Quick Take
Quick Take: Which F5 GPL / Global Price List lines moved in the 2026 price list? SKU Lookup moved from catalog date 2026-06-05 (5,371 SKUs) to 2026-10-17 (5,553 SKUs). Net change is about +297 / −102. MoM is not one percentage: +22%, +20%, +14% on appliances and licenses, software maintenance near +33%, and about 3,009 retained lines still at 0%. Channel net stays pending confirmation.
Paste the open F5 BOM into F5 SKU Lookup and read MoM per line versus 5 June 2026. Then send a dated brief via rfq.html?intent=bom-risk.
What is the 17 Oct 2026 F5 GPL change?
Quick Answer: An F5 GPL (Global Price List) delta is the SKU-set change plus MoM movement between two dated commercial LIST indexes. This price list 2026 page compares 5 June 2026 with 17 October 2026. It is not a license-model how-to and not a substitute for the June 1 hardware letter.
Typical scene: an rSeries plus support pack was approved on the June 5 printout. Someone still says “hardware plus twenty-two percent, software unchanged.” That sentence is how you overpay an R2600 and miss the maintenance column.
Definition: On this site, F5 GPL means the dated Global Price List index on SKU Lookup — commercial LIST, not channel net. Lookup does not show LIST dollars. It shows the catalog date, the description, and MoM percent versus the prior priced set. Cite 2026-10-17 on the RFQ. The 17 October 2026 refresh is a mixed MoM revision plus finer billing SKUs. Most retained lines are still flat. Hardware sits in three corridors. Software licenses and software maintenance moved — the June “software unchanged” line does not describe this index.
- Fit this page: Open F5 BOMs still dated 2026-06-05; rSeries / iSeries / VELOS plus licenses; anyone applying one percentage to the whole PO; ELA billing or Schedule A line checks.
- Unfit: Readers who want one surcharge for every BIG-IP chassis. Use the June 1 hardware notice for that letter, and the ELA vs perpetual vs subscription guide for license-model choice — not this index.
Start on F5 SKU Lookup, the F5 Price List 2026 hub, and the F5 vendor hub.
F5 price list 2026 counts: 5,371 to 5,553
Quick Answer: Previous F5 Global Price List index: 2026-06-05, 5,371 SKUs. Current GPL: 2026-10-17, 5,553 SKUs. Added about 297. Removed about 102. Net +182. Public Lookup still hides LIST dollars. Channel net is not on that page.
| Metric | 5 Jun 2026 | 17 Oct 2026 |
|---|---|---|
| GPL / Global Price List catalog date | 2026-06-05 | 2026-10-17 |
| Public F5 price list SKUs | 5,371 | 5,553 |
| Part numbers added | — | 297 |
| Part numbers removed | — | 102 |
| Net SKU change | — | +182 |
| Public LIST dollars | No | No |
| MoM baseline | — | vs 2026-06-05 |
Checked 17 October 2026 against the public index. A seller who only quotes “the catalog got more detailed” is half right: the extra 182 net lines are mostly finer ELA, Schedule A, and service splits. What also moved is MoM on retained hardware, licenses, and maintenance.
Limitation: Lookup MoM is not the PO. Worldwide shipping and free-port stock stay pending confirmation until the dated RFQ names quantity, license model, support years and site.
Which F5 GPL LIST bands moved — +22%, +20%, +14%, or +33%?
Quick Answer: The four loudest up-bands are +22%, +20%, +14% and about +33% on software maintenance. About 3,009 retained lines still show 0%. Entry rSeries is not the same corridor as R10600.
Think of it like airfare classes on one airline. Economy, business and long-haul do not share one percentage. If you apply the long-haul ticket to the regional hop, the CapEx pack is fiction.
| MoM band vs 5 Jun | Approx. lines | What sits in the band |
|---|---|---|
| 0% | about 3,009 | majority of priced retained SKUs — still flat |
| +22% | about 788 | software licenses + high-end appliances (R10k / R12k / i15k / licensed VELOS) |
| +20% | about 241 | mid rSeries such as R5600 / R5800 / R5900 class |
| +14% | about 136 | entry rSeries: R2600 / R2800 / R4600 / R4800 class |
| ~+33% to +36% | about 312 | software-maintenance corridor — not the appliance sticker |
Read the chassis you actually named. F5-BIG-LTM-R2600 and F5-BIG-LTM-R2800 sit near +14%. F5-BIG-LTM-R5600 and F5-BIG-LTM-R5900 sit near +20%. F5-BIG-LTM-R10600 and F5-BIG-LTM-I15800 sit near +22%. FCP basic-hardware SKUs can sit higher than those licensed bundles. Mixing them into one “F5 went up 22%” slide is the expensive mistake.
