Storage / Procurement

Did the Dorado list add a net of 115 SKUs on 1 September 2026?

September 2026 EN price list refresh adds 115 net SKUs with one retained LIST move — catalog alignment, not a broad hike.

Quick Take

Quick Take: OceanStor Dorado EN price list revision 2026-09-01 grows from 3,931 to 4,046 SKUs — net plus 115 with 150 adds and 35 removals. Only one retained part number moves LIST: 02357BGB rises USD 4,650 to USD 4,750 (+2.15%). Eleven renumber pairs and DP2220 HCI plus OceanDisk 1610 expansions dominate. This is catalog refresh, not a broad LIST hike.

Dorado is on the public public LIST on SKU Lookup (LIST shown on SKU Lookup on SKU Lookup). LIST values cited here come from the August 4 versus September 1 catalog diff. Net price, discount, and delivery still require a dated distributor quote — industry estimate / pending confirmation on channel corridors.

What This Delta Is

Quick Answer: A Dorado price list delta is the SKU-set change between two dated EN catalog indexs — August 4 (3,931 SKUs) versus September 1 (4,046 SKUs). One retained PN moves LIST; eleven renumber pairs; 139 true adds and 24 true removes. Buyers remap BOM lines — not assume a chassis surcharge.

Definition: An OceanStor Dorado English price list delta is the difference between two dated part list sheets inside the monthly EN catalog index. Column zero is part number, column one model, column two description, column thirteen LIST price in USD. Procurement teams freeze CapEx against a catalog date; when the index grows without broad LIST movement, the operational risk is stale part numbers and missing new HCI or enclosure lines — not understating a silent reprice.

The September refresh is primarily a catalog refresh / BOM-alignment event. Palm NVMe lines migrate from legacy D*V6-SSD-NVMe-* naming into the 02553xxx range. IVS3800 nodes renumber. DP2220 hyper-converged configurations and OceanDisk 1610 systems appear as new orderable families. Support and EOM sheets also shift (+133 technical support lines; +56 part-level EOM entries) — reconcile care SKUs separately from hardware media.

  • Fit this page: Reconciling Dorado BOMs against catalog date 2026-09-01; mapping eleven renumber pairs; replacing removed 24TB NL-SAS disks; validating DP2220 or OceanDisk 1610 additions before RFQ.
  • Unfit: Readers hunting a broad OceanStor LIST increase percentage across all-flash controllers — only 02357BGB moves on a retained PN. Net negotiation and usable-TiB licensing math belong on separate RFQ sheets.

Validate live parts on SKU Lookup (Dorado). Request the full catalog via gated EN price list file — dorado-pricelist-latest (company email required; no public download URL).

Catalog Numbers: 3,931 to 4,046

Quick Answer: August 4 index: 3,931 SKUs. September 1 index: 4,046 SKUs. Net plus 115. One hundred fifty part numbers added, thirty-five removed. Eleven model+description renumber pairs, 139 true adds, 24 true removes. Exactly one LIST change on a retained part number: 02357BGB +2.15%.

Counts come from a full part-number diff between August 2026 Dorado catalog and September 2026 Dorado catalog on the part list sheet. Public SKU Lookup mirrors the September index with catalog date 2026-09-01 and public LIST enabled.

MetricValueBuyer note
Previous index date2026-08-043,931 SKUs
New index date2026-09-014,046 SKUs
Net SKU change+115Catalog growth, not price wave
Part numbers added150Includes renumber targets
Part numbers removed35Includes superseded Palm PNs
Renumber pairs (same model+desc)11Update BOM old PN → new PN
True adds (no renumber match)139DP2220, OceanDisk 1610, etc.
True removes (no renumber match)24Includes 8× 24TB NL-SAS
LIST changes on retained PN102357BGB only (+2.15%)
Public LIST on SKU LookupYesLIST shown on SKU Lookup
Other catalog sheets (Sep vs Aug)Aug rowsSep rowsNote
Technical Support Service3,7523,885+133 support lines
EOM & EOM-reaching Products116115Product family EOM list
EOM & EOM-reaching Parts1,3621,418+56 part-level EOM entries

On common part numbers across lifecycle sheets, fifty SKUs show EOM field changes and sixty-nine show newly populated EOS dates — run care and renewal BOMs against the September catalog index, not August snapshots.

