Quick Take
Quick Take: A tender BOM that says "servers, switches, storage" buys you three different kits and a price comparison that means nothing. Write 9 fields on every line — function, performance floor, quantity with units, interfaces and optics, licence term, power and cooling, warranty, delivery window, acceptance test — add a deviation table, and ask for one alternative column. Then bids differ in price and delivery, not in what is being bought.
You are not writing paperwork. You are deciding what the evaluation committee will be able to compare. Spend two hours on the BOM now, or spend a tender round re-running it later. Send us the draft clauses and we will mark the lines that will come back incomparable, before the tender opens.
What goes wrong when the FG-400G RFQ uses the biggest Gbps on the PDF?
Quick Answer: You award an empty-track test. Production turns every FortiGuard blade on.
GSC already sends fortigate 400g datasheet and fg-400g datasheet queries to BENQUAN — and the specs page gets impressions with zero clicks when buyers need a sizing answer, not another chassis photo. Typical scene: finance compares “164 Gbps” on FG-400G against another vendor’s Threat Prevention figure. After cutover, IPS and TLS decrypt are on; latency climbs and new sessions fail.
This page is model-specific: which FortiGate 400G datasheet rows are eligible for award. The general rulebook lives on NGFW throughput: which datasheet rows to size. Ports and optics stay on the FG-400G/401G specs RFQ page.
Soft channel Mbps below are industry-published “up to” figures from Fortinet’s public series sheet — pending confirmation on your dated PDF.
FG-400G datasheet rows — which ones bind the RFQ?
Quick Answer: Same appliance, stacked numbers; award on the inspected rows.
| Datasheet row (Enterprise Mix) | Public sheet (up to) | Use for FG-400G sizing? |
|---|---|---|
| IPv4 Firewall (1518/512/64 UDP) | ~164 / 164 / 145 Gbps | No — not award metric |
| IPS | ~25 Gbps | Only if IPS-only profile |
| NGFW (FW + IPS + App Control) | ~14 Gbps | Only if footnotes = your blades |
| Threat Protection (+ Malware) | ~13 Gbps | Default yes |
| SSL Inspection (IPS, avg HTTPS) | ~11.5 Gbps | Required if you decrypt |
| SSL Inspection CPS / sessions | ~9,700 / ~3M | With decrypt path |
| New sessions/sec (TCP) / concurrent | ~580k / ~28M | Always beside Gbps |
Fortinet footnotes: NGFW = firewall + IPS + application control; Threat Protection adds malware protection; IPS/NGFW/Threat Protection measured with logging on. All values are “up to” and vary with configuration — Mbps pending confirmation. For interactive first-pass math, use firewall sizing calculator.
What “real” FG-400G throughput means for procurement
Quick Answer: Capacity with your FortiGuard profile on — not the UDP marketing ceiling.
Definition: for buying and tendering FortiGate 400G (FG-400G / FG-401G), real throughput is the sustained rate when the security features you will enable are on, under a mix close to production — including SSL inspection if you decrypt. It is not the maximum firewall UDP Gbps printed near the top of the datasheet.
Like rating a truck by towing with the trailer attached, not empty top speed. Fortinet labels the deep inspected row Threat Protection; Palo Alto materials often say Threat Prevention — different words, same RFQ idea. Model numbers and ports belong on the specs page; this page only freezes the metric name.
FG-401G matches published throughput rows and adds 2×480 GB onboard SSD. Pick 401G for local disk logging — do not invent a different Gbps story for the disk SKU.
Lock FG-400G metrics on the RFQ, 6 steps
Quick Answer: Blades → Threat Protection → SSL if decrypt → CPS/sessions → PDF date → calculator check.
- Step 1 — List blades that stay on day one — IPS, app control, antivirus/malware, URL, sandbox, SSL decrypt — if enabled, it belongs in the sizing row.
- Step 2 — Circle Threat Protection on the FG-400G PDF — Enterprise Mix Threat Protection (~13 Gbps). Strike ~164 Gbps firewall UDP for award math.
- Step 3 — Add SSL inspection if you decrypt — Lock ~11.5 Gbps SSL inspection and ~9,700 SSL CPS when decrypt is in scope.
- Step 4 — Write CPS and session ceilings — Put new sessions/sec and concurrent sessions beside Gbps on the RFQ.
- Step 5 — Attach datasheet page and revision date — Require every bidder to cite the same named row and PDF date.
- Step 6 — Cross-check headroom with the calculator — Run peak bandwidth + TLS share through /firewall-sizing-calculator.html; method detail on the NGFW companion article. Mbps pending confirmation.
Small first step: open your dated FortiGate 400G PDF. Highlight Threat Protection and SSL inspection. If the RFQ still cites only “firewall throughput,” rewrite that line before you compare price.
Who must use Threat Protection — who can simplify?
Quick Answer: Campus edge with TLS decrypt: deep rows mandatory. Low-decrypt segments: still ban UDP-only awards.
Internet or campus edge with HTTPS decrypt. SSL inspection (~11.5 Gbps) and SSL CPS bind design. Size HA so failover does not strand CPS. Threat Protection alone is not enough if decrypt is planned.
Internal segmentation with IPS + app control, limited decrypt. Threat Protection (~13 Gbps) may bind — still print blade names on the RFQ so sellers cannot substitute the 164 Gbps firewall line.
- Fit: any FG-400G / FG-401G RFQ naming Gbps; equal-BOM multi-vendor bake-off; buyers who landed on the datasheet query with zero useful click.
- Not fit: branch 40F/90G class; hyperscale chassis needs; already-measured production FG-400G with proven Threat Protection headroom.
FG-400G datasheet traps on RFQ
Quick Answer: Award on 164 Gbps, ignore SSL, skip CPS, undated PDF.
| Trap | What happens | Fix |
|---|---|---|
| Award on ~164 Gbps FW UDP | Blades-on collapse | Threat Protection ~13 Gbps |
| Ignore SSL row | Decrypt kills capacity | ~11.5 Gbps + SSL CPS |
| Gbps only | CPS exhaustion | Add sessions/sec |
| Use average Mbps | Peaks drop sessions | 95th percentile + headroom |
| No PDF date | Stale row | Page + revision on RFQ |
| Confuse 400G with 400F | Wrong generation sheet | Confirm FG-400G / FG-401G stem |
Cross-brand comparisons still need the same named row — open the NGFW datasheet-vs-real method before you mix Fortinet Threat Protection with another vendor’s firewall headline.
Frequently Asked Questions
Quick Answer: A tender BOM is the issuer's pricing baseline: same lines, same units, same licence years. Bidders answer with a deviation table, and the committee compares lines, not totals.
Default to Threat Protection (~13 Gbps, Enterprise Traffic Mix on Fortinet’s public FG-400G sheet). If you decrypt HTTPS, also lock SSL inspection (~11.5 Gbps avg HTTPS). Do not award on IPv4 firewall UDP (~164 Gbps). Mbps pending confirmation — re-check your PDF revision date.
Firewall UDP large-packet figures measure forwarding with inspection off or minimized. Threat Protection includes firewall + IPS + application control + malware protection with logging. Same chassis, different test — the deeper row is the procurement metric. See the companion NGFW method article for the general rule.
Only if production will decrypt. When decrypt is in scope, SSL inspection throughput (~11.5 Gbps) and SSL CPS (~9,700) bind capacity before Threat Protection Gbps alone. Put both on the RFQ line.
Published Enterprise Mix throughput rows match FG-400G; FG-401G adds onboard SSD. Throughput sizing is the same; choose 401G when local disk logging is mandatory — that is a BOM decision, not a Gbps decision.
New sessions/sec (TCP ~580,000 on the public sheet) and concurrent sessions (~28 million), plus SSL CPS/sessions if you decrypt. Bandwidth can look fine while CPS is exhausted. Mbps and CPS pending confirmation on dated datasheet.
The specs page freezes ports, SKU stem and optics BOM. This page answers which throughput/SSL rows to lock for sizing and award. Use both; for the cross-brand method, open the NGFW datasheet-vs-real article and the firewall sizing calculator.
References
Quick Answer: Buyer behaviour figures come from the G2 and TechnologyMatch 2026 surveys; tender scale from DoNews award tracking for the first seven months of 2026. Checked 21 October 2026.
Key Takeaway
Key Takeaway: Size and RFQ FortiGate 400G on Threat Protection (~13 Gbps) — and SSL inspection (~11.5 Gbps) when you decrypt — not ~164 Gbps firewall UDP. BENQUAN GLOBAL LIMITED supplies FortiGate 400G series with competitive pricing for equal-BOM RFQs that name the same datasheet rows; Mbps pending confirmation.