x 254 mm)
Power Single AC PSU, dual inputs Dual AC PSUs (1+1 redundancy)
Local storage 120 GB SSD on 91G variant 480 GB SSD on 121G variant
Hardware acceleration SoC4-class SPU SP5-class SPU
Variants WiFi, PoE, 3G4G, DSL, Bypass, Storage — (rack appliance)
Max FortiSwitches 24 48
Max FortiAPs (total / tunnel) 128 / 64 128 / 64
Virtual domains 10 / 10 10 / 10

Port-mix reality check

If the current 100F site runs SFP uplinks to the ISP or aggregation switch, 90G has no SFP slot — the successor is 120G or a transceiver re-design. If the site is a compact GE-only office, a 120G wastes rack units and the 10GE FortiLink bank. Match the successor to the cabling, not the badge.

90G or 120G — Decision Rules

Quick Answer: Choose the 90G for compact GE-only branch sites up to 200 SSL-VPN users and 200 site-to-site tunnels, especially where desktop form factor, WiFi or PoE matters. Choose the 120G for rack-mounted sites needing SFP or 10GE uplinks, dual power supplies, 500 SSL-VPN users, 2,000 tunnels or 10,000 policies.

Shortlist FortiGate 90G when

  • Site is a compact GE-only office or shop floor — no SFP or 10GE uplinks planned in the next refresh cycle
  • Desktop form factor is a requirement or a rack-unit saving
  • WiFi or PoE is needed on the same unit (FWF-90G / FPOE-90G variants)
  • Under 200 concurrent SSL-VPN users and under 200 gateway-to-gateway tunnels
  • Up to 24 FortiSwitches and 128 FortiAPs in the local fabric

Shortlist FortiGate 120G when

  • Site is rack-mounted in a wiring closet or campus node with SFP or 10GE uplinks
  • Threat protection above ~2.2 Gbps with SSL inspection — headroom for 1 Gbps-plus inspected WAN links
  • Multi-site SD-WAN mesh needs more than 200 gateway-to-gateway tunnels
  • 500 SSL-VPN users or 10,000 firewall policies are in the KPI band
  • Dual PSU redundancy or 480 GB local SSD logging (121G) is a requirement
When in doubt, size both candidates on the same KPI sheet — threat protection at your SSL inspection %, tunnel count, and port mix — and put both lines on one RFQ. Vendors will happily quote a desktop 90G for a site that needed 120G uplinks.

FortiCare & FortiGuard Bundles — Carry UTP Intact

Quick Answer: Migrating to a new model means re-purchasing FortiCare support and FortiGuard subscription lines, because bundle SKUs are model-specific and cannot transfer from F-series. Carry UTP-class coverage at Enterprise or ATP tier from the old bill of materials, confirm 24x7 FortiCare, and match the term to the End-of-Order calendar.

  • FortiCare: 24x7 renewal and TAC access — confirm 1-, 3-, or 5-year term on the quote; the term drives the effective per-year cost.
  • FortiGuard UTP: Unified Threat Protection (Enterprise or ATP tier) covers IPS, AV, web filter, and security ratings in one bundle — Essentials-only quotes leave IPS/web-filter gaps on production edges.
  • Bundle SKU hygiene: FortiCare and FortiGuard lines are model-specific — an F-series bundle cannot transfer to 90G/120G. Look up exact part numbers in SKU Lookup before RFQ.
  • Hygiene rule: A migration BOM with hardware but no service lines will under-deliver — every production firewall needs matched support and subscription years on the same PO.

Why bundle lines break migrations

The most common RFQ defect in F-series-to-G-series projects is hardware-only pricing. Renewal teams treat the new unit like an RMA and forget UTP line items, then discover the deployed box has no IPS signature coverage at go-live. Put FortiCare + FortiGuard UTP on the same BOM line as the appliance.

RFQ Checklist — Freeze the Successor BOM

Quick Answer: Issue one RFQ per site band carrying the source model with its End-of-Order date, the successor choice, port mix, high availability pair count, FortiCare term, FortiGuard UTP tier and delivery lead time. Put both 90G and 120G candidates on the same brief whenever the KPI sheet is close.