How to Read Adds, Removes, and Renumber Pairs

Quick Answer: The September diff has four interpretable buckets — renumber (same model+desc, new PN), true remove (PN leaves the index), true add (new orderable PN), and retained-PN LIST move (only 02357BGB). A removed row means you cannot order that part number on the 2026-09-01 index; it is not automatically a factory stop-ship unless EOM sheets or channel confirm EOL.

The part list sheet is the current orderable part-number index for quoting — not a formal end-of-life bulletin. Procurement should classify every August→September line into one of the buckets below before you assume CapEx impact.

What you see in the diffWhat it usually meansWhat to doExample
Renumber pair (same Model + Description)Same sellable item; orderable PN changed — master-data cleanup or block reassignmentReplace old PN → new PN in ERP/PO; LIST often unchanged02357AJU → 02356MUP on HSSD-3840G-COM at USD 8,819 flat
True remove (no 1:1 renumber match)That PN is not on the September index — not quotable as a catalog lineFind successor PN, re-spec capacity, or confirm with distributorEight 24TB NL-SAS disks removed; legacy D8V6-SSD-NVMe-3.84T → 02553751 range
True addNew orderable family or PN blockAdd only when architecture brief requires itDP2220 HCI configs, OceanDisk 1610 OD1610AF*
Retained PN, LIST changeSame part number repriced on the indexUpdate LIST baseline on quotes and benchmarks02357BGB +2.15% only
Renumber + LIST changeOld PN retired; new PN carries a different LISTQuote the new PN only — do not discount the old code02356JQY → 02357BFW: USD 4,650 → 4,100

Does a removed row mean discontinued?

Removed from part list ≠ automatically discontinued. Three distinct outcomes are common:

  • Renumber (11 of 35 removals): The old PN disappears, but the product continues under a new PN with the same model string. You cannot place new orders on the old code — that is a catalog cutover, not necessarily a product EOL.
  • Successor in a new PN block: Legacy Palm lines such as D8V6-SSD-NVMe-3.84T leave the index while 02553751-class codes appear at the same LIST — treat as naming and numbering migration, then validate on SKU Lookup.
  • True catalog exit: Eight 24TB NL-SAS SKUs have no September successor in the renumber matrix — re-spec media before renewal. Formal EOM/EOS dates may appear on the EOM & EOM-reaching Parts sheet (+56 entries vs August); cross-check there before you label a line discontinued in internal docs.

Why the same model gets a new part number

When **Model, Description, and LIST all match** across old and new PN — as with HSSD-3840G-COM (02357AJU → 02356MUP) and HSSD-7680G-COM (02357AJY → 02356MUX) — the physical product family did not change on the price list. Huawei rotated the **orderable part number** for internal catalog hygiene (duplicate retirement, factory traceability, or encoding-block moves).

Part-number digits are not version ranks. A move from 02357* to 02356* does not mean "02356 is older." Always match on **Model + Description + LIST**, then update procurement systems to the September PN.

Decision flow for an August BOM line

  1. Search the **same PN** on September SKU Lookup — if found with unchanged LIST, keep the line (only 02357BGB moves LIST among retained PNs).
  2. If the PN is **missing**, check the **renumber matrix** for the same model+description — swap to the new PN.
  3. If still missing, search **Model keyword** (four+ characters) or scan **02553xxx** Palm adds for a capacity/LIST match.
  4. If no successor, treat as **true remove** — re-spec or RFQ for alternate media; check EOM sheet for lifecycle dates.
  5. Never treat **+115 net SKUs** or **35 removals** alone as proof of a **broad LIST increase** — count retained-PN LIST moves separately (one line in September).

Part Number Renumber Matrix (11 Pairs)

Quick Answer: Eleven pairs share identical model and description between August and September lists — update BOM lines from old PN to new PN before you compare quotes. Ten pairs keep LIST flat; one pair drops LIST on renumber: 02356JQY → 02357BFW moves USD 4,650 to USD 4,100 on D2-SAS-DAE25-2U-FX enclosure.

Renumber rows are not price actions on retained part numbers. Treat Palm NVMe removals in the D*V6-SSD-NVMe-* family as part of the same migration when matching replacements in the 02553xxx true-add range at identical LIST.

Old PNNew PNModelAug LIST (USD)Sep LIST (USD)Procurement read
02357AJU02356MUPHSSD-3840G-COM8,8198,819Same disk — swap PN; not a spec change
02357AJY02356MUXHSSD-7680G-COM17,07917,079Same disk — swap PN; not a spec change
02356DDW02553763D18V6-NVMe-7.68T87,40087,400Palm block migration
02355XFJ02553954L4-P-SSD768083,10083,100Palm block migration
02355XFK02553952H-P-SSD7680158,500158,500Palm block migration
02355XFM02553948L4-P-SSD384051,20051,200Palm block migration
02355LVW02356YYSIVS3800AC V2172,981172,981Same node — swap PN
02355XFH02553956L3-P-SSD768073,02573,025Palm block migration
02355LYH02357CURIVS3800ACB V275,02375,023Same node — swap PN
02355YND02356YVYIVS3800ASG V240,80140,801Same gateway — swap PN
02356JQY02357BFWD2-SAS-DAE25-2U-FX4,6504,100Renumber + LIST reset on new PN

Sole LIST move on retained part number

Part NumberModelAug LIST (USD)Sep LIST (USD)Change
02357BGBD68/8V6-SAS-DAE6254,6504,750+2.15%

When a seller quotes 02357BGB at the old LIST, flag it — the September index is authoritative. When they quote 02356JQY without mapping to 02357BFW, the line is obsolete and the LIST baseline changed on the replacement PN.

Added SKU Themes

Quick Answer: One hundred thirty-nine true adds cluster in eight themes: forty-one DP2220 HCI nodes, twenty OceanDisk/HSSD OEM lines, eighteen eKitStor PCIe5 packs, sixteen Palm NVMe PNs in the 02553xxx range, twelve OceanDisk 1610 systems, eight Pacific chassis SKUs, five OceanProtect X6000 lines, plus enclosures and misc control modules.

ThemeCountExamples / buyer note
HCI DP2220 nodes41FC-DP2220*, FC26DP2220* hyper-converged configs
OceanDisk / HSSD OEM20HSSD-O2C24*, HSSD-O0025*, OceanDisk SP 460
eKitStor (300S / 560 PCIe5)18HSSD-E0A*, HSSD-E423*, HSSD-E4215*, HSSD-E4261*
Palm NVMe new PNs1602553746–02553952 (D3/D5/D6/D8 V6 NVMe, L3/L4/H-P SSD)
OceanDisk 1610 systems12OD1610AF*, OD1610HF* (~310k–319k USD LIST chassis)
Pacific 9928/9546 chassis8P2U12SD*, PB2U12SD*, PB4U36HD*
OceanProtect X60005X6000S*, X6000N* (~250k USD LIST)
Disk enclosures / rack4ODDAE2U25S-HLW, DAE62525U2-L4-AC, RACK-FR42H-CE-FN
Other15Kunpeng control modules, DP2220 SATA disk, SP235 NIC

Sample high-value new part numbers

Part NumberFamilyLIST note (USD, Sep index)
02357KSS / 02357KSTOceanDisk 1610 AF~310k–319k LIST (1TB cache variants)
02357AHG / 02357AHHO8U2C64ND-O NVMe enclosure~2.15M LIST controller enclosure
02357SDX / 02357SEDOceanProtect X6000~250k LIST backup appliance

DP2220 and OceanDisk 1610 lines belong on RFQ columns only when the architecture brief calls for HCI or dedicated OceanDisk platforms — do not append them to a classic Dorado AFA BOM by default.

Removed Lines and Traps

Quick Answer: Twenty-four true removes have no one-to-one renumber match in the matrix. Eight are 24TB NL-SAS disks — re-spec capacity before renewal. Legacy Palm D*V6-SSD-NVMe-* lines exit; map to 02553xxx adds where LIST matches. IVS3800AS10C V2 and telepresence TP6206 also drop.

Procurement traps below are part numbers that fail SKU Lookup against the September index if you paste an August BOM unchanged.

PNModelLIST (USD)Category / trap
02315CDKBC8M04RISE367Adapter
02355WYBD8V6-SSD-NVMe-3.84T46,600Old Palm naming — map to 02553xxx
02355WYCD6V6-SSD-NVMe-3.84T42,900Old Palm naming
02355WYDD5V6-SSD-NVMe-3.84T34,700Old Palm naming
02355WYED3V6-SSD-NVMe-3.84T25,500Old Palm naming
02355XACD8V6-SSD-NVMe-7.68T87,400Old Palm naming
02355XADD6V6-SSD-NVMe-7.68T80,200Old Palm naming
02355XAED5V6-SSD-NVMe-7.68T66,000Old Palm naming
02355XAFD3V6-SSD-NVMe-7.68T48,348Old Palm naming
02355XFLL5-P-SSD384088,200Palm
02355XFNL3-NVMe-SSD384040,020Palm
02355YNBIVS3800AS10C V238,609IVS — no 1:1 renumber in matrix
02356CSED18V6-NVMe-3.84TGN46,600Palm
02356JWUH-L-NLSAS24T31,50024TB NL-SAS — removed
02356PSVL2-L-NLSAS24T11,42524TB NL-SAS
02356PUML2-L-NLSAS24TH11,42524TB NL-SAS high-density
02356PUUL3-L-NLSAS24TH13,60024TB NL-SAS high-density
02356PUVL4-L-NLSAS24TH14,30024TB NL-SAS high-density
02356PVFL3-L-NLSAS24T13,60024TB NL-SAS
02356PVGL4-L-NLSAS24T14,30024TB NL-SAS
02356UQTHSSD-E023T8P4L1N9,064eKitStor — superseded by 02553972
02356UQVHSSD-E027T6P4L1N17,120eKitStor — superseded by 02553973
02357GDNHSSD-O0425PL7T6N15,861OceanDisk 300P
02357RNXTP6206190,000Telepresence (non-storage)

RFQ How-To Steps

Quick Answer: Six steps: confirm catalog date 2026-09-01, validate every PN on Dorado SKU Lookup, apply eleven renumber pairs and Palm family mapping, re-spec removed 24TB NL-SAS, request gated price list file if the BOM exceeds lookup comfort, then lock a dated RFQ before CapEx freezes.

  1. Step 1 — Confirm catalog date. Require distributor quotes to cite Dorado EN price list revision 2026-09-01 (4,046 SKUs). Reject BOMs that still reference only the August 4 index at 3,931 SKUs when September lines are required.
  2. Step 2 — Validate SKUs on lookup. Resolve every line in SKU Lookup (Dorado). Part-number search accepts any length; model keyword search needs four or more characters. Bulk paste matches part numbers only.
  3. Step 3 — Apply renumber matrix. Replace all eleven old→new pairs in the table above. Map legacy Palm removes to 02553xxx adds where model capacity and LIST align. Do not treat 02356JQY→02357BFW as a discount on the old PN.
  4. Step 4 — Re-spec removed media. Remove eight 24TB NL-SAS SKUs from renewal BOMs. Pick supported NL-SAS or Palm NVMe tiers at current LIST. Drop telepresence TP6206 from storage BOMs.
  5. Step 5 — Request gated price list file when needed. For full-sheet reconciliation, use Request EN XLSX (dorado-pricelist-latest) with company email — file emailed to you and CC'd to info@benquan.hk.
  6. Step 6 — Lock dated RFQ. Submit the mapped BOM via rfq.html?intent=bom-risk. Freeze CapEx only after net, lead time, and compatibility confirm against catalog date 2026-09-01.

Common Traps

Quick Answer: Frequent mistakes: assuming a broad LIST hike from +115 SKUs, quoting 02356JQY after renumber, keeping 24TB NL-SAS lines, bulk-pasting model names into SKU Lookup, mixing August LIST on 02357BGB, and treating DP2220/OceanDisk 1610 as mandatory on every Dorado AFA BOM.

