Campus Networking / Edge / Aggregation / Wi-Fi 6/7 Backhaul

Is the 5520 VIM SKU frozen before the closet uplink speed?

Universal edge/aggregation switches — dual-persona OS, multi-gig PoE for dense APs, modular VIM uplinks, and Extreme Fabric / cloud ops for campus wiring closets.

Quick Take

Quick Take: Buy Extreme 5520 from the datasheet: freeze 24 versus 48 ports, PoE class, the VIM SKU (5720-VIM-2CE class on 5720), dual PSU, and ExtremeCloud IQ term. One VIM slot locks uplink speed for the closet. Worldwide shipping on an authorized RFQ — 1-year Pilot is not a 5-year license.

Model Ladder

Quick Answer: Pick the 5520 for classic closets: gigabit or 1/2.5/5Gb copper in 24- and 48-port SKUs, 802.3bt PoE, and four-port 10Gb or 25Gb uplink modules. The 5720 raises the ceiling — MW tops out at 5Gb copper, MXW at 10Gb — and its VIM options reach six 25Gb or two 100Gb ports.

Specs summarize Extreme Networks product pages and hardware guides. Confirm exact SKU (T/W/MW/MXW), PSU, VIM, optics, and OS persona on the quote. BENQUAN GLOBAL LIMITED supplies Extreme campus switches and optics. Related: Catalyst 9300, Aruba CX 6300, FortiSwitch, FortiAP Wi-Fi 7, SKU Lookup. Request a quote.

Series Access ports (typical) PoE Uplink / stack highlights
5520 24/48×1G; multi-gig 1/2.5/5; 24×10G model 30 / 60 / 90W (802.3bt) on PoE SKUs VIM 4×10Gb or 4×25Gb; 2× QSFP28 stacking (~200Gb, up to 8 units on Switch Engine)
5720-MW 24 or 48× 100M/1/2.5/5Gbase-T 90W PoE, perpetual / fast PoE 2× QSFP28 universal/stack; VIM-6YE (6×25Gb) or VIM-2CE (2×100Gb)
5720-MXW 24 or 48× 100M/1/2.5/5/10Gbase-T 90W PoE, perpetual / fast PoE Same QSFP28 + VIM options; use when Wi-Fi 6E/7 APs need 10G copper
90W
Max PoE / port
2
OS personas
8
Stack members*
100G
VIM-2CE ports

*5520 Switch Engine stacking up to eight units at ~200Gb per link class — confirm release and DAC/optics.

Overview

Quick Answer: One hardware family for edge and aggregation with cloud ZTP via ExtremeCloud IQ / Platform ONE, Extreme Fabric segmentation, and MACsec on supported ports. Both series target digital enterprise wiring closets: secure policy, fabric automation, and PoE for APs, cameras, and IoT.

Both series target digital enterprise wiring closets: secure policy, fabric automation, and PoE for APs, cameras, and IoT. Dual-persona hardware lets you standardize on Switch Engine (stacking, Instant Port/Stack features) or Fabric Engine (VOSS fabric) without changing the chassis SKU later. Hot-swappable redundant PSUs and fans are standard design points; select models offer front-to-back or back-to-front airflow and DC power options.

Use Cases

Quick Answer: Three deployments dominate: dense Wi-Fi 6E and Wi-Fi 7 floors, where the 5720-MXW feeds access points 10Gb copper and 90W power; fabric campuses, where the Fabric Engine persona delivers segmentation and sub-second failover with no extra fabric license; and competitive refreshes against Catalyst 9300, Aruba CX 6300, or FortiSwitch stacks.

Wi-Fi 6E / Wi-Fi 7 wired backhaul

5720-MXW 10G copper + 90W PoE for dense AP floors; pair with FortiAP Wi-Fi 7 or other multi-gig APs.

Extreme Fabric campus

Fabric Engine persona for automated segmentation and sub-second convergence without separate fabric licenses on the switch purchase path Extreme documents.

Vs Catalyst 9300 / CX 6300 / FortiSwitch

Compare stacking vs VSF vs FortiLink designs: Catalyst 9300, CX 6300, FortiSwitch.

How to Buy (Port SKU → XIQ)

Quick Answer: Start from access-point uplink speed, because that decides 5520 against 5720 and multi-gig against 1G ports. Then check the PoE budget against real camera and AP counts, since 90W ports still draw from one chassis pool. Finish with VIM optics, airflow direction, PSU type, and cloud licensing.

  1. Step 1: Port SKU — 5520 vs 5720, 24 vs 48, PoE class.
  2. Step 2: PoE budget vs real AP and camera count.
  3. Step 3: VIM and PSU — e.g. 5720-VIM-2CE plus dual PSU and airflow.
  4. Step 4: XIQ / Platform ONE term (1-year Pilot is not a 5-year license) and worldwide shipping.
  5. 5520 vs 5720 (and MW vs MXW) based on AP uplink speed
  6. 24 vs 48 ports; non-PoE vs PoE SKU
  7. PoE budget vs AP/camera count (90W ports still share chassis budget)
  8. VIM choice and optics/DAC; MACsec if required
  9. Switch Engine vs Fabric Engine; stack vs fabric leaf design
  10. Airflow (F2B/B2F) and AC vs DC PSU
  11. ExtremeCloud IQ / Platform ONE and security policy licenses
  12. Spare PSUs, fans, and optics for closet sparing

Search Extreme parts on SKU Lookup. For data-center firewalls, see Check Point Quantum Force 19000/29000.

Frequently Asked Questions

Quick Answer: Both switches ship as universal hardware, so the OS persona can be switched after deployment inside a maintenance window once feature parity is confirmed. Extreme includes the fabric feature set on the 5520 purchase path, but policy automation through Platform ONE and security licensing must still be priced separately.

Extreme publishes the 5520 Universal Switch on extremenetworks.com. This page is the RFQ ladder — 5520 versus 5720-MW / MXW copper speed — so you size a PoE closet before opening the vendor page. Confirm VIM modules and Switch Engine versus Fabric Engine on the quote.

Yes — Extreme documents persona change after initial selection, and cloud automation can load the desired OS at start-up. Plan a maintenance window and validate feature parity (stacking vs fabric) before switching production closets.

Extreme states Fabric is included with the 5520 purchase path (no extra fabric controller license for the fabric feature set they describe). Confirm current Platform ONE / security licensing for policy automation on your quote.

Yes. One VIM slot per chassis sets uplink speed for the life of that closet. Quote the VIM SKU with optics — 5720-VIM-2CE is two QSFP28 100Gb ports with breakout — not chassis-only.

RFQ 24/48-port SKU, PoE class, VIM (for example 5720-VIM-2CE), dual PSU, and XIQ term through an authorized channel with worldwide shipping. Base plus 1-year Pilot is not a 5-year license.

Key Takeaway

Key Takeaway: Choose on access-point uplink speed first, then confirm the PoE pool covers every 90W port you plan, and buy the VIM you will need in five years rather than today. Keep one model per stack. BENQUAN GLOBAL LIMITED supplies Extreme 5520 and 5720 switches with competitive pricing and worldwide shipping.

Not sure your BOM is optimal?

If you are unsure whether your BOM is optimal, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents