Quick Take
Quick Take: On paper these two 32Gb switches tie at 48 ports, 1,536 Gb/s aggregate throughput, 256 Gb/s trunks and a single rack unit. The decision is settled by operating system, support contract and three-year cost, where the DS-7720B lands 15 to 25 percent below an equivalent MDS 9148S fabric.
Dell DS-7720B vs Cisco MDS: Side-by-Side Comparison
Quick Answer: Both switches deliver 1,536 Gb/s of aggregate bandwidth, 32/16/8Gb auto-negotiating ports and 256 Gb/s trunks in 1U, so the hardware is close to a tie. The real separation is per-port cost — roughly $800 to $1,200 on the DS-7720B against $1,200 to $1,800 on the MDS 9148S.
| Specification | Dell Connectrix DS-7720B | Cisco MDS 9148S |
|---|---|---|
| Port Count | 24 - 48 Scalable | 12 - 48 |
| Port Speed | 32/16/8 Gb (auto-negotiating) | 32/16/8 Gb (auto-negotiating) |
| Aggregate Bandwidth | 1,536 Gb/s (full duplex) | 1,536 Gb/s (full duplex) |
| Operating System | Brocade Fabric OS SAN-native | Cisco NX-OS |
| Management | CLI, Web Tools, Brocade SANnav | CLI, DCNM, Cisco SAN Analytics |
| ISL Trunking | Up to 256 Gb/s per trunk (8x32Gb) | Up to 256 Gb/s per trunk (8x32Gb) |
| Diagnostics | Brocade Fabric Vision (monitoring, alerting) | Cisco SAN Analytics (telemetry, flow monitoring) |
| Form Factor | 1U, rear-to-front airflow | 1U, port-side intake/exhaust |
| Power Supplies | Dual hot-swappable (redundant) | Dual hot-swappable (redundant) |
| Fabric OS Support | Brocade native fabric (FOS) | FC-NPV mode, Fibre Channel over Ethernet (FCoE) |
| Storage Compatibility | All major FC arrays Open | All major FC arrays |
| Dell Ecosystem | Native Dell support, co-engineered | Third-party (no Dell co-engineering) |
| Warranty | 36-month Dell ProSupport | 36-month Cisco SmartNet |
| Per-Port Price (estimated) | $800 - $1,200 | $1,200 - $1,800 |
Architecture Deep Dive: Brocade FOS vs Cisco NX-OS
Quick Answer: Brocade Fabric OS has been refined for storage networking alone for more than 25 years, so its CLI carries no IP routing or firewall syntax and Fabric Vision reports CRC errors and latency outliers natively. NX-OS instead spans MDS, Nexus and UCS with one CLI, NX-API and Ansible tooling.
The fundamental difference between DS-7720B and Cisco MDS lies not in the hardware but in the operating system and management philosophy.
Brocade Fabric OS: Purpose-Built for SAN
Brocade Fabric OS is a dedicated Fibre Channel operating system. It has been optimized over 25+ years exclusively for storage networking. The CLI is concise and focused — there are no IP routing commands, no firewall rules, no virtualization constructs. This simplicity translates to fewer configuration errors and easier troubleshooting for SAN administrators. Features like Fabric Vision provide real-time monitoring of frame drops, latency outliers, and CRC errors without requiring external tools.
zonecreate "PowerStore_Prod", "10:00:00:90:fa:57:12:34; 50:06:0e:80:12:34:56:78"
cfgsave
cfgenable "Production_Fabric"
Cisco NX-OS: Unified Data Center OS
Cisco NX-OS is designed as a unified operating system that runs across the entire Cisco data center portfolio — MDS switches, Nexus switches, and UCS fabric interconnects. This means SAN administrators managing both FC and IP networking can use a single CLI syntax, scripting methodology (NX-API, Python), and automation framework (Ansible, Cisco NSO). For organizations that already run Cisco networking, the learning curve is minimal. However, NX-OS's broader scope introduces more commands and configuration options, which can increase complexity for pure SAN environments.
config t
zone name PowerStore_Prod vsan 100
member pwwn 10:00:00:90:fa:57:12:34
member pwwn 50:06:0e:80:12:34:56:78
zone commit vsan 100
When to Choose Dell Connectrix DS-7720B
Quick Answer: Pick the DS-7720B when the array is Dell — PowerStore, PowerMax or Unity XT — and a dedicated storage team owns the fabric. A redundant pair scales to 48 ports at 32Gb, keeps hardware and support on one Dell ProSupport contract, and surfaces optical faults through Fabric Vision.
PowerStore SAN Fabric — Financial Services, Hong Kong
48 ports @ 32GbBrocade FOSDell ProSupport
A Hong Kong-based financial institution deployed 2x DS-7720B switches in a redundant fabric design for a PowerStore 3200T cluster. The SAN carried production SQL Server and Oracle databases requiring deterministic sub-millisecond latency. Brocade Fabric Vision's real-time monitoring detected a marginal optical signal issue within minutes, preventing a potential performance degradation that would have affected trading operations.
- Best forDell storage environments, dedicated SAN teams
- Management stylePure SAN focus, simpler CLI
- Support modelSingle-vendor (Dell) lifecycle
- Ideal forOrganizations with dedicated storage admins
When to Choose Cisco MDS
Quick Answer: Choose Cisco MDS when UCS compute and Nexus or ACI networking are already in place: one NX-OS CLI and one Ansible framework then cover FC and IP zoning together, and UCS Manager automates SAN boot LUN mapping plus WWNN assignment for blades. Expect a separate SmartNet contract alongside your storage support.
Converged Infrastructure — Multi-Protocol Data Center
NX-OS unified mgmtUCS integrationSAN Analytics
A multi-national manufacturing company standardized their entire data center on Cisco UCS compute, Nexus IP networking, and MDS FC switching. Their SAN team managed FC zoning alongside IP networking using a single NX-OS CLI and Ansible playbook framework. The MDS switches integrated natively with Cisco UCS Manager for automated SAN boot LUN configuration and WWNN assignment for blade servers.
- Best forCisco UCS shops, converged teams
- Management styleUnified NX-OS across FC and IP
- Support modelCisco SmartNet (additional vendor)
- Ideal forOrganizations with Cisco-trained network teams
Total Cost of Ownership Comparison
Quick Answer: Over three years on a 48-port fabric the DS-7720B lands at $61,000 to $77,000 against $75,000 to $97,000 for the MDS 9148S, a 15 to 25 percent gap. Optics cost the same on both; hardware, support contracts and training are where Cisco charges more.
| Cost Factor (3-year, 48-port deployment) | Dell DS-7720B | Cisco MDS 9148S |
|---|---|---|
| Switch hardware (2 units for redundancy) | $38,000 - $48,000 | $45,000 - $60,000 |
| SFP optics (96x 32Gb, 2 switches) | $14,400 - $19,200 | $14,400 - $19,200 |
| Support contract (3-year, per switch) | $4,500 - $6,000 (ProSupport) | $7,500 - $10,000 (SmartNet) |
| Training (team of 4) | $4,000 (FOS fundamentals) | $8,000 (NX-OS DCUFI) |
| Operational overhead | Lower (SAN-only OS) | Higher (broader OS scope) |
| Total 3-year TCO | $61,000 - $77,000 | $75,000 - $97,000 |
The DS-7720B typically delivers 15-25% lower total cost of ownership over 3 years. The savings come from lower hardware acquisition cost, more affordable support contracts (Dell ProSupport vs Cisco SmartNet), and lower training costs for Brocade FOS compared to the broader Cisco NX-OS curriculum.
Decision Framework: Which SAN Switch Fits Your Environment?
Quick Answer: Decide on storage first: Dell PowerStore, PowerMax or Unity XT points to the co-engineered DS-7720B, while Cisco UCS compute favors MDS for SAN boot and WWNN automation. In mixed estates both perform equally, so let team skills decide — dedicated SAN admins suit Fabric OS, converged network teams suit NX-OS.
Quick Decision Tree
Start with your storage platform:
- Running Dell PowerStore / PowerMax / Unity — DS-7720B is the recommended fabric (co-engineered, single-vendor support)
- Running Cisco UCS compute — MDS offers deeper integration for SAN boot, WWNN management, and service profiles
- Mixed vendor environment — Both work equally well; choose based on your team's OS expertise
Then check your team: Have dedicated SAN admins? Brocade FOS is simpler and more focused. Your network team manages everything including FC? Cisco NX-OS gives them a unified CLI across the entire data center.
Frequently Asked Questions
Quick Answer: The DS-7720B ships with 24 populated 32Gb SFP ports and expands to 48 through 8-port kits, auto-negotiating down to 16Gb and 8Gb. It is qualified with PowerStore, PowerMax and Unity XT, and its Fabric OS CLI is narrower than NX-OS, which shortens training for SAN-only teams.
The Dell Connectrix DS-7720B is a Brocade-based FC switch with 48 ports at 32Gb, running Fabric OS. Cisco MDS runs NX-OS and integrates with Cisco's broader data center ecosystem. The core difference is management philosophy—Brocade FOS is purpose-built for SAN, while NX-OS is a unified network OS.
Brocade Fabric OS is widely considered simpler and more intuitive for SAN management. Its CLI is dedicated to FC operations with fewer commands. Cisco NX-OS is more powerful but has a steeper learning curve, especially for teams that do not already run Cisco networking.
Yes, the DS-7720B is fully compatible with Dell PowerStore, PowerMax, Unity XT, and all major FC storage arrays. As a Dell-branded Brocade switch, it is the recommended FC fabric for Dell storage environments.
The DS-7720B ships with 24x 32Gb SFP ports pre-installed and supports expansion to 48 ports via 8-port upgrade kits. It supports 32Gb, 16Gb, and 8Gb FC with auto-negotiation per port.
BENQUAN GLOBAL LIMITED is an authorized Dell Technologies partner. We supply the DS-7720B with SFPs, cabling, deployment, and Dell ProSupport for enterprise SAN deployments.