  • Treating catalog growth as a price wave. Only 02357BGB moves LIST on a retained PN (+2.15%). The rest is adds, removes, and renumbers.
  • Ignoring renumber LIST change. 02356JQY → 02357BFW drops LIST from USD 4,650 to USD 4,100 — update the PN, then compare LIST on the new code.
  • Renewing 24TB NL-SAS without re-spec. Eight NL-SAS24T lines leave the September part list entirely.
  • Bulk paste by model name. SKU Lookup bulk import resolves part numbers only — export PNs from the gated price list file first.
  • August LIST on 02357BGB. D68/8V6-SAS-DAE625 LIST is USD 4,750 in September, not USD 4,650.
  • Skipping EOM sheet delta. +56 part-level EOM entries and populated EOS dates on sixty-nine common SKUs — reconcile support separately.
  • Appending HCI/OceanDisk to every BOM. DP2220 and OceanDisk 1610 are new orderable families — include only when the design brief requires them.

Frequently Asked Questions

Quick Answer: September 2026 is not a broad LIST hike — one retained PN moves +2.15%. SKU Lookup carries 4,046 SKUs dated 2026-09-01 with public LIST. Full price list file is gated. Twenty-four TB NL-SAS disks leave the catalog. Bulk search is part-number only.

No broad LIST hike. The September part list grows from 3,931 to 4,046 SKUs with only one retained part number moving LIST: 02357BGB rises from USD 4,650 to USD 4,750 (+2.15%). Eleven renumber pairs and 139 true adds dominate the delta.

Yes. Dorado SKU Lookup indexes 4,046 SKUs with catalog date 2026-09-01 and public LIST on Lookup. Search by part number at any length; model keyword search needs four or more characters.

Request the gated download with a company email via dorado-pricelist-latest on this page or the Dorado hub. The file is emailed to you and CC'd to info@benquan.hk. There is no public /downloads/ hotlink.

Eight 24TB NL-SAS lines leave the September part list — including H-L-NLSAS24T and L2/L3/L4 high-density variants. Re-spec capacity with current Palm NVMe or supported NL-SAS tiers before you renew a media BOM.

No. Bulk paste in SKU Lookup resolves part numbers only. Use keyword search for model families when you do not have the PN list. Freeze RFQ lines against part numbers after renumber mapping.

Not always. Removed means the PN is not orderable on the September 2026 part list. Eleven removals are renumbers with the same model and LIST under a new PN. Twenty-four true removes need a successor or re-spec. Check EOM and EOM-reaching Parts for lifecycle dates — part-list removal alone is not a formal EOL notice.

Catalog master-data rotation — duplicate retirement, internal block moves, or traceability — without changing the customer-facing model or LIST. Example: HSSD-3840G-COM moves 02357AJU to 02356MUP at USD 8,819 flat. Part-number digits are not version ranks; update ERP to the new PN.

References

Quick Answer: Validate OceanStor Dorado product families on Huawei enterprise storage pages. Numeric SKU counts on this page come from the August 4 versus September 1 EN catalog index diff on the catalog sheet. LIST citations reflect public index values where shown.

Primary numeric source: part list sheet diff between August 2026 Dorado catalog (3,931 SKUs) and September 2026 Dorado catalog (4,046 SKUs). Net and channel pricing remain industry estimate / pending confirmation on a dated quote.

Key Takeaway

Key Takeaway: Lock Dorado BOMs to catalog date 2026-09-01 when reconciling September RFQs. Map eleven renumber pairs, re-spec removed 24TB NL-SAS, and treat only 02357BGB as a retained-PN LIST move (+2.15%). BENQUAN GLOBAL LIMITED supplies Huawei OceanStor Dorado configurations with competitive pricing.

Need the September 2026 Dorado BOM mapped before CapEx freezes?

If renumber pairs, removed NL-SAS lines, or DP2220 additions are still on an August BOM, request a free compatibility and delivery risk assessment against catalog date 2026-09-01.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents