Quick Take
Quick Take: Dell PowerVault ME5 (ME5012/ME5024 class) and HPE MSA (2060/2062 class) are peer entry block SAN arrays for SMB and mid-market. Peer them on usable capacity, protocol mix, and support years — not Alletra MP or PowerStore midrange specs. BENQUAN GLOBAL LIMITED supplies both.
When PowerVault ME5 vs MSA Actually Matters
Quick Answer: Use the Dell PowerVault ME5 versus HPE MSA bake-off for small-business and mid-market block storage area network requirements up to roughly 500 terabytes usable. Above that threshold, or where midrange all-flash data services are required, HPE Alletra MP, Dell PowerStore, and NetApp AFF form the correct comparison set instead.
- Not midrange AFA: PowerStore vs Alletra MP.
- Not MSA exit path: HPE MSA Replacement — upgrade to Alletra/PowerStore when outgrown.
- Specs: MSA 2060 specs.
Architecture Fork — ME5 vs MSA 2060 Class
Quick Answer: Both the Dell PowerVault ME5 and the HPE MSA 2060 class are dual-controller entry block arrays offering Fibre Channel and iSCSI host attachment. The ME5 emphasizes Dell support integration, while the MSA emphasizes HPE InfoSight analytics and familiar MSA management. Confirm the exact enclosure model and media mix on both quotes.
| Dimension | PowerVault ME5 | HPE MSA |
|---|---|---|
| Form factor | ME5012 / ME5024 2U | MSA 2060 / 2062 2U |
| Protocols | FC, iSCSI, SAS host | FC, iSCSI, SAS host |
| Media | NL-SAS, SSD, FIPS SED options | NL-SAS, SSD hybrid |
| Ops | ME5 web UI, CloudIQ adjacency | MSA UI, InfoSight |
Deployment Models
Quick Answer: Map the Dell PowerVault ME5 or HPE MSA deployment by host attachment, because a standalone VMware datastore, a small SQL cluster, and a remote-office consolidation each change the protocol choice and enclosure count. Fix that pattern before pricing, since protocol and enclosure decisions drive most of the entry array bill.
- VMware ROBO: iSCSI or FC datastore with 2-enclosure growth headroom.
- SQL cluster: FC preferred; match multipath and queue depth on both BOMs.
Ops & Vendor Fit
Quick Answer: Lean toward the Dell PowerVault ME5 when Dell server and support contracts already dominate the estate, and toward the HPE MSA when HPE ProLiant servers and InfoSight analytics already standardize operations. Operational fit usually outweighs small list-price gaps at entry block array scale, so state the incumbent estate on the request.
- ME5: CloudIQ monitoring and Dell ProSupport paths.
- MSA: InfoSight predictive analytics and HPE GreenLake adjacency.
Sizing Truth
Quick Answer: Force both the Dell PowerVault ME5 and HPE MSA quotes to carry equal raw and usable terabytes, the same drive type whether nearline SAS or solid state, matching protocol licenses, and five-year support. Usable capacity after redundant array configuration and sparing, not raw capacity, is the genuinely comparable figure.
- Usable capacity after RAID and sparing
- FC port count and SFP inclusion
- Snapshot and replication license lines
RFQ Checklist
Quick Answer: Send one entry storage area network brief stating usable terabytes, the input/output operations target, host protocol, host count, and growth years, so the Dell PowerVault ME5 and HPE MSA quotes stay comparable. List controller model, enclosure count, drive type per shelf, port and license lines, and five-year support with installation.
BOM lines
- Controller model and enclosure count
- Drive type and count per shelf
- FC/iSCSI port and license lines
- 5-year support and install
Datasheet Numbers: PowerVault ME5 vs HPE MSA 2060
Quick Answer: Dell lists PowerVault ME5 maximums of 264 to 336 drives, 8 host ports and 24 GB of memory. HPE lists the MSA 2060 at 240 SFF or 120 LFF drives, 8 host ports and 24 GB of cache. Compare drive count, ports and usable capacity on matched briefs.
| Item | Dell PowerVault ME5 | HPE MSA 2060 |
|---|---|---|
| Base enclosures | ME5012: 12 x 3.5 in (2U); ME5024: 24 x 2.5 in (2U); ME5084: 84 x 3.5 in (5U) | 2U with 12 LFF or 24 SFF bays |
| Max drives per array | ME5012: 264; ME5024: 276; ME5084: 336 | 240 SFF or 120 LFF |
| Expansion | Up to 9 x 2U enclosures per 2U base, or up to 3 x 5U ME484 | 0 to 9 drive enclosures (12 Gb SAS) |
| Host ports per array | 8 per protocol: 32Gb FC (auto-negotiates to 16Gb), 25Gb iSCSI, 10Gb BaseT iSCSI or 12Gb SAS | 8: 8/16Gb FC, 10/25GbE iSCSI, 1/10GBase-T iSCSI or 12Gb SAS |
| Memory and cache | 8 GB per controller plus 16 GB cache (24 GB total) | 24 GB system and data cache; up to 8 TB read cache |
| Max raw capacity | Up to 8 PB or 336 drives, whichever comes first (Dell support matrix) | 7.37 PB all-SFF or 2.88 PB all-LFF |
| Published performance | 12 GB/s read and 10 GB/s write (Dell) | Up to 395,000 random read IOPS and 13.1 GB/s sequential read in HPE lab tests |
Sources: Dell PowerVault ME5 specification sheet and HPE MSA 2060 QuickSpecs (version 24, dated 20 July 2026). Vendor performance figures come from different test set-ups, so use them only as a sanity check and ask for sizing on your own workload. Checked 2026-10-15.
How to Run a Matched ME5 vs MSA Quote in Five Steps
- Step 1: State the usable terabytes you need after RAID and sparing, not the raw terabytes.
- Step 2: Pick one host protocol (FC, iSCSI or SAS) and the port count per controller for both quotes.
- Step 3: Specify the drive type and count per enclosure, and the number of expansion enclosures.
- Step 4: Itemize transceivers or cables separately, because the MSA base array ships without SFPs.
- Step 5: Match the support term and install scope, then compare the two totals on one sheet.
Which Part Numbers Should You Freeze on the RFQ (2 SKUs)?
Quick Answer: When quoting ME5212 and sibling configurations across these 2 part numbers, lock the exact base MPN, redundant power supplies, optics, and matching 1-year or 3-year support tier on separate lines before comparing vendor discounts. Channel net pricing remains industry estimate / pending confirmation.
| Ordering SKU | Key Configuration & Boundary | Adjacent BOM Lines to Freeze |
|---|---|---|
ME5212 | ME52 2U 12-bay, dual-active, 580 W, ME512 shelves. Not ME5012 and not ME5284. | SAS or iSCSI or FC option, Capacity / RPM / SSD per bay, ME512 / ME524 / ME584, As drawn for iSCSI/FC |
ME5284 | ME52 5U 84-bay, dual-controller, 2200 W. Not ME5084 and not ME5212. | SAS or iSCSI or FC option, Capacity / RPM / SSD per bay, ME584, 5U + 2200 W |
Frequently Asked Questions
Quick Answer: Dell PowerVault ME5 and HPE MSA are peer entry block storage area network arrays, distinct from midrange all-flash platforms and from MSA replacement migration paths. Neither wins universally: Dell estates usually lean ME5 and HPE estates lean MSA, so issue matched capacity briefs to both and compare usable terabytes.
Both list 8 host ports per dual-controller array. The ME5 offers 32Gb FC, 25Gb iSCSI, 10Gb BaseT or 12Gb SAS, and the MSA 2060 offers 8/16Gb FC, 10/25GbE iSCSI, 1/10GBase-T or 12Gb SAS. Checked 2026-10-15.
Dell lists 264 drives for the ME5012, 276 for the ME5024 and 336 for the ME5084. HPE lists 240 SFF or 120 LFF drives for the MSA 2060. Checked 2026-10-15.
Neither universally. Dell estates lean ME5; HPE estates lean MSA. Dual-RFQ matched capacity briefs.
No. Replacement covers stepping up to Alletra or PowerStore when MSA is outgrown.
Send matched capacity briefs for both arrays through the RFQ form or email info@benquan.hk, and compare usable terabytes after RAID and sparing.
Key Takeaway
Key Takeaway: Under roughly 500 TB usable, shortlist ME5012 or ME5024 against MSA 2060 and 2062 and let the incumbent server estate break the tie; above that the brief belongs on Alletra MP or PowerStore. Compare usable terabytes after RAID and sparing only. BENQUAN issues paired PowerVault ME5 and HPE MSA quotes with competitive pricing.