Security / NGFW

FortiGate 400G: do you need up to 13 Gbps of threat protection and 25GE, or only branch 10GE?

Enterprise campus and aggregation NGFW datasheet for FG-400G / FG-401G — Threat Protection, interfaces, and BOM checklist.

Quick Take

Quick Take: FortiGate 400G (FG-400G) and FG-401G are campus/aggregation NGFWs with up to 13 Gbps Threat Protection, 25 Gbps IPS, and 4×25GE SFP28. Fit when you need 25GE uplink density in 1U; skip if you only need branch 10GE. Confirm dated channel net — no public list prices here.

Front Panel — What Is FortiGate 400G?

Quick Answer: FortiGate 400G is Fortinet’s mid/high campus G-series firewall using NP7 and CP10 acceleration. FG-400G ships with no onboard SSD; FG-401G adds dual 480 GB SSDs for 960 GB total. Both share one port map: four 25GE, four 10GE FortiLink, sixteen 1GE SFP, and eight multi-gig RJ45 ports for RFQ.

Buyers searching fortigate 400g datasheet or FG-400G datasheet usually need three facts before RFQ: inspected throughput (Threat Protection / NGFW / IPS on Enterprise Traffic Mix), the exact interface mix for optics BOM, and whether local logging storage (401G) is mandatory. Brochure firewall Gbps with inspection off is not a sizing input.

This URL historically covered a combined “3500G/400G” slug in search; the live hardware identity for these queries is the FortiGate 400G series (SKU stems FG-400G / FG-401G) per Fortinet’s published data sheet. Adjacent chassis such as FortiGate 200G / 900G belong on their own datasheet pages — do not mix optics or FortiCare SKUs across families on one PO.

  • Form factor: 1U; default dual AC PSU (1+1 redundancy)
  • Acceleration: SPU NP7 + CP10
  • Included optics (typical sheet): 2× SFP SX — budget remaining 25GE/10GE optics separately
  • SSL inspection throughput (avg HTTPS, sheet): about 11.5 Gbps — size decrypt policies against this, not raw FW

Official Spec Snapshot (Enterprise Traffic Mix)

Quick Answer: On Fortinet’s published Enterprise Traffic Mix, FG-400G/401G list about 25 Gbps IPS, 14 Gbps NGFW, and 13 Gbps Threat Protection, with IPv4 firewall up to 164 Gbps on large UDP frames. Always re-check the PDF revision date before you freeze CapEx.

MetricFG-400G / FG-401GNotes
Threat Protection13 GbpsFW + IPS + App Control + Malware Protection
NGFW14 GbpsFW + IPS + App Control
IPS25 GbpsEnterprise mix
Firewall (1518/512/64 UDP)164 / 164 / 145 GbpsInspection off — not RFQ sizing alone
SSL inspection (avg HTTPS)~11.5 GbpsDecrypt budget
Concurrent sessions (TCP)~28 millionSheet value; validate vs session profile
25GE SFP284Also support 10GE optics in slot
10GE FortiLink SFP+4FortiSwitch fabric
1GE SFP16Access / server edges
5/2.5/1GE RJ458Multi-gig copper
Onboard storageNone / 2×480 GB400G vs 401G
Power (avg / max)~230–240 W / ~283–295 WConfirm PSU SKU on quote

Numbers above summarize Fortinet’s FortiGate 400G Series Data Sheet (public PDF). Treat any channel corridor price as industry estimate / pending confirmation — this page publishes no LIST or net.

FG-400G vs FG-401G — What Changes on the PO

Quick Answer: Throughput and ports match across the series; FG-401G adds onboard SSD for local disk logging. If logs already ship only to FortiAnalyzer or SIEM, FG-400G usually wins on BOM simplicity. When auditors demand local retention days, specify FG-401G on the purchase order explicitly.

DimensionFG-400GFG-401G
Inspected throughputSame sheet familySame sheet family
Ports4×25G + 4×10G FL + 16×1G SFP + 8× mGigIdentical map
StorageNone2×480 GB SSD
Typical RFQ triggerCentral logging already fundedLocal disk / offline retain
Risk if wrongNo local retain if FAZ path failsPaying SSD when unused

Also compare against FortiGate 200G (lower 25GE density) and FortiGate 900G (higher aggregation) before you lock the chassis line. This page’s limitation: it does not replace a live FortiGate sizing with your actual SSL policy and IPS profile.

Who Should Buy / Who Should Skip

Quick Answer: Buy FG-400G or FG-401G for campus core or aggregation that needs 25GE uplinks and about 13 Gbps Threat Protection in one rack unit. Skip for small branch 90G or 120G class, pure SD-WAN thin edge, or hyperscale data-center fabrics that need chassis or hyperscale blades instead.

Fit

  • Campus aggregation with FortiSwitch FortiLink on the 10GE slots
  • Multi-gig copper access plus 25GE uplinks in one box
  • HA pairs that must share one FortiCare account (see FortiCare transfer guide)

Unfit

  • Sites that never exceed ~5–7 Gbps inspected traffic — right-size down
  • Designs that need 100GE/400GE DC fabrics — wrong product family
  • Buyers expecting public e-commerce LIST on this page — use RFQ

HowTo: Freeze a FortiGate 400G RFQ

Quick Answer: Step through SKU stem, HA appliance count, FortiCare term years, optics lines, and logging path before CapEx freezes. Put FG-400G versus FG-401G on one equal-BOM sheet, then submit intent=bom-risk so support years and optics cannot stay TBD after the award date.

  1. Step 1 — Lock SKU stem: Choose FG-400G or FG-401G from the dated Fortinet sheet; do not mix with 400F or 3500F SKUs.
  2. Step 2 — HA math: Two appliances for active-passive/active-active; confirm FortiCare is one account for the pair.
  3. Step 3 — Optics BOM: Line every 25GE/10GE/1GE optic and DAC/AOC; sheet includes only 2× SFP SX.
  4. Step 4 — Logging: FortiAnalyzer / SIEM vs onboard 401G disk; write retention days on the RFQ.
  5. Step 5 — Validate on Lookup: Search Fortinet in SKU Lookup, then open BOM risk RFQ.

RFQ checklist (attach to the ticket)

  • Model: FG-400G or FG-401G × qty (include HA spare if required)
  • FortiCare / FortiGuard bundle years
  • Optics list with MPN + qty
  • Ship-by date and install site power (dual AC assumed)
  • Logging path (FAZ SKU or “401G disk only”)

Common BOM Mistakes on FG-400G Quotes

Quick Answer: Teams often size on 164 Gbps firewall UDP, omit 25GE optics lines, confuse FortiGate 400G with 400F, or forget FortiCare account unification on HA pairs. Fix those four traps before you compare any channel net or freeze the purchase order.

  • Raw FW Gbps as capacity: Use Threat Protection / SSL figures for user traffic.
  • Missing optics: 4×25GE + 4×10GE + 16×1GE without optics lines = dead on arrival.
  • Wrong family: FG-400F / FG-3500F are different platforms — never substitute silently.
  • Split FortiCare on HA: Breaks updates; follow the HA account transfer guide.
  • Ignoring 401G storage: Buying SSD you never mount, or skipping SSD when auditors require local retain.

Frequently Asked Questions

Quick Answer: FG-400G answers fortigate 400g datasheet searches with about 13 Gbps Threat Protection and dense 25GE ports; FG-401G adds local disk storage. Structure every RFQ as one equal-BOM with optics and FortiCare years, then submit bom-risk before you freeze CapEx spend.

FG-400G is the FortiGate 400G appliance SKU without onboard SSD: 4×25GE SFP28, 4×10GE FortiLink, 16×1GE SFP, 8× multi-gig RJ45, dual AC, NP7/CP10. Pair with FortiCare and optics on the same RFQ.

Throughput and ports match the same series sheet; FG-401G adds 2×480 GB onboard SSD (960 GB). Choose 401G when local disk logging is a hard requirement.

Use about 13 Gbps Threat Protection (Enterprise Traffic Mix) from Fortinet’s public sheet, then derate for your SSL policy — not the 164 Gbps firewall UDP headline.

No. Soft channel corridors are industry estimate / pending confirmation only. Send an equal-BOM RFQ for a dated net.

References

Quick Answer: Re-check Fortinet’s FortiGate 400G Series Data Sheet and Product Matrix before award; this page only summarizes Enterprise Traffic Mix throughput numbers. Public NGFW pages confirm family placement, and any channel net always stays an industry estimate pending confirmation on the RFQ.

Key Takeaway

Key Takeaway: Size FortiGate 400G on 13 Gbps Threat Protection and full 25GE optics lines, not raw firewall UDP Gbps. Pick FG-401G only when local disk retain is mandatory. BENQUAN GLOBAL LIMITED supplies FortiGate 400G series with competitive pricing for equal-BOM RFQs.

Not sure your BOM is optimal?

If assumptions, adjacency, or delivery risk are unclear, click below for a free compatibility and delivery risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents