Quick Take
Quick Take: VE is a licensed throughput ceiling, not a fixed spec — pick the tier (25 Mbps–20 Gbps) matching your L7 traffic plus headroom. Rule: 2 vCPU + 4 GB minimum, +2 GB per vCPU. KVM/VMware ~100 Gbps with SR-IOV; Hyper-V/AHV ~10 Gbps; AWS/Azure/GCP ~20 Gbps. Related: rSeries specs.
License Tiers
Quick Answer: VE licenses are sold by throughput ceiling: 25 Mbps, 200 Mbps, 1 Gbps, 3 Gbps (BYOL), 5 Gbps, 10 Gbps, and 20 Gbps (BYOL high-end), plus High-Performance vCPU-count licenses (8–24 vCPU). PAYG (pay-as-you-grow) tops out at 10 Gbps; BYOL adds the 20 Gbps tier. Perpetual and term options both exist.
VE performance depends on host CPU generation, hypervisor offload, and licensed tier — there is no single datasheet number. Use this guide to size, then lock the exact SKU and license model on the quote. Related: iSeries specs, BIG-IP vs NGINX Plus, SKU Lookup. Request a quote.
| Tier | Throughput ceiling | Typical use |
|---|---|---|
| 25 Mbps | 25 Mbps | Lab / dev / small branch |
| 200 Mbps | 200 Mbps | Edge / small office |
| 1 Gbps | 1 Gbps | Branch / mid app delivery |
| 3 Gbps (BYOL) | 3 Gbps | Mid DC virtual edges |
| 5 Gbps | 5 Gbps | Mid DC / elastic peaks |
| 10 Gbps | 10 Gbps | High-throughput VE |
| 20 Gbps (BYOL) | 20 Gbps | Top VE tier, cloud DC |
| High Perf (vCPU) | 8–24 vCPU licenses | CPU-bound L7/WAF work |
F5 SKUs like F5-BIG-LTM-VE-08-V23 (8 vCPU LTM) and F5-BIG-VNF2-VE-12V23 (12 vCPU Better Bundle) show the vCPU-licensed High Performance path; F5-BIG-WAF-VE1G-V13 shows the Mbps-tier path. Subscription add-ons (e.g., URL Filtering 1YR/3YR) stack on top.
vCPU & RAM Sizing
Quick Answer: Minimum 2 vCPU + 4 GB RAM; add 2 GB RAM per additional vCPU. Module count follows RAM: ≤4 GB = two modules, 4–8 GB = three, ≥12 GB = all modules (DNS does not count). High-Performance licenses support up to 24 vCPUs, and licensed TMM cores determine host memory needs (1 core = 2 GB host RAM baseline).
| Config | vCPU | Guest RAM | Modules |
|---|---|---|---|
| Minimal | 2 | 4 GB | Up to 2 |
| Standard | 4 | 8 GB | Up to 3 (DNS excluded) |
| Full | 6–24 | 12 GB+ | All |
Host memory scales with licensed TMM cores: 1 core = 2 GB, 2 cores = 4 GB, 4 = 8 GB, 8 = 16 GB. Use compute-optimized instances with highest IPC and clock speed; avoid low-vCPU/high-throughput pairings that starve TMM.
Hypervisor & Cloud Limits
Quick Answer: KVM and VMware support up to ~100 Gbps with SR-IOV / SmartNIC / QAT offload; Hyper-V and Nutanix AHV cap at ~10 Gbps; AWS, Azure, and GCP at ~20 Gbps. Supported platforms: ESXi, KVM, Hyper-V, AHV, AWS, Azure, GCP, IBM Cloud, Alibaba Cloud. SR-IOV is required for 10–100 Gbps on VMware.
| Platform | Max throughput | Offload support |
|---|---|---|
| KVM (private) | ~100 Gbps | SR-IOV, Intel SmartNIC, QAT |
| VMware ESXi | ~100 Gbps | SR-IOV required for 10 Gbps+ |
| Hyper-V | ~10 Gbps | TSO |
| Nutanix AHV | ~10 Gbps | DPDK (tested) |
| AWS / Azure | ~20 Gbps | Enhanced / Accelerated networking |
| GCP | ~20 Gbps | — |
Cloud instance sizing (F5 guidance): e.g., 8 vCPU / 16 GB fits 1 Gbps BEST on IBM; AWS and Azure have published instance-type maps per license tier in F5 cloud docs. Confirm VE version support for your hypervisor before upgrade.
VE vs Hardware
Quick Answer: VE wins on elasticity, cloud parity, and low entry cost; hardware wins on deterministic SSL TPS, FPGA/SmartNIC offload, dense vCMP per RU, and FIPS Level 2/3. Hybrid is common: VE for cloud peaks and dev, iSeries/rSeries for steady-state DC traffic.
Choose VE when
Cloud-native or hybrid workloads, elastic capacity, branch/dev/test, or when hardware lead time and capital budget block an appliance.
Choose hardware when
Deterministic SSL TPS, FIPS compliance (i5820-DF / i7820-DF Level 3), dense multi-tenancy per RU, or carrier-scale (VELOS CX410/CX1610).
Hybrid pattern
iSeries/rSeries steady-state + VE burst — license both through the same F5 account; keep iRules and policies in sync across form factors.
Buying Checklist
Quick Answer: Measure throughput → pick tier (25 Mbps–20 Gbps) → choose perpetual vs term/subscription → count modules vs RAM → match cloud instance type → plan HA and license transfer rules. Perpetual VE avoids subscription renewal risk; term lowers upfront cost.
- Measured L7 Gbps, RPS, SSL TPS, concurrent connections
- License tier: 25M / 200M / 1G / 3G / 5G / 10G / 20G
- Perpetual vs term vs PAYG model
- Module bundle: LTM / AWAF / APM / DNS / PEM
- vCPU count (High Performance path) and RAM per instance
- Hypervisor / cloud instance type and SR-IOV enablement
- HA pair design and license portability
- Subscription add-ons (URL filtering, etc.) and renewal
Search F5 VE parts on SKU Lookup. Commercial context: June 2026 F5 price note.
Which Part Numbers Should You Freeze on the RFQ (1 SKUs)?
Quick Answer: When quoting F5-BIG-VE-BT-1G-V23 and sibling configurations across these 1 part numbers, lock the exact base MPN, redundant power supplies, optics, and matching 1-year or 3-year support tier on separate lines before comparing vendor discounts. Channel net pricing remains industry estimate / pending confirmation.
| Ordering SKU | Key Configuration & Boundary | Adjacent BOM Lines to Freeze |
|---|---|---|
F5-BIG-VE-BT-1G-V23 | Best bundle, 1 Gbps cap, V23 = 17.1.x–23.x, about 8 vCPU max. HA, support years, hypervisor as separate lines. | F5-BIG-VE-BT-1G-V23 ×2, 1-year vs 3-year Standard, vSphere / KVM / cloud SKU, Stay within ~8 vCPU at 1G Best |
Frequently Asked Questions
Quick Answer: Can VE replace hardware entirely? Yes for elastic/cloud edges; hardware still wins on SSL TPS, FIPS, and per-RU tenancy. How long is a VE license term? 1–3 years typical, perpetual available. Does VE support FIPS? FIPS 140-2 Level 1 via add-on license on validated versions. Where to buy VE licenses?
Yes for elastic and cloud edges up to 20 Gbps (private KVM/VMware ~100 Gbps). Hardware iSeries/rSeries still wins on deterministic SSL TPS, FIPS Level 2/3, and tenant density per rack unit.
Perpetual licenses have higher upfront cost and avoid renewal risk; term (1–3 year) and subscription lower upfront spend. PAYG exists for cloud hourly usage. Confirm transfer rules when changing hypervisors.
FIPS 140-2 Level 1 is available via add-on license on validated VE versions (15.1.2.1+/16.1.3.1+ and 17.1.x). For Level 2/3 hardware HSM, use i5820-DF / i7820-DF appliances.
Contact info@benquan.hk or request a quote.
Key Takeaway
Key Takeaway: VE sells a throughput ceiling, not a box: tiers run 25 Mbps to 20 Gbps, the floor is 2 vCPU and 4 GB with 2 GB added per vCPU, and the hypervisor caps it at roughly 10 Gbps on Hyper-V against 100 Gbps on KVM with SR-IOV.