Quick Take
Quick Take: FortiGate 400F / 401F is the mid-enterprise 1U NGFW between 200G and 600F — NP7 plus CP9, about 9 Gbps threat protection, 8x 10GE SFP+ with four ULL, 5,000 SSL-VPN users, dual PSU. Prefer 401F for dual 480 GB SSDs..
Performance & Capacity
Quick Answer: The FortiGate 400F publishes roughly 9 Gbps threat protection, 12 Gbps intrusion prevention, 10 Gbps next-generation firewall and 79.5 Gbps firewall throughput on NP7 and CP9 processors, with 7.8 million concurrent sessions, 500,000 new sessions per second and 5,000 recommended SSL VPN users. Buy against the threat protection figure.
| Metric (enterprise traffic mix) | FortiGate 400F | FortiGate 200G (adjacent band) |
|---|---|---|
| Firewall throughput (1518/512/64 byte) | 79.5 / 78.5 / 70 Gbps | 39 / 39 / 26.5 Gbps |
| IPS throughput | 12 Gbps | 9 Gbps |
| NGFW throughput | 10 Gbps | 7 Gbps |
| Threat protection throughput | 9 Gbps | 6 Gbps |
| SSL inspection (IPS, avg HTTPS) | 8 Gbps | 7 Gbps |
| IPsec VPN throughput (512 byte) | 55 Gbps | 36 Gbps |
| Concurrent sessions | 7.8 million | 11 million |
| New sessions / second | 500,000 | 400,000 |
| SSL-VPN users (recommended) | 5,000 | 500 |
| SSL inspection concurrent sessions | 800,000 | 900,000 |
| Firewall latency (64 byte) | 4.19 µs / 2.5 µs on ULL ports | 4.36 µs |
Sizing rule
Buy against threat protection with SSL inspection enabled — the 9 Gbps TP figure, not the 79.5 Gbps firewall-only number. Note the session trade-off: 400F publishes 7.8M sessions versus 200G's 11M — high-connection-count fabrics without the throughput need may actually fit 200G better. Figures follow Fortinet datasheets; re-validate on your FortiOS release notes.
When FortiGate 400F Matters
Quick Answer: The FortiGate 400F sits in the mid-enterprise band above the 200G, serving campus and data center edges that need roughly 9 Gbps of threat protection, 10GE uplinks including ultra-low-latency ports, and up to 5,000 SSL VPN users on a single one-rack-unit next-generation firewall.
- Not this page: FortiGate 200G/201G specs — the ~6 Gbps band with 5GE multi-rate copper and NP7Lite/CP10.
- Not this page: FortiGate 600F vs PA-1400 — the ~10.5 Gbps band with 25G uplinks and its Palo Alto peer comparison.
- Adjacent tiers: 90G vs 120G for branch scale, 900G for the high-end campus/DC band.
- Outgoing estate: FortiGate 100F/200F specs — the F-series baseline many 400F shortlists are migrating from.
Hardware, Interfaces & Variants
Quick Answer: 400F is a 1U appliance with 16x GE RJ45 plus 2x MGMT/HA, 8x GE SFP, 4x 10GE SFP+ and 4x 10GE ULL slots, dual hot-swap PSUs, and NP7/CP9 — 401F adds dual 480 GB SSDs; -DC SKUs take DC power.
| Hardware | FortiGate 400F | FortiGate 401F |
|---|---|---|
| GE RJ45 ports | 16x GE RJ45 + 2x GE MGMT/HA | |
| GE SFP slots | 8x GE SFP | |
| 10GE SFP+ slots | 4x 10GE SFP+ + 4x 10GE SFP+ ULL | |
| Acceleration | NP7 + CP9 | |
| Onboard storage | None | 2x 480 GB SSD (960 GB) |
| Form factor | 1U rack mount (44.45 x 432 x 380 mm) | |
| Power | Dual hot-swap AC PSUs; -DC SKUs with dual DC PSUs | |
| Max FortiSwitches | 72 | |
| Max FortiAPs (total / tunnel) | 512 / 256 | |
| Virtual domains | 10 / 10 | |
| Included transceivers | 2x 1GE SFP SX | |
Variants to spec, not guess
FG-401F carries dual 480 GB SSDs for local logging — choose it when FortiAnalyzer is not yet standardized. FG-400F-DC / FG-401F-DC run on 48–60VDC with dual DC PSUs for carrier and data-center racks. Both -DC SKUs keep the same NP7/CP9 performance envelope.
Use Cases
Quick Answer: The FortiGate 400F fits mid-enterprise campus edges, 10GE aggregation and internet gateways, remote access hubs of up to 5,000 SSL VPN users, and latency-sensitive data center segments, managing up to 72 FortiSwitch units and 512 FortiAP access points under a single security fabric. Audit port mix against existing cabling.
Mid-enterprise campus edge
Consolidated NGFW for campuses outgrowing the 200G band — ~9 Gbps threat protection with SSL inspection headroom, 72 managed FortiSwitches over FortiLink, and 512 FortiAPs for distributed access.
10GE internet gateway and WAN hub
8x 10GE SFP+ slots (4 standard, 4 ULL) give dual-ISP WAN, DMZ, and core uplinks without shared-port compromises — the natural WAN hub for regional offices before the 600F band with 25G uplinks is needed.
SSL-VPN remote access hub
5,000 recommended SSL-VPN users and 800,000 concurrent SSL inspection sessions make 400F a practical enterprise remote-access hub — a common 401F landing spot when local log storage matters.
Latency-sensitive DC edge
The four 10GE ULL ports hold ~2.5 µs firewall latency for trading-adjacent, east-west, and real-time segments — 400F is one of the few mid-enterprise NGFWs that publishes a separate ULL latency figure.
Buying Checklist — Freeze the 400F BOM
Quick Answer: For each site, put on the request for quotation a key performance sheet stating threat protection at your SSL inspection percentage, session counts, SSL VPN users and port mix, candidate lines for 400F against 200G or 600F, the 401F solid-state drive and DC power decisions, high availability pairs, FortiCare term, unified threat protection tier and delivery lead time.
What to put on the RFQ
- Threat protection target at your SSL inspection percentage — not firewall-only Gbps
- 400F vs 200G vs 600F candidate lines on the same brief when the band is close
- 401F decision: dual 480 GB SSDs for local logging vs FortiAnalyzer-based logging
- -DC variant decision when the rack runs 48–60VDC power
- Port mix audit: GE vs SFP vs 10GE SFP+ vs ULL ports against existing cabling
- HA design: active-passive pair count, dedicated HA links, failover cabling
- FortiCare: 24x7, 1/3/5-year term on every unit
- FortiGuard UTP tier: Enterprise or ATP, matching the outgoing subscription levels
- FortiSwitch / FortiAP scale for fabric growth (up to 72 / 512+256)
- Delivery lead time and staging date — align with EoO stock windows
Submit the sizing brief on rfq.html.
Frequently Asked Questions
Quick Answer: 400F/401F is the ~9 Gbps threat protection band between 200G and 600F — NP7/CP9, 8x 10GE SFP+ with ULL ports, 5,000 SSL-VPN users. 401F adds dual 480 GB SSDs; -DC SKUs take DC power. Size on TP with SSL inspection.
The official FortiGate 400F Series PDF is on Fortinet: fortigate-400f-series.pdf. This page is the RFQ table — FG-400F versus FG-401F logging disks — so you size NP7 throughput before opening that PDF. Confirm FortiCare years on the quote.
Same networking and performance. FG-401F adds two 480 GB onboard SSDs for local logging and disk-dependent features; FG-400F has no onboard storage. Both ship as 1U units with NP7/CP9 and dual AC PSUs.
200G covers the ~6 Gbps threat protection band with 5GE multi-rate copper and 11M sessions. 400F is the next band: ~9 Gbps TP, NP7/CP9, 8x 10GE SFP+ with four ULL ports, and 5,000 SSL-VPN users.
600F is the next band up at ~10.5 Gbps threat protection with 25G SFP28 uplinks. 400F covers the ~9 Gbps lane with 10GE SFP+ ULL ports and 72 FortiSwitches. If 25G uplinks are not planned, 400F usually fits the brief.
Four 10GE SFP+ ULL slots run at ~2.5 µs firewall latency versus 4.19 µs on standard ports — for latency-sensitive trading-adjacent and east-west traffic where microseconds matter.
Contact info@benquan.hk or request a quote.
Key Takeaway
Key Takeaway: The 400F/401F sits between the 200G and 600F: roughly 9 Gbps threat protection, NP7 and CP9, eight 10GE SFP+ ports including four ULL, 5,000 SSL-VPN users and 72 managed FortiSwitches in 1U with dual PSUs. Size on threat protection with SSL inspection and session scale. BENQUAN GLOBAL LIMITED supplies FortiGate 400F units and FortiCare UTP bundles with competitive pricing.