What to put on the RFQ

  • Source model per site: 70F / 80F / 100F — and the confirmed End-of-Order date for each SKU
  • Successor mapping: 90G vs 120G vs 200G per site band, with the KPI sheet used to decide
  • Threat protection target at your SSL inspection percentage — not firewall-only Gbps
  • Port mix: GE-only, SFP uplinks, or 10GE FortiLink — matches cabling and switch uplinks
  • HA design: active-passive pair count, FortiLink uplinks, and failover cabling
  • FortiCare: 24x7, 1/3/5-year term on every unit
  • FortiGuard UTP tier: Enterprise or ATP, per-unit, matching the old subscription levels
  • FortiSwitch / FortiAP scale if the fabric grows with the refresh
  • Delivery lead time and staging date — align with EoO stock windows
  • Both candidates on one brief when the KPI sheet is close — 90G and 120G lines priced side by side

Submit the migration brief on rfq.html.

Which Part Numbers Should You Freeze on the RFQ (1 SKUs)?

Quick Answer: When quoting FG-120G and sibling configurations across these 1 part numbers, lock the exact base MPN, redundant power supplies, optics, and matching 1-year or 3-year support tier on separate lines before comparing vendor discounts. Channel net pricing remains industry estimate / pending confirmation.

Ordering SKUKey Configuration & BoundaryAdjacent BOM Lines to Freeze
FG-120G1U, 4x10GE SFP+, dual PSU, ~2.8 Gbps threat protection, 2,000 tunnels. Not FG-90G.Second FG-120G, GE SFP / 10GE SFP+ as drawn, FortiCare + UTM years, FG-121G

Frequently Asked Questions

Quick Answer: The 90G is the desktop G-series successor for 70F and 80F-class GE-only sites, while the 120G is the 1U rack successor for 100F-class edges with SFP and 10GE uplinks and far higher tunnel ceilings. Size on threat protection, tunnels and ports, then carry UTP bundles intact.

Fortinet publishes both sheets on its resources hub: 90G series and 120G series. This page is the RFQ comparison — threat protection, 10GE count, and the F-Series successor map — so you pick 90G or 120G before opening those sheets. Confirm FortiCare years on the quote.

FortiGate 90G is a desktop NGFW with 8x GE RJ45 plus 2x 10GE shared port pairs, ~2.2 Gbps threat protection, and 200 gateway-to-gateway tunnels. FortiGate 120G is a 1U rack unit with 18x GE RJ45, 8x GE SFP, 4x 10GE SFP+, dual PSUs, ~2.8 Gbps threat protection, and 2,000 tunnels.

Yes for most 100F-class branch and campus edge designs — 120G exceeds 100F throughput and adds 10GE FortiLink slots. Confirm port mix, HA cabling, and UTP bundle lines on the quote before freezing the BOM.

GE-only desktop sites with WiFi/PoE needs fit 90G. Rack-mounted sites with SFP or 10GE uplinks, dual PSU, 500 SSL-VPN users, or more than 200 site-to-site tunnels should shortlist 120G.

121G adds a 480 GB SSD for local logging and disk-dependent features. Estates logging to FortiAnalyzer can take the 120G. Choose 121G when local disk logging or caching matters.

Submit one RFQ with the successor mapping and bundle checklist on the same brief.

Key Takeaway

Key Takeaway: Pick on port mix and tunnel ceiling, not the model number: 90G is the desktop GE-only box, 120G the rack edge with SFP and 10GE uplinks. Size against threat protection throughput with SSL inspection enabled, since that figure collapses fastest under real policy. BENQUAN GLOBAL LIMITED supplies FortiGate 90G and 120G units and FortiCare UTP bundles with competitive pricing.

Not sure which G-series BOM is optimal?

If 90G vs 120G sizing, port mix, HA pairs, or UTP bundle lines are unclear, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents