Networking / Application Delivery / Modular ADC

VELOS CX410 1.6T or CX1610 6.4T?

Modular chassis ADC (VIPRION successor) — CX410 (4U, 1.6 Tbps backplane) and CX1610 (16-RU, 6.4 Tbps) with BX520 400G blades, scaling to 6 Tbps and 6.4 billion connections on F5OS-C for 5G FWA and AI data delivery.

Quick Take

Quick Take: F5 VELOS is F5's modular chassis ADC, the VIPRION successor. The 4U CX410 (1.6 Tbps backplane) and 16-RU CX1610 (6.4 Tbps) take BX520 400G blades — about 375/300 Gbps L4/L7 each — scaling to 6 Tbps and 6.4 billion connections on F5OS-C..

Performance

Quick Answer: A fully populated CX1610 scales to about 6 Tbps of throughput, 6.4 billion concurrent connections (400 million per blade), and 80 million L4 connections per second. The CX410 provides a non-blocking 1.6 Tbps backplane and the CX1610 a 6.4 Tbps backplane, both fully non-blocking across their slots.

Figures follow the official F5 VELOS platform guide and datasheet. Confirm the F5OS-C version, blade type, optics, and tenant licensing on the quote. BENQUAN GLOBAL LIMITED supplies F5 hardware and subscriptions. Related: F5 BIG-IP rSeries, F5 BIG-IP iSeries, SKU Lookup. Request a quote.

Metric* VELOS CX410 VELOS CX1610
Form factor4U16-RU
Blade slots8 (4x BX520 half-width)32 (16x BX520 half-width)
Backplane (non-blocking)1.6 Tbps6.4 Tbps
Max throughputmulti-Tbpsup to 6 Tbps
Max concurrent connections6.4 billion (400M per blade)
L4 connections/sec80 million
Platform softwareF5OS-CF5OS-C

*F5 VELOS datasheet and platform guide. CX1610 and BX520 require F5OS-C 1.8.1 or later. Confirm against your release.

6T
Throughput (CX1610)
400G
BX520 blade
6.4B
Connections
F5OS-C
Platform

Overview

Quick Answer: VELOS is F5's next-generation modular chassis ADC, replacing VIPRION. It separates control and data planes with redundant system controllers running the F5OS-C platform, and scales by adding blades. Two chassis — the 4U CX410 and 16-RU CX1610 — share BX520 and BX110 blades for high-end load balancing, 5G FWA, and AI data delivery.

VELOS continues F5's chassis lineage from VIPRION with a fully non-blocking, multi-terabit backplane and a modern platform OS. Redundant system controllers provide Layer 2 switching and control-plane separation, and tenants are provisioned on blades with dedicated resources. This lets a single chassis host multiple isolated BIG-IP tenants or one ultra-performant SuperVIP tenant, so you consolidate application delivery, SSL offload, and security without assembling separate server, hypervisor, and ADC stacks.

Sizing rule: Size on blade count and tenant density — each BX520 adds about 375/300 Gbps L4/L7 and 400 million connections — then pick the chassis (CX410 for up to four blades, CX1610 for up to sixteen) for growth headroom.

Hardware & Blades

Quick Answer: The BX520 is a half-width 400G blade with about 375 Gbps L4 and 300 Gbps L7 throughput, two 28-core Xeon CPUs (96 usable vCPUs), 512 GB RAM, and a 4 TB SSD. It adds hardware acceleration for SSL/TLS, IPsec, DDoS, and CGNAT. The CX410 holds four BX520 blades; the CX1610 holds sixteen.

Attribute BX520 blade
TypeHalf-width 400G blade
L4 / L7 throughput~375 / 300 Gbps
CPU2x 28-core Xeon (96 usable vCPU)
Memory512 GB
SSD4 TB
Data ports1x 400GbE QSFP-DD + 1x 100GbE QSFP28
Hardware accelerationSSL/TLS, IPsec, DDoS, CGNAT
Concurrent connections400M per blade
Blades per chassisCX410: 4 · CX1610: 16
  • An earlier BX110 blade (about 95 Gbps L4/L7) is also supported for lower-throughput slots.
  • Redundant system controllers run F5OS-C and provide non-blocking Layer 2 switching between slots.
  • Tenants get dedicated resources; a chassis can host many tenants or one SuperVIP tenant.

Use Cases

Quick Answer: VELOS targets high-end application delivery — load balancing, SSL offload, and security — for large enterprises and service providers, including 5G Fixed Wireless Access and AI data-delivery pipelines. Tenant-based resource allocation isolates workloads, and NEBS compliance suits carrier deployments. It is the chassis step-up from fixed rSeries appliances.

High-end application delivery

Consolidate load balancing, SSL offload, and WAF across many isolated BIG-IP tenants on one chassis.

Service provider 5G FWA

6 Tbps throughput, 6.4 billion connections, and 80M L4 cps with NEBS compliance suit carrier FWA security.

AI data-delivery pipelines

Low-latency, high-throughput traffic management feeds AI ingest and real-time data processing.

Vs rSeries and iSeries

Step up from fixed BIG-IP rSeries or legacy iSeries when you need chassis scale.

Buying Checklist

Quick Answer: Choose the chassis by scale — CX410 (4U) for up to four BX520 blades, CX1610 (16-RU) for up to sixteen — then size blade count to throughput and tenant density. Confirm the F5OS-C version (1.8.1 or later for CX1610 and BX520), optics, power, and BIG-IP tenant licensing before freezing the BOM.

  1. Chassis: CX410 (4U) vs CX1610 (16-RU) for blade capacity and growth
  2. BX520 blade count for throughput and tenant density
  3. BX520 vs BX110 blade mix
  4. F5OS-C version (1.8.1+ for CX1610 / BX520)
  5. Optics: 400GbE QSFP-DD / 100GbE QSFP28
  6. Power supplies and redundancy sized to blade draw
  7. BIG-IP tenant and module licensing (LTM, ASM/WAF, AFM)
  8. NEBS / environmental requirements for carrier sites

Search F5 SKUs on SKU Lookup. For fixed appliances, see F5 BIG-IP rSeries.

Frequently Asked Questions

Quick Answer: Common questions cover the difference between CX410 and CX1610, BX520 blade specs, whether VELOS replaces VIPRION, and where to source it. Choose the chassis and blade count by throughput and tenant density; confirm F5OS-C and licensing on the quote. BENQUAN supplies VELOS.

F5 publishes VELOS CX-series specs on techdocs.f5.com. This page is the RFQ ladder — CX410 versus CX1610 throughput — so you size a chassis ADC before opening that guide. Confirm F5OS-C tenants and blades on the quote.

The CX410 is a 4U chassis with 8 slots (four half-width BX520 blades) and a non-blocking 1.6 Tbps backplane; the CX1610 is a 16-RU chassis with 32 slots (sixteen BX520 blades) and a non-blocking 6.4 Tbps backplane. Both run F5OS-C and share the BX520 and BX110 blades.

The BX520 is a half-width 400G blade delivering about 375 Gbps L4 and 300 Gbps L7 throughput, with two 28-core Xeon CPUs (96 usable vCPUs), 512 GB RAM, and a 4 TB SSD. It provides hardware acceleration for SSL/TLS, IPsec, DDoS, and CGNAT, and up to 400 million concurrent connections per blade.

Yes. VELOS is F5's next-generation chassis ADC, succeeding the VIPRION platform. It runs the F5OS-C platform with separated control and data planes, redundant system controllers, and tenant-based resource allocation, scaling to about 6 Tbps and 6.4 billion concurrent connections in a fully populated CX1610.

Contact info@benquan.hk or request a quote for a free BOM compatibility and delivery-risk review.

Key Takeaway

Key Takeaway: F5 VELOS is the modular chassis ADC that succeeds VIPRION — the 4U CX410 (1.6 Tbps) and 16-RU CX1610 (6.4 Tbps) run BX520 400G blades on F5OS-C, scaling to 6 Tbps and 6.4 billion connections. Size chassis and blade count to throughput and tenant density. BENQUAN supplies VELOS with competitive pricing.

Not sure your BOM is optimal?

If you are unsure whether your VELOS chassis and blade BOM are optimal, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents