Network Security / Branch / Midsize / SD-WAN / FortiLink

FortiGate 100F vs 200F: is usable capacity about 1 Gbps of threat protection, or 3?

Midsize enterprise NGFW + SD-WAN appliances — FortiGate 100F/101F and 200F/201F with dedicated FortiLink, dense GE/SFP, and enterprise-mix Threat Protection ratings.

Quick Take

Quick Take: FortiGate 100F and 200F are 1RU midsize NGFWs whose usable capacity is Threat Protection, not the 20 to 27 Gbps firewall headline: roughly 1 Gbps on the 100F against 3 Gbps on the 200F. Interface counts, SSL inspection limits and the 480 GB SSD variants follow below.

Performance Table

Quick Answer: The FG-100F carries about 1 Gbps of Threat Protection and 1 Gbps of SSL inspection; the FG-200F roughly triples both, at 3 and 4 Gbps, and doubles concurrent sessions to 3 million. Size on those two lines, because the 20-plus Gbps firewall figures assume no inspection at all.

Figures follow Fortinet FortiGate 100F / 200F Series datasheets (enterprise traffic mix, logging enabled for IPS/NGFW/TP). Confirm subscriptions and software train on the quote. Related: FortiSwitch, FortiManager G-Series, PA-400, SKU Lookup. Request a quote.

Metric FG-100F / 101F FG-200F / 201F
Firewall (UDP 1518)~20 Gbps~27 Gbps
IPS (enterprise mix)~2.6 Gbps~5 Gbps
NGFW~1.6 Gbps~3.5 Gbps
Threat Protection~1 Gbps~3 Gbps
IPsec VPN (512B)~11.5 Gbps~13 Gbps
SSL inspection (IPS, avg HTTPS)~1 Gbps~4 Gbps
Concurrent sessions (TCP)~1.5 M~3 M
Onboard SSD101F: 480 GB201F: 480 GB

Threat Protection = Firewall + IPS + Application Control + Malware Protection with logging. Actual results vary by policy and traffic mix.

Overview

Quick Answer: Both families are ASIC-accelerated 1RU appliances that combine firewalling, SD-WAN and FortiSwitch control over a dedicated FortiLink port. The 100F holds about 1.5 million concurrent sessions and 11.5 Gbps of IPsec; the 200F doubles sessions to roughly 3 million and lifts SSL inspection to about 4 Gbps.

Interfaces

Quick Answer: Both chassis reserve two 10 GE SFP+ ports for FortiLink switch management. Beyond that, the 100F offers twelve copper switch ports plus four gigabit SFP cages, while the 200F grows to sixteen copper ports, eight SFP cages and two additional 10 GE uplinks. Redundant power supplies ship on both.

I/O100F series200F series
GE RJ4512 switch + 2 WAN + MGMT/DMZ/HA16 switch + MGMT/HA
GE SFP4 (+ shared media pairs)8
10 GE SFP+2× FortiLink2× FortiLink + 2× SFP+
Redundant PSUYes (dual)Yes (default 1+1 AC)

Sizing tip: If Threat Protection headroom or SSL inspection is tight on 100F, step to 200F before stacking more UTMs on the same box. Hyperscale campus/DC edges belong on higher FortiGate platforms.

Use Cases

Quick Answer: A 100F pairing with FortiSwitch access floors gives branches one Security Fabric policy across firewall and LAN. Regional headquarters that inspect more traffic step up to the 200F for its extra headroom and port density. Sites that log locally or run disk-backed features should order the SSD-equipped 101F or 201F.

Branch + FortiSwitch floor

FG-100F with FS-124F/148F over FortiLink for unified Security Fabric policy.

Midsize HQ / regional hub

FG-200F when you need ~3 Gbps TP, denser SFP, and stronger SSL inspection.

Local logging / disk features

Choose 101F or 201F for the 480 GB SSD variant.

Buying Checklist

Quick Answer: TP target → 100F vs 200F → SSD need → HA pair → FortiGuard bundle → FortiSwitch count → FortiCare. Threat Protection and SSL inspection targets UTP / ATP / SD-WAN / FortiSASE subscriptions Search Fortinet parts on SKU Lookup.

  1. Threat Protection and SSL inspection targets
  2. 100F/101F vs 200F/201F
  3. Active/passive HA and dual PSU
  4. FortiLink optics and FortiSwitch BOM
  5. UTP / ATP / SD-WAN / FortiSASE subscriptions
  6. FortiManager / FortiAnalyzer if centralized
  7. FortiCare RMA term

Search Fortinet parts on SKU Lookup.

Frequently Asked Questions

Quick Answer: Threat Protection throughput is the honest yardstick against PA-400 and PA-1400 class boxes: roughly 1 Gbps on FG-100F and 3 Gbps on FG-200F. SD-WAN ships in the hardware, yet its feature tier tracks FortiOS and the subscription bundle. Exceeding 200F headroom means moving up the chassis ladder.

Fortinet pulled the old 100F/200F data-sheet PDFs. The live vendor pages are the 100F product brochure and the 100F/101F hardware-acceleration note on docs.fortinet.com. This page is the RFQ table — threat protection and FortiLink — for remaining F-series stock. New branches usually size on 90G, 120G, or 200G.

All are midsize NGFWs. Choose by existing vendor standard, SD-WAN/FortiLink need, and measured TP. See PA-400 and PA-1400.

Hardware is SD-WAN capable; enablement and feature tier depend on FortiOS and subscription bundle — put SD-WAN requirements on the RFQ.

When Threat Protection, SSL inspection, or port density exceeds 200F headroom — evaluate higher FortiGate chassis or 6000F for large edges.

Contact info@benquan.hk or request a quote.

Key Takeaway

Key Takeaway: Pick the 100F only when measured Threat Protection stays under 1 Gbps and SSL inspection is light; anything heavier belongs on the 200F, while local logging pushes you to the 101F or 201F. Confirm PSU and fan SKUs match the chosen chassis.

Not sure your BOM is optimal?

If you are unsure whether your BOM is optimal, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents