Quick Take
Quick Take: Current FortiAP K-Series covers FAP-441K and FAP-241K — quad-radio Wi-Fi 7 with 6 GHz, dedicated scanning, and 10GbE uplinks for FortiGate or FortiLAN Cloud managed campuses. Migrating from the Wi-Fi 6E 431G? Size switch uplinks and PoE++ budgets upward Reference official datasheets for detailed specifications.
FAP-431G / G-Series Status
Quick Answer: FAP-431G reached end of sale on April 9, 2026, so refreshes and new campuses should specify K-Series Wi-Fi 7 instead. The natural step from that 4x4 Wi-Fi 6E unit is FAP-441K, which swaps a single 5GbE port for dual 10GbE and therefore raises closet uplink and PoE++ requirements.
Radio rates follow Fortinet FortiAP Series datasheets (PHY maxima; real client throughput is lower). Confirm regional 6 GHz approval, FortiOS version, and PoE class on the quote. BENQUAN GLOBAL LIMITED supplies Fortinet WLAN and FortiCare. Related: Aruba CX 6300, SKU Lookup. Request a quote.
Model Comparison (current K-Series)
Quick Answer: Pick 4x4 (441K/443K) for dense enterprise floors; 2x2 (241K/243K) for standard rooms and cost-optimized coverage. 4x4 · 2.4 + 5 + 6 + scan ~1.148 / 8.648 / 11.53 Gbps 2x2 · 2.4 + 5 + 6 + scan ~688 Mbps / 4.324 / 5.765 Gbps *Per-band PHY maxima from vendor datasheet.
| Model | MIMO / radios | PHY rates (up to)* | Uplink |
|---|---|---|---|
| FAP-441K (internal) | 4x4 · 2.4 + 5 + 6 + scan | ~1.148 / 8.648 / 11.53 Gbps | 2× 10GbE |
| FAP-443K (external) | 4x4 · same radio layout | Same class | 2× 10GbE |
| FAP-241K (internal) | 2x2 · 2.4 + 5 + 6 + scan | ~688 Mbps / 4.324 / 5.765 Gbps | 10GbE + 1GbE |
| FAP-243K (external) | 2x2 · same radio layout | Same class | 10GbE + 1GbE |
*Per-band PHY maxima from vendor datasheet. 5 GHz supports wide channels (incl. 240 MHz class); 6 GHz up to 320 MHz on K-Series. 6 GHz use is region-dependent.
- Wi-Fi 7 AP & PoE Switch BOM RFQ Guide — B2B procurement & BOM risk guide
- Wi-Fi 7 (802.11be) with 4096-QAM on high bands
- Dedicated scanning radio for 24/7 WIDS-style visibility
- Integrated BLE / ZigBee
- Typically 802.3bt PoE++ for full feature operation
- Managed by FortiGate (Tunneled/Local) or FortiLAN Cloud
Overview
Quick Answer: FortiAP K-Series access points carry four radios: 2.4, 5 and 6 GHz for clients plus a dedicated scanning radio for rogue detection. A FortiGate or FortiLAN Cloud applies Security Fabric policy to them directly, and built-in BLE and ZigBee radios support IoT locationing alongside normal client traffic.
Use Cases
Quick Answer: Fortinet-standard campuses refreshing from Wi-Fi 6/6E, high-density offices needing 6 GHz + 10GbE backhaul. FAP-441K on FortiSwitch FPOE / mGig with FortiGate WLAN controller features. FAP-241K where 2x2 coverage density is enough and budget matters. Need multi-gig + PoE++ — FortiSwitch or Aruba CX 6300 / Catalyst 9300.
Enterprise floor refresh
FAP-441K on FortiSwitch FPOE / mGig with FortiGate WLAN controller features.
Standard classroom / office
FAP-241K where 2x2 coverage density is enough and budget matters.
Switch side
Need multi-gig + PoE++ — FortiSwitch or Aruba CX 6300 / Catalyst 9300.
Buying Checklist
Quick Answer: Avoid EoS G SKUs → pick 441K vs 241K → antennas → PoE++ → 10G switch ports → FortiOS → FortiCare. Confirm K-Series (not FAP-431G) for new orders 802.3bt PoE budget and injector fallback FortiGate model / FortiLAN Cloud license Regional SKU and 6 GHz regulatory notes Search Fortinet parts on SKU Lookup.
- Confirm K-Series (not FAP-431G) for new orders
- 4x4 vs 2x2 density target
- Internal vs external antenna SKU
- 802.3bt PoE budget and injector fallback
- 10GbE access-switch / DAC plan
- FortiGate model / FortiLAN Cloud license
- Regional SKU and 6 GHz regulatory notes
Search Fortinet parts on SKU Lookup.
Which Part Numbers Should You Freeze on the RFQ (2 SKUs)?
Quick Answer: When quoting FAP-831F-E and sibling configurations across these 2 part numbers, lock the exact base MPN, redundant power supplies, optics, and matching 1-year or 3-year support tier on separate lines before comparing vendor discounts. Channel net pricing remains industry estimate / pending confirmation.
| Ordering SKU | Key Configuration & Boundary | Adjacent BOM Lines to Freeze |
|---|---|---|
FAP-831F-E | Wi-Fi 6 8x8 indoor AP, region E, 2.5GbE + 1GbE, dual 802.3at for full radios. FortiCare FC-10-P831F as a separate line. | FC-10-P831F-247-02-xx, Dual 802.3at or 802.3bt, 2.5GbE capable port, Ceiling / T-rail kit if not included |
FAP-23JF-E | Wi-Fi 6 wall-plate, region E, 2x2+2x2, 802.3at PD + 802.3af PSE. GPI-130 and FortiCare as separate lines. | FC-10-P23JF-247-02-xx, GPI-130, SP-FAP23J-PA-10, FAP-MNT-WJ-20 |
Frequently Asked Questions
Quick Answer: K-Series radios still serve Wi-Fi 5, 6, and 6E clients, but headline rates near 11.53 Gbps need Wi-Fi 7 devices and clean 6 GHz channels. A FortiGate can manage FAP-441K and FAP-241K once its FortiOS build supports them, so verify the minimum release and per-model access point ceiling.
The official FortiAP series PDF is on Fortinet: fortiap-series.pdf. This page is the RFQ table — FAP-441K / FAP-241K radios versus retired G-Series — so you pick a current K-Series SKU before opening that PDF. Confirm FortiOS AP support on the quote.
K-Series is backward compatible with Wi-Fi 6/6E/5 clients. Wi-Fi 7 PHY rates require Wi-Fi 7 clients and clean 6 GHz spectrum.
Yes when FortiOS supports the AP platform — confirm minimum FortiOS for FAP-441K/241K and AP count limits on your FortiGate model.
BENQUAN GLOBAL LIMITED supplies FortiAP K-Series and FortiCare. Contact info@benquan.hk or request a quote.
Key Takeaway
Key Takeaway: Specify 441K where floors are dense and closets already have 10G, 241K where 2x2 coverage is enough. The uplink change is the real budget item: a 431G refresh needs multi-gig switch ports and an 802.3bt power budget, so price the FortiSwitch side into the same order.