Quick Take
Quick Take: If your F5 refresh was budgeted before June 2026, the hardware line is now wrong and the consumption model you chose decides by how much. Flex Consumption and Strongbox absorbed roughly twice the uplift of perpetual platforms, and support renewals inherit the higher list without any product change.
Price Adjustment Matrix
Quick Answer: F5 hardware list prices rose effective June 1, 2026. Perpetual: r2000/r4000 +14%, r5000 +20%, r10000/r12000 and i15000 +22%, VELOS +22%, non-platform add-ons +19%. FCP/Strongbox: +30% / +36% / +46% / +24% respectively by the same product tiers. F5 cited rising costs of key components, including memory, used in Hardware Systems.
F5 cited rising costs of key components, including memory, used in Hardware Systems. Platform-specific add-ons increase by the same percentage as the platform; non-platform-specific add-on hardware increases by 19%.
Perpetual Licensing
| Product Type | Consumption Model | Price Adjustment |
|---|---|---|
| r2000 series, r4000 series | Perpetual | +14% |
| r5000 series (incl. r5920-DF) | Perpetual | +20% |
| r10000 / r12000 series (incl. r10920-DF), BIG-IP i15000 | Perpetual | +22% |
| VELOS chassis (CX410, CX1610) and blades (BX520, BX110) | Perpetual | +22% |
| Non-platform-specific add-on hardware | Perpetual | +19% |
Flex Consumption Program (FCP) / Strongbox
| Product Type | Consumption Model | Price Adjustment |
|---|---|---|
| r2000 series, r4000 series | FCP / Strongbox | +30% |
| r5000 series (incl. r5920-DF) | FCP / Strongbox | +36% |
| r10000 / r12000 series (incl. r10920-DF), BIG-IP i15000 | FCP / Strongbox | +46% |
| VELOS chassis and blades | FCP / Strongbox | +24% |
Perpetual 14–22%FCP 24–46%Add-ons track platformNon-platform add-ons +19%
Why FCP % Looks Higher
F5 notes the percentage uplift is higher for FCP units because FCP preexisting list prices were much lower than Perpetual. Compare absolute quote deltas by SKU and term length — do not assume FCP remains cheaper after the adjustment without a fresh BOM quote.
What Did Not Change
Quick Answer: Subscription Software, Virtual Edition (VE), NGINX, and F5 Distributed Cloud list pricing remained unchanged in this Q3 FY26 action. Only Hardware Systems and related add-ons moved, with Global Support moving proportionately on new contracts and renewals. Changes apply globally — no country- or region-specific price deltas in this announcement.
- Subscription Software — unchanged
- Virtual Edition (VE) — unchanged
- NGINX — unchanged
- F5 Distributed Cloud — unchanged
Changes apply globally — no country- or region-specific price deltas in this announcement.
Global Support Impact
Quick Answer: F5 Global Support is priced as a percentage of current product list price. That percentage structure did not change, so support dollars rise with the new hardware list. Existing support contracts stay as-is until renewal; new contracts and renewals use updated pricing.
Renewals vs In-Flight Contracts
If your support contract is mid-term, list-price increases do not rewrite the active contract. At renewal, expect support quotes to reflect the higher hardware list baseline. Align hardware refresh and multi-year support renewals in one RFQ to control total cost.
Quote Protection Rules
Quick Answer: F5 honored approved quotes issued on or before May 31, 2026 when the matching order was booked by the cutoff stated in the customer letter. Any quote not converted to a purchase order and booked by that date became subject to June 1, 2026 list pricing instead.
Already-Approved Quotes
Confirm issue date, approval status, and booking date with your F5 account team or distributor. Post–June 1 bookings without protected quotes use the new matrix above.
Planned Orders Without Booking
Any quote not converted to a purchase order and booked by May 31, 2026 is subject to updated pricing effective June 1, 2026. Re-request current list if your quote aged past the protection window.
What Buyers Should Do Now
Quick Answer: Treat June 1, 2026 as the new hardware list baseline. Requote open rSeries, VELOS, and i15000 BOMs; separate Perpetual vs FCP/Strongbox paths; model Global Support renewal impact; keep Software/VE/NGINX/Distributed Cloud lines on prior assumptions unless a later notice changes them.
1. Rebaseline Hardware BOMs
Rebuild quotes for r2000–r12000, i15000, and VELOS with the correct consumption model. Platform add-ons follow the platform %; non-platform add-ons use +19%.
2. Compare Perpetual vs FCP After Uplift
FCP percentage increases are larger (up to +46%). Run both models for multi-year deployments before locking a consumption path.
3. Align Support Renewals
Support tracks list. Bundle renewal timing with hardware buys so you are not surprised by a support-only renewal priced off the new list.
4. Keep Software / Cloud Lines Separate
Do not apply hardware uplifts to VE, NGINX, or Distributed Cloud line items unless a subsequent F5 notice says otherwise.
Request the official F5 Q3 FY26 Price Action Announcement (PDF)
Frequently Asked Questions
Quick Answer: Hardware list prices moved on June 1, 2026: Perpetual platforms rose between 14% and 22%, while FCP and Strongbox consumption rose 24% to 46% depending on family. Quotes already approved that May stayed valid. Virtual Edition, NGINX, and Distributed Cloud held flat, and support renewals reprice against the higher list.
June 1, 2026. Announced April 27, 2026. Approved quotes issued on or before May 31, 2026 were protected if booked per the official letter.
Perpetual: 14% (r2000/r4000), 20% (r5000), 22% (r10000/r12000, i15000, VELOS), 19% (non-platform add-ons). FCP/Strongbox: 30%, 36%, 46%, and 24% respectively by the same product tiers.
No. Those product lines remained unchanged in this announcement.
Support is a percentage of product list price. Existing contracts stay until renewal; new contracts and renewals use updated (higher) list-based support pricing.
BENQUAN GLOBAL LIMITED supplies F5 rSeries, VELOS, i15000, add-ons, and support renewals. Contact info@benquan.hk for current post-increase quotes.
Key Takeaway
Key Takeaway: F5’s Q3 FY26 action raised hardware list prices on June 1, 2026 — Perpetual +14–22% and FCP/Strongbox +24–46% across rSeries, VELOS, and BIG-IP i15000, with add-ons tracking platform or +19% for non-platform hardware. Software/VE/NGINX/Distributed Cloud stayed flat; support rises on renewals. BENQUAN GLOBAL LIMITED supplies F5 with competitive pricing — contact us for current quotes.