Application Delivery / Load Balancing / SSL Offload

FortiADC: does hardware SSL start at the 400F, so a smaller box is doing TLS in software?

Application delivery controllers from mid-range FAD-400F to hyperscale FAD-5000F — L4/L7 throughput, ASIC SSL, WAF/GSLB, and Security Fabric integration.

Quick Take

Quick Take: L4 throughput is the wrong sizing input for an ADC, because TLS handshakes exhaust the box first. Hardware SSL starts at FAD-400F, roughly 12 Gbps of L7 and 14,000 connections per second, and the ladder runs to FAD-5000F with 100GE. Below 400F, SSL is handled in software.

Performance Comparison

Quick Answer: Hardware SSL acceleration starts at the 400F, which moves 15 Gbps at L4 and roughly 14,000 SSL connections per second; the ladder then climbs through 1200F, 2200F and 4200F to the 5000F's 250 Gbps and about 90,000 CPS. Below the 400F, the small boxes decrypt in software only.

Figures follow Fortinet FortiADC datasheet “up to” values and vary with configuration. Pair ADCs with FortiGate edges and FortiAnalyzer logging. BENQUAN GLOBAL LIMITED supplies FortiADC hardware and support. Related: F5 BIG-IP rSeries, FortiGate 6000F, FortiAnalyzer, SKU Lookup. Request a quote.

Model L4 / L7 SSL CPS (2K keys) SSL bulk L4 concurrent SSL accel
FAD-400F15 / 12 Gbps~14,0006 Gbps12MASIC
FAD-420F20 Gbps class~20,00010 Gbps25MASIC
FAD-1200F40 / 30 Gbps~35,00019 Gbps36MASIC
FAD-2200F60 / 35 Gbps~40,00022 Gbps72MASIC
FAD-4200F100 / 80 Gbps~60,00037 Gbps144MASIC
FAD-5000F250 / 220 Gbps~90,000100 Gbps216MASIC

Lower F-Series (220F/300F/320F) use software SSL — fine for lighter apps; move to 400F+ when TLS1.3 offload volume grows.

Overview

Quick Answer: FortiADC is an application delivery controller: it load-balances L4 to L7 traffic, terminates TLS, and adds WAF, bot protection, GSLB and caching in front of web and API farms. Fabric connectors tie it to FortiGate, FortiAnalyzer, Kubernetes and public cloud, so policy follows the application.

Hardware & I/O

Quick Answer: The 1U appliances (400F through 2200F) top out at 10GE SFP+ density, stepping from two such ports on the 400F to twelve on the 2200F. Moving to 2U buys 40GE QSFP+ on the 4200F and 100GE QSFP28 on the 5000F, whose memory grows to 384 GB. Dual power comes standard only from the 1200F upward.

ModelFormKey interfacesMemory / SSD
FAD-400F1U4× GE RJ45, 4× GE SFP, 2× 10GE SFP+32 GB / 120 GB
FAD-420F1U4× GE RJ45, 4× GE SFP, 4× 10GE SFP+32 GB / 120 GB
FAD-1200F1U8× GE RJ45, 8× GE SFP, 8× 10GE SFP+32 GB / 240 GB
FAD-2200F1U8× GE SFP, 12× 10GE SFP+64 GB / 240 GB
FAD-4200F2U4× 40GE QSFP+, 8× 10GE SFP+128 GB / 480 GB
FAD-5000F2U4× 100GE QSFP28, 8× 40GE QSFP384 GB / ~3.74 TB

Design tip: Quote optics and dual PSU kits (optional on 400F/420F; dual standard on 1200F+) with the chassis. HA is VRRP A/A or A/P — buy pairs for production apps.

Key Capabilities

Quick Answer: FortiADC bundles four capability groups into one box: traffic management from L4 through L7 with rewrite scripting, TLS 1.3 decryption in offload or forward-proxy mode, licensed security add-ons covering WAF, API and bot defense, and global server load balancing. Multi-tenancy and Security Fabric hooks come standard.

  • L4–L7 LB with scripting / content rewrite
  • SSL offload, inspection, forward proxy (TLS1.3)
  • WAF / API security / Advanced Bot Protection options
  • GSLB on-box or FortiGSLB Cloud
  • VDOM/ADOM multi-tenancy; Fabric connectors to FortiGate / FortiAnalyzer

Use Cases

Quick Answer: Most deployments fall into three patterns: a VIP tier in front of web and API farms, dedicated TLS termination that spares application servers from decryption load, and geographically steered failover across data centers. Fortinet-standardized shops get the extra payoff of Fabric integration beside their FortiGate estate.

Enterprise app VIP tier

FAD-400F/1200F for HTTP(S) farms needing health checks, persistence, and WAF without a separate ADC brand.

High-CPS TLS offload

ASIC models (400F+) when backend servers choke on TLS; size on SSL CPS and bulk Gbps from the table above.

Multi-site / hybrid

GSLB + cloud FortiADC / FortiFlex for DR and latency-based steering; keep on-prem pairs for critical apps.

Buying Checklist

Quick Answer: Size the box on measured peak L7 throughput and SSL connections per second at your certificate key length, then walk the ladder from 400F to 5000F. Add optics or DAC for every populated port, a second appliance for VRRP HA, only the FortiGuard bundles you will enable, and FortiFlex when burst capacity matters.

  1. Peak L7 Gbps and SSL CPS (2K / 4K keys as applicable)
  2. Model: 400F → 5000F ladder
  3. Optics / DAC and dual PSU
  4. HA topology (A/A vs A/P)
  5. WAF / Bot / AI Security / Network Security bundles
  6. VM vs hardware vs FortiFlex for burst capacity

Search Fortinet parts on SKU Lookup.

Frequently Asked Questions

Quick Answer: FortiADC complements a FortiGate rather than replacing it, fronting applications with load balancing, SSL offload, and application security while the firewall guards the edge. Most mid-size estates land between FAD-400F and FAD-2200F; 40GE or 100GE uplinks push you to FAD-4200F or FAD-5000F. FAD-VM licenses cover lab and burst work.

The official FortiADC PDF is on Fortinet: FortiADC.pdf. This page is the RFQ ladder — L4/L7 throughput from FAD-400F through FAD-5000F — so you size SSL offload before opening that PDF. Confirm FortiCare years on the quote.

No. FortiGate is the NGFW/edge. FortiADC sits in front of applications for LB, SSL, and app security — often together in the Security Fabric.

When you need 40/100GE uplinks and 80–220 Gbps class L7 with very high SSL CPS. Most mid enterprises land on 400F–2200F.

Yes — FAD-VM01 through VM32 by vCPU count, plus cloud PAYG/BYOL and FortiFlex. Use VMs for lab/burst; hardware for sustained ASIC SSL.

BENQUAN GLOBAL LIMITED supplies FortiADC F-Series and support. Contact info@benquan.hk or request a quote.

Key Takeaway

Key Takeaway: Quote the pair, not the box: two appliances for HA, optics or DAC for every port in use, dual power supplies, and only the FortiGuard bundles matching features you will switch on. Confirm peak SSL CPS at your key size first. BENQUAN GLOBAL LIMITED supplies the Fortinet FortiADC F-Series with competitive pricing.

Not sure your BOM is optimal?

If you are unsure whether your BOM is optimal, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents