Storage / Backup / PowerProtect DD / RFQ

DD9910: 1,536 TB Usable, Not 157.5 PB?

Logical PB is not purchased disk. Freeze usable TB, packs, Cloud Tier, and capacity license before PO.

Quick Take

Quick Take: A DD9910 Active Tier tops out at 1,536 TB usable in Dell’s DDOS 8.0 table, starting from six 8 TB disk packs. The 157.5 PB figure is a 75:1 logical estimate, not the disk you bought. Cloud Tier is a separate license and four metadata packs.

If your RFQ freezes logical PB instead of usable TB, you ordered a marketing story — not retention you can restore from.

Key extractable numbers

DD9910 capacity on this page (DDOS 8.0 table): Active Tier max usable 1,536 TB from a six × 8 TB pack start; Cloud Tier up to 3,072 TB usable with license plus four metadata packs; memory 2,048 GB; front SSDs 10 × 3.84 TB; CPU-SP 52-core 300 W Intel 8470N. The 157.5 PB figure is a 75:1 logical estimate—not purchased disk. DD9410 shelf counts do not paste onto DD9910.

What a Dell PowerProtect DD9910 Quote Actually Is

Quick Answer: A DD9910 is Dell’s large PowerProtect Data Domain appliance class (with DD9910F sibling). It is an Active Tier dedupe target with optional Cloud Tier. It is not a primary NAS, and it is not the same shelf map as a DD9410.

Think of usable TB as the fuel tank you paid for, and logical PB as the range the brochure claims if every kilometre is downhill. Your PO must buy the tank. Dell’s shop card also quotes marketing bands such as 576 TB–2.1 PB usable, with Cloud Tier up to 5 PB usable and logical figures up to 157.5 PB (or 375 PB with Cloud Tier) assuming typically 75:1 reduction. Workload decides whether you ever see those logical numbers.

Fit: multi-site backup targets that need more than about 576 TB usable and a dedicated dedupe appliance.

Unfit: primary NAS workloads, or a backup job that already fits a DD6410 or DD9410 without forcing an oversize chassis.

Capacity and Hardware Numbers You Can Freeze

Quick Answer: Active Tier max usable is 1,536 TB in the DDOS 8.0 manual table. Cloud Tier adds up to 3,072 TB usable with license plus metadata packs. Memory is 2,048 GB. Front SSDs are 10 × 3.84 TB. CPU-SP is a 52-core 300 W Intel 8470N.

ItemPublished figureBuyer note
Active Tier usable (DDOS 8.0)Up to 1,536 TBFreeze this class of number, not logical PB
Cloud Tier usableUp to 3,072 TBNeeds license + metadata packs
Cloud Tier metadata480 TB raw / 384 TB usableFour packs
Active Tier packs6 min / 16 max (8 TB drives)90–240 disks
Memory2,048 GB (32 × 64 GB DDR5)Up to 4800 MT/s
Front SSDs10 × 3.84 TBVerify on the live config
CPU-SP52-core 300 W Intel 8470NActive Tier compute
Shop-card logical (typical)Up to 157.5 PB / 375 PB w/ Cloud Tier~75:1 estimate incl. ~30% HW compression

Networking on Dell’s shop card: 1 management plus 2 LOM required; required rNDC/OCP options include 4× 10GBASE-T or 4× 10/25G SFP+. Optional adds include up to four 10GBASE-T, four quad 10/25G SFP28, four dual 100G QSFP, or four quad 32G FC HBA. Shelves are named DS600 (SAS) and FS240 (SSD). Cache Tier on DD9910 does not need a separate license.

  • Write usable TB and pack count on line 1 of the RFQ.
  • Write Cloud Tier license yes/no and metadata pack count on line 2.
  • Write network option and HA yes/no before anyone prices optics.
  • Demand dated ATP for chassis, packs, and entitlements against one go-live.

DD9910 vs DD9410 — Same Family, Different Shelf Math

Quick Answer: Both sit in the PowerProtect Data Domain family, but DD9410 Active Tier pack ranges and DD9910 pack ranges are not interchangeable. Copying a DD9410 shelf count onto a DD9910 is a classic BOM fail.

DimensionDD9410 (sibling)DD9910
Active Tier packsTypically 2–8 packs6–16 packs (8 TB)
RoleMid/large targetLarge capacity target
Cloud TierSeparate design pathLicense + 4 metadata packs
HA pathFamily HA guideDD9410/DD9910 install + HA upgrade guide
Quote trapUnder-buying packsTreating logical PB as purchased

If you need a dual-vendor peer against HPE StoreOnce, keep that bake-off on the existing buying guide — this page freezes the DD9910 order itself. Do not rewrite StoreOnce sizing here.

BOM Lines That Must Appear Before PO

Quick Answer: Chassis, Active Tier packs, capacity license, optional Cloud Tier license and metadata packs, network options, HA interconnect if dual-head, support years, and dated ATP. Missing any of those turns a “ready” quote into a stalled cutover.

LineWhat to freezeCommon miss
ChassisDD9910 or DD9910FVague “Data Domain” line
Active Tier packsCount 6–16, 8 TB classPack count TBD
Capacity licenseMatches usable TBLicense after shelf arrives
Cloud TierLicense + 4 metadata packsChassis-only + “cloud later”
Networkmgmt + LOM + rNDC/OCPOptics after cutover
HAInterconnect + second head if requiredSingle-head quote for dual design

Expansion rule of thumb

Dell’s HA and expansion guidance is clear in spirit: adding capacity requires a license for the new capacity before the shelf is added. Treat “crate first, license later” as a red flag on any DD9910 growth PO.

How to Freeze a DD9910 BOM Before Purchase Order

Quick Answer: Freeze usable TB from the DDOS table, lock pack count, decide Cloud Tier with its metadata packs, itemize network and HA, then gate every expansion on a capacity license dated to the same go-live.

  1. Step 1 — Freeze usable TB, not logical PB. Write the Active Tier usable TB target from Dell’s DDOS table. Reject quotes that only print 157.5 PB or 375 PB logical.
  2. Step 2 — Lock Active Tier pack count. Confirm pack count between 6 and 16 of 8 TB drives. Minimum is six packs / 90 disks.
  3. Step 3 — Decide Cloud Tier on or off. If on, add the Cloud Tier license and four metadata packs. If off, strike those lines so they cannot sneak in later.
  4. Step 4 — Itemize network and HA. Require management + LOM, choose rNDC/OCP (4× 10GBASE-T or 4× 10/25G SFP+), and note HA interconnect if dual-head.
  5. Step 5 — Gate capacity license before expansion. Any shelf add needs a capacity license for the new usable TB before the DS600 or FS240 is added.

Use SKU Lookup, then submit the brief on rfq.html. BENQUAN can dual-path the brief with Worldwide Shipping and Ex-Stock Free Port options when stock exists — lead time stays pending confirmation until ATP is dated.

Real-World Deployment Scenarios

Quick Answer: Three scenes show where DD9910 quotes succeed or fail: a multi-site backup target that finally needs >576 TB usable, a Cloud Tier offload design that forgot metadata packs, and an HA pair where capacity license trailed the second shelf.

1) Multi-site backup target past mid-size class

Ops needs a single large dedupe landing zone. Procurement pastes a logical PB figure into the RFQ. Architecture freezes 1,000+ TB usable and six-to-twelve packs instead. The PO survives the first full retention cycle because usable TB was written, not assumed.

2) Cloud Tier offload without metadata

Design says “Cloud Tier later.” Chassis ships. Cloud Tier license appears weeks later without four metadata packs. Offload stays dark until packs and license land together — treat that as one CapEx gate, not a follow-on shopping trip.

3) HA expansion with shelf-first habit

Second head and DS600 shelves are approved. Capacity license for the new usable TB is “to follow.” Dell’s expansion path wants the license before the shelf is added. Align ATP or move the expansion window — do not hope entitlement clears after crates land.

Frequently Asked Questions

Quick Answer: Logical PB is not purchased disk. Minimum Active Tier is six 8 TB packs. Cloud Tier needs license plus four metadata packs. DD9410 shelf counts do not paste onto DD9910.

No. It is Dell’s typical logical capacity at about 75:1 reduction, including about 30% hardware compression. Freeze usable TB on the quote, not logical PB.

Six 8 TB Active Tier packs — 90 disks — per Dell’s install guidance. Maximum Active Tier is 16 packs (240 disks).

No. Cloud Tier needs a separate license plus four metadata disk packs (480 TB raw / 384 TB usable metadata).

No. DD9410 Active Tier is typically 2–8 packs; DD9910 is 6–16. Treat them as different shelf maps.

References

Quick Answer: Use Dell’s DDOS capacity table, the shop card, and the family spec sheet as the evidence pack. Keep usable TB and pack counts aligned to those pages before CapEx locks.

Key Takeaway

Key Takeaway: Freeze usable TB from Dell’s Active Tier table, pack count between 6 and 16, and Cloud Tier as a separate license-plus-metadata decision. Treat logical PB as a workload estimate, not purchased capacity. BENQUAN supplies PowerProtect DD9910 packages with Worldwide Shipping after you freeze an equal brief.

Not sure your DD9910 BOM is optimal?

If usable TB, disk packs, Cloud Tier, or capacity-license timing are unclear, click below for a free compatibility and delivery risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents