Quick Take
Quick Take: Size on L7 plus SSL TPS, not L4 Gbps. Entry i4800 is about 20 Gbps, i7800 about 80/40 Gbps, i11800 about 160/80 Gbps, i15800 about 320/160 Gbps. Standard i2000–i11000 SKUs hit End of Sale in January 2024 — only FIPS, TurboSSL, and i15000 remain orderable. Size new builds on rSeries. Plan 14 days for quote lock.
iSeries Tiers
Quick Answer: Six performance tiers span entry to flagship: i2000 (SMB), i4000 (edge/branch), i5000 (mid), i7000 (mid-high), i10000 (high), i11000 (high-end), i15000 (flagship/SP). Each tier pairs a smaller and a larger model (i5600/i5800, i7600/i7800, i10600/i10800, i11600/i11800), plus FIPS-suffixed variants (i5820-DF, i7820-DF) with integrated HSM.
Performance figures follow F5 iSeries datasheets (peak / hardware-accelerated). Before quoting: confirm the target model is not in the End of Sale list (standard i2000–i11000 SKUs EoS Jan 1, 2024; EoSS 2026–2027). Related: iSeries vs rSeries, F5 price increase, SKU Lookup. Request a quote.
| Tier | Model pairs | Typical deployment |
|---|---|---|
| i2000 | i2600 / i2800 | SMB, single-site LTM |
| i4000 | i4600 / i4800 | Edge / branch ADC, 20 Gbps class |
| i5000 | i5600 / i5800 / i5820-DF | Mid DC, 60/35 Gbps class |
| i7000 | i7600 / i7800 / i7820-DF | Mid-high DC, 80/40 Gbps class |
| i10000 | i10600 / i10800 | High DC, 160/80 Gbps class |
| i11000 | i11600 / i11800 | High-end DC, 160/80 Gbps + TurboFlex |
| i15000 | i15800 / i15820-DF | Flagship / service provider, 320/160 Gbps |
iSeries Front Panel, Ports & Throughput
Quick Answer: Climb the SKU for L7 RPS, SSL TPS, and concurrent connections. Dual numbers are typical L4/L7 throughput from vendor sheets. Exact TPS (RSA vs ECDHE-ECDSA), compression, and DDoS SYN-cookie rates vary by SKU — lock the datasheet row on the RFQ.
| Model | L4 / L7 throughput | SSL RSA 2k TPS (typ.) | ECC TPS (P-256) | Max concurrent |
|---|---|---|---|---|
| i4800 | 20 / 20 Gbps | ~20K | ~10K | 28M |
| i5800 / i5820-DF | 60 / 35 Gbps | ~35K | ~20K | 40M |
| i7800 / i7820-DF | 80 / 40 Gbps | ~40K / ~63K | ~25K / ~55K | 80M |
| i10800 | 160 / 80 Gbps | ~80K | ~48K | 100M |
| i11800 | 160 / 80 Gbps | ~80K | ~48K | 140M |
| i15800 | 320 / 160 Gbps | ~100K+ | ~100K | 300M |
Front-panel I/O on i4800 through i15800 is a 1RU/2RU TMOS appliance with SFP+/QSFP cages sized to the L4/L7 class above. i7820-DF adds FIPS 140-2 Level 3 HSM (RSA 63K TPS / 55K ECC) and up to 12 vCMP guests. FIPS-suffixed models include tamper-evident HSM. i2000/i4000 models support On-Demand Upgradable licensing within tier.
Platform Features
Quick Answer: The iSeries runs 64-bit TMOS with vCMP multi-tenancy up to twelve guests on i7820-DF class hardware, hardware SSL and ECC offload, TurboFlex performance profiles on i7000 and i11000 tiers, and optional FIPS 140-2 Level 2 or Level 3 HSM. The i2000 and i4000 tiers support in-tier license upgrades.
- 64-bit TMOS: unified LTM/ASM/AWAF/DNS/APM codebase across all tiers
- vCMP: up to 8–12 tenant guests on i5000–i7000 tiers (12 on i7820-DF)
- Hardware SSL/TLS: RSA + ECDHE-P256 offload with bulk encryption up to 40 Gbps
- TurboFlex profiles: i7000+/i11000+ tiers trade SSL capacity for bandwidth (Tier 3 = 2x bandwidth)
- FIPS 140-2: Level 2 option across line; Level 3 internal HSM on i5820-DF / i7820-DF
- DDoS: hardware SYN-cookie defense up to 130M SYN cookies/s on high tiers
- Hardware compression: up to 70 Gbps on i7820-DF
- Dual SSD + dual AC/DC PSU: standard on mid/high tiers
Use Cases
Quick Answer: Typical roles are enterprise ADC refresh, SSL offload at scale, AWAF application security, DNS and GSLB, and multi-tenant shared edges. Map legacy 7200v and 10250v installations to i5800 or i7800 class, and move chassis workloads to i11800 or i15800 when consolidation and ECDHE transaction rates dominate.
Legacy platform refresh
Map 7200v/10250v → i5800/i7800-class, then validate with F5 sizing tools. i5820-DF when FIPS Level 3 is a compliance requirement.
SSL / API gateway density
i11800/i15800 when ECDHE TPS and L7 RPS dominate the BOM; TurboFlex profiles when bandwidth matters more than TPS.
Multi-tenant shared edge
vCMP guests on i7820-DF/i11800 isolate LTM, AWAF, and DNS tenants on one box with 80M+ concurrent connections.
Vs rSeries refresh
Same-vendor platform fork — see iSeries vs rSeries buying guide.
Buying Checklist
Quick Answer: Throughput/SSL → tier → tenants/vCPU → modules → HA pair → FIPS → optics → support. L7 Gbps, RPS, and SSL TPS (RSA + ECDHE) determine tier; FIPS HSM only where compliance requires it; module bundle (LTM + AWAF/DNS/APM) is licensed separately from hardware.
- Step 1 — Size L7 Gbps, RPS, and SSL TPS (RSA + ECDHE)
- Step 2 — Pick i2000 / i4000 / i5000 / i7000 / i10000 / i11000 / i15000 tier
- Step 3 — Count vCMP tenants and vCPU per tenant
- Step 4 — Bundle LTM + security/DNS/APM modules
- Active/standby pair and sync networking
- FIPS 140-2 Level 2 vs Level 3 HSM (if required)
- Transceivers, dual PSU airflow, and rack power
- F5 support / premium entitlements
Search F5 parts on SKU Lookup (i5820-DF, i7820-DF, i11800-DS and module SKUs). Commercial context: June 2026 F5 price note.
Frequently Asked Questions
Quick Answer: Lifecycle is the decisive answer: standard i2000 through i11000 platforms went End of Sale in January 2024, leaving only FIPS, TurboSSL and i15000 SKUs orderable, so new designs belong on rSeries. FIPS variants matter only under compliance mandates, and vCMP tenancy tops out near twelve guests on i7000-class hardware.
Official iSeries hardware specifications are in F5 TechDocs: i5000/i7000/i10000/i11000 platform specifications (techdocs.f5.com). This page is the RFQ ladder — L4/L7 throughput, SSL TPS, and front-panel class — and flags the January 2024 End of Sale on standard i2000–i11000 SKUs. Size new builds on rSeries.
Official iSeries hardware specifications are in F5 TechDocs: i5000/i7000/i10000/i11000 platform specifications (techdocs.f5.com). This page is the RFQ ladder — L4/L7 throughput and SSL TPS — and flags the January 2024 End of Sale on standard i2000–i11000 SKUs. Size new builds on rSeries.
Only the exception SKUs remain orderable: FIPS (i5820-DF / i7820-DF / i15820-DF), TurboSSL (i11400-DS / i11600-DS / i11800-DS), and i15000 (i15600 / i15800). Standard i2000–i11000 platforms are End of Sale since Jan 2024 with EoSS in 2026–2027. New builds should size on rSeries.
Only when government, finance, or healthcare compliance requires FIPS 140-2 Level 2/3 cryptographic modules. Standard iSeries models handle most enterprise SSL workloads at slightly higher throughput.
Up to 8 on i5000-class, up to 12 on i7000-class (i7820-DF), with higher tiers supporting more tenants. vCMP guests are licensed separately and each runs its own TMOS instance and module set.
BENQUAN GLOBAL LIMITED supplies BIG-IP iSeries appliances, modules, and support. Contact info@benquan.hk or request a quote.
Key Takeaway
Key Takeaway: Size on L7 throughput, SSL TPS, and tenant count — never L4-only Gbps. The band runs entry i4800 (~20 Gbps) to flagship i15800 (~320/160 Gbps), with FIPS HSM options on i5820-DF/i7820-DF. EoS alert: standard i2000–i11000 SKUs are End of Sale, so size new builds on rSeries. BENQUAN supplies F5 iSeries and rSeries hardware with competitive pricing.