Quick Take
Quick Take: Skipping Drive Support Package (DSP) on Dell PowerScale A2000 leaves known drive bugs and intermittent media faults unpatched. OneFS 9.x upgrades drives online via DSP for SAS HDD, SAS-SSD, and NVMe-SSD—not single-drive downloads. Confirm HEALTHY cluster state, match DSP to OneFS major, then flash nodes serially.
Scope and Why Skipping DSP Is a Cluster Risk
Quick Answer: Dell PowerScale A2000 on OneFS 9.x uses Drive Support Package to clear ETA drive bugs, intermittent media faults, and uneven firmware baselines across SAS HDD, SAS-SSD, and NVMe-SSD. The flash is online, yet any rebuild, smartfail, or hardware alert blocks the job until the cluster is HEALTHY again.
Use DSP when Dell publishes a drive firmware advisory for your media models, when intermittent drive events recur after hardware checks pass, or when a new A2000 expansion brings mismatched firmware into an existing pool. PowerScale does not expose standalone single-drive firmware downloads for production clusters; the supported path is always the Drive Support Package matched to the running OneFS major version.
| Item | Detail |
|---|---|
| Platform | Dell PowerScale A2000 |
| OS | OneFS 9.x |
| Media | SAS HDD, SAS-SSD, NVMe-SSD |
| Update mode | Online (no planned downtime) |
| Per-drive time | About 10–20 seconds |
| Node order | Serial by LNN; drives batch inside a node |
Cluster Prechecks Before Any DSP Job
Quick Answer: SSH to any node and confirm HEALTHY drives, empty rebuild/smartfail state, and no hardware alerts before you stage DSP. Block the job if OneFS itself is mid-upgrade. Four commands form the gate: isi status, isi devices drive list, isi event list, and isi devices drive firmware list.
Run these checks on a quiet maintenance window even though the upgrade is online:
- Every drive reports HEALTHY.
- No rebuild, smartfail, or unresolved hardware alerts.
- No concurrent OneFS version upgrade task.
- Operators agree not to reboot or power-cycle nodes during the job.
If any drive is unhealthy, fix media first. DSP on a degraded node can stall, leave Desired versions hanging, or amplify I/O errors.
Download and Stage the Official DSP Package
Quick Answer: Download Drive Support Package from Dell Support using the A2000 service tag. The DSP major must match the cluster OneFS major; do not force a newer DSP onto an older major from release notes alone. Stage under /ifs/data/Isilon_Support/pkg, then extract before WebUI or CLI install.
On a workstation with cluster reachability:
On the cluster node:
Expect about 10–20 seconds per drive. Multi-node clusters advance by LNN serially; inside one node, drives update as a batch while client I/O continues. Prefer off-peak windows so rebuild pressure and client latency stay predictable.
Inventory Current Drive Firmware Before You Flash
Quick Answer: isi devices drive firmware list shows bay, model, current firmware, and whether a Desired version exists after DSP install. Only drives with a non-empty Desired target will update. Use this output to size the window and to prove mixed models will not receive the wrong image.
After DSP install, re-run the list. Drives without a matching firmware inside the package stay on their current version and should not be forced with unsupported single-drive tools. Mixed HDD/SSD/NVMe pools are normal on A2000; DSP selects per model automatically.
WebUI Path — System Firmware Update for Drives
Quick Answer: In OneFS WebUI open System → Firmware Update → Drive Firmware, select the extracted DSP path, choose all nodes or one LNN, confirm online drive firmware update, then start. Progress advances by LNN. Wait until every selected node reports complete before closing the window or starting another node.
- Open OneFS management UI.
- Go to System → Firmware Update → Drive Firmware.
- Upload or select the extracted DSP package path.
- Choose scope: all nodes, or a single LNN for staged windows.
- Confirm online drive firmware update and start.
- Watch progress until all selected nodes finish.
WebUI is preferred when change control needs a visual audit trail. For scripted maintenance, use the CLI path below with the same serial-node discipline.
CLI Path — Install DSP and Start Serial Updates
Quick Answer: Install with isi_dsp_install Drive_Support_.tar, then start the job with isi devices drive firmware update start all --node-lnn=all for the full cluster, or --node-lnn=<N> for one node. Never issue parallel start commands against multiple LNNs. Poll status until the active node completes.
Install the package (use the extracted tar name from your DSP):
Full cluster (serial by LNN):
OneFS sequences nodes by LNN. It does not flash multiple nodes’ drive firmware in parallel when you use the supported all-nodes start.
Single node (staged window):
Monitor:
Post-Upgrade Validation Checklist
Quick Answer: Success means Desired shows as a dash on isi devices drive firmware list, events stay clean on isi event list --limit 50, and drives remain HEALTHY. Keep or delete the staged DSP files under /ifs/data/Isilon_Support/pkg; neither choice affects runtime once the job completes.
- Confirm
Desired: -(or equivalent empty Desired) for updated drives. - Scan the last 50 events for firmware or media errors introduced by the job.
- Reconfirm HEALTHY on every bay that participated.
- Document package name, OneFS version, start/end times, and LNNs for the change record.
Troubleshooting Common A2000 DSP Failures
Quick Answer: Partial updates usually mean rebuild/smartfail or a DSP without that model. Stuck jobs must not be cleared with reboot or power loss. Version-mismatch on import means wrong OneFS major package. New hardware alerts after a flash may need per-drive retry, then a Dell SR if they persist.
| Symptom | Likely cause | Action |
|---|---|---|
| Some drives never update | Rebuild/smartfail, unrecognized drive, or model missing from DSP | Restore HEALTHY state; confirm DSP supports the model; re-run update |
| Job stuck for a long time | Drive I/O errors or node-level stall | Do not reboot/power-off; check events; retry that LNN alone after HEALTHY |
| DSP import reports incompatible | DSP major does not match OneFS major | Download the matching DSP per Dell release notes for this OneFS |
| Hardware alerts after completion | Individual drive flash anomaly | Retry the affected drive path if supported; open Dell SR with serials and events |
Ops Notes — DSP vs NFP and Mixed Media
Quick Answer: DSP only updates drive firmware. BIOS, BMC, and NIC firmware need a separate Node Firmware Package (NFP). Never confuse the two packages in the change ticket. Mixed drive models are safe under DSP because the package matches images per model instead of forcing one binary onto every bay.
- Online upgrade does not mean peak-hour safe — schedule off-peak when possible.
- Never interrupt with power or reboot while firmware is writing.
- Do not manual-flash single drives outside DSP.
- DSP files may remain in
/ifs/data/Isilon_Support/pkgafter success; cleanup is optional. - For node/platform firmware, plan a distinct NFP window — not this DSP procedure.
Frequently Asked Questions
Quick Answer: A2000 drive firmware is online via DSP only, scoped to drives not NFP node firmware, and must run on HEALTHY clusters with serial LNN discipline. Use the FAQ below when change boards ask about downtime, package choice, parallel nodes, or leftover Desired versions after the job.
No. Drive Support Package updates run online for SAS HDD, SAS-SSD, and NVMe-SSD on OneFS 9.x. Still avoid peak I/O windows. Never power off or reboot nodes while a drive firmware job is active.
No. PowerScale manages drive firmware through the official Drive Support Package. Manual single-drive flashes are unsupported and risk mixed baselines. DSP auto-matches models in mixed media pools.
DSP upgrades drive firmware only. Node Firmware Package (NFP) covers BIOS, BMC, and NIC firmware. Do not substitute one package for the other when planning A2000 maintenance.
OneFS runs drive firmware by logical node number in series. Parallel multi-node flashes raise simultaneous media risk. Finish one LNN completely before starting the next when you stage by node.
Re-check HEALTHY state, confirm the DSP includes that drive model, then retry the node. Persistent hardware alerts after a clean job need a Dell SR with serials and isi event output.
Key Takeaway
Key Takeaway: Run DSP only on a HEALTHY A2000 cluster with no rebuild or smartfail, matching OneFS major. Prefer WebUI or CLI serial node flashes; never parallel multi-node drive firmware jobs or power cycles mid-update. BENQUAN GLOBAL LIMITED supplies Dell PowerScale A2000 nodes and spare media with competitive pricing.