Quick Take
Quick Take: BIG-IP DNS module (GTM) delivers intelligent DNS and GSLB with topology, performance, and health routing. DNSSEC can cut effective QPS by 20 percent to 40 percent. Use the module under about 100K QPS with LTM; use a standalone DNS appliance at 200K+ QPS. Related: iSeries specs.
GSLB Algorithms
Quick Answer: BIG-IP DNS supports more than ten load balancing algorithms including Round Robin, Ratio, Global Availability, Topology for geographic proximity, Performance for latency-based routing, Least Connections, CPU and custom iRules. Topology and Performance dominate multi-datacenter GSLB, but Topology needs a geographic IP database and Performance needs listener probes.
DNS is often bundled with LTM in Better/Best bundles, but standalone DNS appliances exist for service providers and high-QPS enterprises. Related: rSeries specs, Licensing guide, SKU Lookup. Request a quote.
| Algorithm | Decision basis | Use case |
|---|---|---|
| Round Robin | Rotate across pool members | Equal DC capacity, simple failover |
| Ratio | Weighted distribution | Unequal DC capacity (70/30 split) |
| Topology | Client geo-location (IP → region map) | Latency optimization, data residency |
| Performance | Real-time latency probes (LDNS) | Dynamic routing to fastest DC |
| Global Availability | Health + capacity + ratio | Multi-DC with health-aware weighting |
| Least Connections | Active connection count | Stateful apps, session stickiness |
| iRules | Custom Tcl logic | Business rules (time-of-day, A/B test) |
Topology requires IP-to-region database (F5 provides GeoIP); Performance requires listener probes from each GTM to DCs. Both incur management overhead vs. Round Robin.
Performance & Scale
Quick Answer: DNS query throughput depends on appliance tier, query mix, DNSSEC signing and GSLB logic complexity. Typical figures run around 200,000 queries per second on i5820-DNS, 300,000 and above on i7820-DNS, and 500,000 and above on VELOS. Caching multiplies effective capacity while DNSSEC signing reduces it by 20 percent to 40 percent.
| Appliance tier | DNS QPS (typical) | DNSSEC signing | Zones |
|---|---|---|---|
| DNS module on i5800-class | ~50K–100K | Yes | Thousands |
| i5820-DF DNS appliance | ~200K | FIPS-signed | Tens of thousands |
| i7820-DF DNS appliance | ~300K+ | FIPS-signed | Tens of thousands |
| VELOS DNS (CX410) | ~500K+ | Yes | Hundreds of thousands |
QPS figures assume mixed query types and moderate GSLB logic. Heavy iRules or complex topology pools reduce effective QPS. Always load-test with production query patterns.
F5 documents that from BIG-IP DNS 13.0.0 onward, Maximum Answers Returned on a GSLB pool can be set up to 500 (earlier releases capped at 16). Source: F5 K55502976 BIG-IP DNS / DNS services. Checked 2026-10-16.
DNS Module vs Appliance
Quick Answer: The DNS module licenses as a software add-on on an existing LTM appliance and shares its CPU, which suits co-located deployments under roughly 100,000 queries per second. A standalone DNS appliance carries dedicated hardware and CPU, suiting 200,000 queries per second and above, service providers, or dedicated GSLB controllers.
| DNS Module | Standalone DNS Appliance | |
|---|---|---|
| Form | Software license on LTM appliance | Dedicated hardware (iSeries-DNS / VELOS-DNS SKU) |
| QPS capacity | Shares CPU with LTM (up to ~100K QPS) | Dedicated CPU (200K–500K+ QPS depending on tier) |
| Licensing | Bundled (Better/Best) or à-la-carte add-on | Standalone DNS SKU (no LTM) |
| Use case | Co-located ADC + DNS, multi-DC failover | Service provider DNS, high-QPS GSLB controller |
| SKU example | F5-ADD-BIG-DNS (module add-on) | F5-BIG-DNS-I5820-DF, F5-VEL-DNS-CX410-AC |
Use Cases
Quick Answer: BIG-IP DNS excels at multi-DC failover, disaster recovery DNS switching, traffic steering (A/B, canary), DDoS mitigation (DNS rate limiting), DNSSEC for secure zones, and service-provider authoritative DNS at scale. Licensing: bundle with LTM (<100K QPS) or standalone appliance (200K+ QPS).
Multi-DC active-active
Topology or Performance algorithm routes users to nearest/fastest DC. Health monitors detect DC failure and remove from DNS pool within TTL window.
Disaster recovery failover
Primary DC healthy → DNS returns primary IPs. Primary fails → GTM health check triggers DNS answer change to DR DC (TTL-bound switchover).
Traffic steering (A/B, canary)
Ratio or iRules steer percentage of traffic to new app version. DNS-level steering suits stateless apps; sticky sessions need BIG-IP LTM persistence.
Service provider authoritative DNS
Standalone DNS appliances (i7820-DF / VELOS-DNS) serve millions of zones with DNSSEC signing and anycast routing.
Buying Checklist
Quick Answer: Size on DNS QPS + zones + DNSSEC + GSLB logic complexity. DNS module if co-located with LTM and <100K QPS; standalone appliance if 200K+ QPS or dedicated GSLB controller. Account for HA pair, DNSSEC key management, and listener probe traffic.
- Forecast DNS QPS (peak, sustained, growth)
- Count zones and records (DNSSEC multiplies signing CPU)
- Choose module (bundled with LTM) vs. standalone appliance
- GSLB algorithm: Topology / Performance require listener + probes
- HA pair for DNS resilience (active-active or active-standby)
- DNSSEC: key rollover automation, FIPS HSM for signing (i5820-DF / i7820-DF)
- Integration: sync with LTM pool health, iRules for custom logic
- Licensing: perpetual, term, or ELA if part of larger F5 estate
Search DNS SKUs on SKU Lookup (F5-BIG-DNS-I5820-DF, F5-VEL-DNS-CX410-AC, F5-ADD-BIG-DNS module add-on). Related: F5 price change June 2026.
Frequently Asked Questions
Quick Answer: Does BIG-IP DNS replace BIND? Yes for GSLB; BIND still used for internal zones. Does DNS module require separate hardware? No — license on existing LTM appliance. Does it support DNSSEC? Yes, with FIPS signing on i5820-DF / i7820-DF. Where to buy?
GTM is the retired name; the current product is F5 BIG-IP DNS. Same job: health-check sites and return the best VIP. This page is the GSLB RFQ — query rate, DNSSEC, and when a DNS module on LTM is enough versus a dedicated DNS appliance. Confirm wide-IP and persistence rows on the quote.
Yes for authoritative zones and GSLB. BIG-IP DNS serves public-facing zones with intelligent routing. BIND/Windows DNS still used for internal corporate zones or recursive resolvers — BIG-IP DNS is authoritative only.
No. DNS module licenses on an existing BIG-IP LTM appliance (shares CPU/memory). Standalone DNS appliances (i5820-DF-DNS, VELOS-DNS) are separate hardware for high-QPS or dedicated GSLB controllers.
Yes. BIG-IP DNS signs zones with DNSSEC (RSA/ECDSA). i5820-DF / i7820-DF models with FIPS HSM provide hardware-accelerated signing for compliance and performance.
Contact info@benquan.hk or request a quote.
Key Takeaway
Key Takeaway: BIG-IP DNS module (GTM) = intelligent DNS + GSLB with topology/performance/health routing. QPS: 100K–500K+ depending on tier. DNS module suits <100K QPS co-located with LTM; standalone DNS appliance suits 200K+ QPS or service providers. GSLB algorithms: Topology (geo), Performance (latency), Ratio, iRules. DNSSEC, multi-DC failover, traffic steering. Related: F5 licensing guide.