The June 1 hardware notice described software, VE, NGINX and Distributed Cloud as unchanged. Catalog date 2026-10-17 does not. Software-license rows populate the +22% band. Software-maintenance rows sit near +33%. If your approval pack still says “software flat,” it is citing last season’s weather.
What Was Added: Finer ELA, Schedule A, and a Few New Boxes
Quick Answer: Of 297 adds, about 118 are extra ELA billing levels, 66 are US National / Schedule A support, and 65 are F5-SVC* splits. Hardware adds include F5-BIG-R5600. API Security appears as F5-ADSP-APIS-L.
The list got “more detailed” the way a hotel adds floor numbers — more billing rows, not a new building. If your ELA quote still stops at an older level code, Lookup may now expect a higher F5-ELA-BILLING-BIGL* line.
| Bucket | Adds | What to do on an RFQ |
|---|---|---|
| ELA billing extra levels | 118 | Confirm F5-ELA-BILLING-BIGL16 and neighbours match the term-software level on the agreement. Do not reuse an older ceiling code. |
| US National / Schedule A support | 66 | Rows such as F5-BIG-SCH-A-SPT-US are support SKUs, not another appliance. Attach only if the contract names that program. |
F5-SVC* service lines | 65 | Per-call rates and Premium “17% of List” splits. Keep them off the hardware column. |
| Distributed Cloud / XC | 39 | SP DDoS bandwidth / port / transit rows. Not an rSeries substitute. |
| Hardware appliances | 5 | Includes F5-BIG-R5600, F5-BIG-BTA-i15800, F5-BIG-AFM-i11800-DS, plus QDD-SR8 field upgrades. |
| API Security | 2 | F5-ADSP-APIS-L (local edition, per million requests / month) and its premium support row. |
The 102 removals versus the June snapshot include about 25 legacy BIG-IP ADC/ADF 2000/2200/4000 fragments, plus shipping-offer and some VIPRION guest codes. This index does not prove those codes are end-of-sale. If a line misses Lookup, check spelling before you write EOS into the bid.
Representative new codes (not a shopping list):
| SKU | Read |
|---|---|
F5-BIG-R5600 | FCP basic hardware R5600 — new chassis code on this index |
F5-ELA-BILLING-BIGL16 | ELA annual billing fee, BIG-IP Level 16 term software — extra level, not a new platform |
F5-ADSP-APIS-L | F5 API Security local edition (per million requests / month) |
F5-BIG-SCH-A-SPT-US | BIG-IP US National Support (Schedule A) |
F5-BIG-BTA-i15800 | Best bundle i15800 appliance row added on this index |
How to re-validate an F5 Global Price List BOM on 2026-10-17
Quick Answer: Confirm the date, paste every line, split hardware from licenses and maintenance, check new codes if the design moved, then lock net on a dated RFQ. Lookup MoM is not the PO.
- Confirm the catalog date. Open F5 SKU Lookup. You want 2026-10-17 and 5,553 SKUs. If the page still shows 5 June, hard-refresh. Do not argue from a screenshot taken in September.
- Paste every line. Appliances, modules, VE, ELA billing,
F5-SVC*, software maintenance. Note MoM versus 5 June 2026 on retained SKUs. A blank MoM often means the code is new. - Split the pack. One column for hardware. One for software licenses. One for software maintenance. One for ELA billing / Schedule A / SVC. Copying +22% from the license column into
F5-BIG-LTM-R2600is the expensive mistake. - Check new codes. If the design now names an R5600-class box, API Security, or a higher ELA level, confirm
F5-BIG-R5600,F5-ADSP-APIS-L, orF5-ELA-BILLING-BIGL16. An old code that still “looks right” may be a different orderable. - Lock a dated RFQ. Send the mapped BOM via rfq.html?intent=bom-risk with quantities, license model (perpetual / subscription / ELA), support years, region and delivery window. Channel net remains an industry estimate until that quote comes back.
Self-check: if your approval slide still says “F5 +22%, software unchanged” with no SKU column, it is not ready to forward.
Typical Scenes
Quick Answer: Three typical scenes — not named customers. An rSeries refresh, a software-maintenance renewal, and an ELA true-up all read this catalog differently.
- rSeries refresh still on June paper. Entry boxes such as R2600 / R2800 are the +14% corridor. Mid R5600 / R5900 sit near +20%. R10k-class sits near +22%. Re-run the hardware column before the steering pack.
- Support renewal copied from last year’s SKUs. Software maintenance is the +33% neighbourhood.
F5-SVC*and Schedule A rows are extra lines, not a second appliance. Do not blend them into the chassis uplift. - ELA true-up. New billing levels such as
F5-ELA-BILLING-BIGL16are term-software fees. Matching the level on the agreement is the whole RFQ.
Common BOM Traps on This Revision
Quick Answer: The traps are one fake percentage, forwarding the June “software unchanged” sentence, treating ELA billing as hardware, and calling 102 drops an EOS event.
| Trap | Why it bites | Fix |
|---|---|---|
| Stamp +22% on every chassis | R2600 is near +14%; many lines are still 0% | Read MoM on the exact LTM / AFM / Best-bundle SKU |
| Quote “software still flat” | June notice is not this Lookup revision | Re-price license and software-maintenance columns |
| One multiplier for FCP basic hardware and licensed bundles | Basic-hardware SKUs can sit higher than +22% | Keep FCP basic rows in their own column |
| Reuse an old ELA level code | Adds include Level 16+ billing SKUs | The level number is the part number |
| Treat −102 as EOS | Drops include legacy ADC fragments and offer codes | Re-search the code; ask before writing end-of-sale |
| Use Lookup as PO net | F5 Lookup hides LIST dollars; MoM ≠ channel net | Cite 2026-10-17, then RFQ; net pending confirmation |
FAQ
On BENQUAN SKU Lookup. The live F5 GPL (Global Price List) index is catalog date 2026-10-17 with 5,553 SKUs. The prior public price list was 2026-06-05 with 5,371 SKUs. Cite 2026-10-17 on any RFQ you freeze this week. LIST dollars stay hidden; channel net pending confirmation.
No. About 3,009 retained lines still show MoM 0%. Entry rSeries such as F5-BIG-LTM-R2600 and F5-BIG-LTM-R2800 sit near +14%. Mid boxes such as F5-BIG-LTM-R5600 sit near +20%. The +22% band is software licenses plus high-end R10k / R12k / i15k / licensed VELOS rows. Stamp +22% on the whole pack and you invent CapEx.
Not on this Lookup revision. The June 1 hardware notice described software, VE, NGINX and Distributed Cloud as unchanged. Catalog date 2026-10-17 puts software-license rows in the +22% MoM band and software-maintenance rows near +33%. Re-read the license and maintenance columns; do not forward the June sentence as a 17 October fact.
About 297 adds versus the June snapshot. The bulk is finer billing and support: F5-ELA-BILLING-BIGL16 and higher ELA levels, Schedule A / US National support, and F5-SVC* splits. Hardware examples include F5-BIG-R5600. API Security appears as F5-ADSP-APIS-L. About 102 codes dropped, including legacy ADC 2000/4000 fragments — that is not proof of end-of-sale by itself.
No. The F5 GPL / Global Price List on Lookup does not show LIST dollars. It shows the catalog date, the SKU, and MoM percent versus the prior priced set. Channel net is an industry estimate until a dated quote confirms it. Use Lookup to prove the code and the MoM direction, then lock net on the RFQ.
References
Quick Answer: Confirm platform names on F5’s public product pages. Counts and MoM bands above come from the dated public catalog on SKU Lookup, checked 17 October 2026. Channel net stays pending confirmation.
- F5 — BIG-IP rSeries
- F5 — BIG-IP services
- F5 — BIG-IP Virtual Editions
- F5 — Distributed Cloud Services
Numeric basis: public F5 GPL / Global Price List index dated 2026-10-17 (5,553 SKUs) versus 2026-06-05 (5,371 SKUs). Direction uses Lookup MoM on the 2026 price list. Net and lead time remain industry estimate / pending confirmation until a dated quotation is issued.
Key Takeaway
Key Takeaway: Cite the F5 GPL / Global Price List catalog date 2026-10-17. Do not stamp +22% on every BIG-IP chassis; R2600 is near +14% and about 3,009 lines are still 0%. Re-price software licenses and software maintenance. BENQUAN maps the dated BOM against the 2026 price list MoM versus 5 June 2026 and returns a worldwide RFQ with channel net pending confirmation.