Quick Take
Quick Take: Size and buy PowerEdge R760 worldwide from the spec sheet: freeze CPU, 32 DDR5 slots, PSU, and the front-panel cage (twelve 3.5-inch bays through sixteen EDSFF E3.S) before price. Those four choices constrain each other. Quote ProSupport years on an authorized RFQ with worldwide shipping — channel net pending confirmation.
Most R760 quotes go wrong before price comes up. Choose the drive cage after the CPU and PSU are priced, and you can end up with a chassis that will not take the drives or the memory speed you planned. Fix the four specs below in order, then ask for a number.
Front Panel & Spec Sheet
Quick Answer: Two sockets take 4th Generation Xeon Scalable or Xeon Max up to 56 cores, or 5th Generation parts up to 64 cores. Thirty-two DDR5 RDIMM slots reach roughly 8TB at 5600 MT/s on 5th Generation silicon, and riser choice yields up to eight PCIe slots for GPUs, HBAs and OCP networking.
Specs summarize Dell PowerEdge R760 spec sheets and technical guides. Lock the CTO BOM (CPU stepping, DIMM speed, drive cage, PERC/HBA, OCP) against the quote package. BENQUAN GLOBAL LIMITED supplies PowerEdge servers and options. Related: HPE DL380 Gen11, Cisco UCS X-Series, PowerStore T, SKU Lookup. Request a quote.
| Attribute | Published range |
|---|---|
| Form factor | 2U rack |
| Processors | 2× 4th Gen Xeon Scalable / Xeon Max (≤56 cores) or 2× 5th Gen Xeon Scalable (≤64 cores) |
| Memory | 32× DDR5 RDIMM, up to ~8 TB; 4800 MT/s (4th Gen) / 5600 MT/s (5th Gen) |
| Chipset | Intel C741 |
| PCIe | Up to 8 slots (Gen4/Gen5 mix by riser) |
| GPU | Up to 2× 350W double-wide or 6× 75W single-wide |
| Network | Optional 2×1GbE LOM and/or OCP 3.0 mezz |
| Management | iDRAC9; dedicated NIC; iDRAC Direct |
| Boot | BOSS-N1 (dual M.2) common for OS |
Overview
Quick Answer: R760 is Dell's mainstream two-socket 2U server for databases, analytics, VDI, virtualization and GPU-assisted inference. Against the R750 it moves to DDR5, wider PCIe Gen5 and higher core counts on 5th Generation Xeon. Air cooling is standard, iDRAC9 handles management, and Direct Liquid Cooling stays optional for high-TDP builds.
R760 targets databases, analytics, VDI, virtualization, and GPU-assisted inference in a dense 2U footprint. It succeeds the R750 generation with DDR5, PCIe Gen5, and higher core-count 5th Gen Xeon options. Air cooling is standard; DLC is available for selected high-TDP CPU/GPU builds. Management is via iDRAC9 with Silicon Root of Trust and Secure Boot capabilities Dell documents for the 16G portfolio.
Drive Bay Options
Quick Answer: Front bays decide the platform: twelve 3.5-inch slots for roughly 240TB of nearline capacity, eight to twenty-four 2.5-inch bays scaling past 368TB, or sixteen EDSFF E3.S slots for Gen5 NVMe. Rear cages add another 30 to 61TB class, and hardware PERC RAID excludes direct NVMe on many bays.
| Bay layout (examples) | Media | Published max capacity class* |
|---|---|---|
| 12× 3.5" front | SAS/SATA HDD/SSD | ~240 TB |
| 8× 2.5" front | SAS/SATA/NVMe | ~122.88 TB |
| 16× 2.5" front | SAS/SATA/NVMe | ~245.76 TB |
| 24× 2.5" front | SAS/SATA/NVMe | ~368.64 TB |
| 16× EDSFF E3.S front | Gen5 NVMe | ~122.88 TB |
| 2/4× 2.5" or EDSFF rear | SAS/SATA/NVMe | ~30–61 TB class |
*Dell published maxima with largest drives — usable capacity depends on RAID and drive SKUs.
- PERC hardware RAID and HBA/NVMe paths are mutually exclusive choices for many bays — confirm early.
- SED / data-at-rest encryption options exist for regulated workloads.
- Software RAID (S160) is available for selected OS/boot designs.
PCIe Gen5 & GPU
Quick Answer: Eight PCIe slots is the ceiling, split across full-height and half-length profiles by riser, and GPU capacity tops out at two 350W double-wide cards or six 75W single-wide ones. Loaded GPU and high-TDP CPU builds push into 2800 to 3200W Titanium power supplies and sometimes Direct Liquid Cooling.
- Up to eight PCIe slots across full-height/full-length and half-length profiles.
- GPU: dual 350W DW cards or up to six 75W SW cards (config-dependent).
- High-TDP CPU + GPU builds may require higher-wattage Titanium PSUs (Dell lists options through 2800–3200W class) and optional DLC.
- Dell CPQ quotes may show chassis variant quote-line codes such as R760XL / OTH-R760XL; PSU specifications for those lines follow the same R760 power table — verify the 2800–3200W Titanium options on GPU builds.
- OCP 3.0 + LOM can coexist on many configs — useful for management vs data plane separation.
Use Cases
Quick Answer: Virtualization clusters take dual 5th Generation Xeon with dense DDR5, BOSS-N1 for the operating system and NVMe for local cache. Database and analytics builds favor high core counts with EDSFF Gen5 bays for local tables, moving to a PowerStore T array when the workload needs shared storage instead.
Virtualization / private cloud
Dual 5th Gen Xeon + dense DDR5 for VMware / Hyper-V / KVM clusters; BOSS for OS, NVMe for local cache.
Database & analytics
High core count + EDSFF Gen5 for low-latency local tables; external SAN via PowerStore T when shared storage leads.
Vs DL380 Gen11 / UCS X
Compare with DL380 Gen11 and modular UCS X-Series on multi-vendor compute RFQs.
Buying Checklist
Quick Answer: Lock the CPU generation first, because 4th versus 5th Generation Xeon changes both core ceiling and DIMM speed. Then set DIMM population for the target transfer rate, pick the front cage, decide PERC RAID against direct NVMe, size OCP network speed and GPU count, and confirm PSU wattage and iDRAC entitlement.
- 4th vs 5th Gen Xeon (and any Max SKU needs)
- DIMM population for target MT/s (1DPC vs 2DPC)
- Front cage: LFF vs SFF vs EDSFF; rear bay yes/no
- PERC RAID vs NVMe direct-attach
- OCP NIC speed (10/25/100) and optics
- GPU count vs remaining PCIe for storage/network
- PSU wattage, airflow, optional DLC
- iDRAC license tier and ProSupport entitlement
Search Dell / server parts on SKU Lookup. For ToR networking, see Aruba CX 8325.
How to Order an R760: Four Steps From Spec Sheet to RFQ
Quick Answer: The PowerEdge R760 is a 2U dual-socket rack server, and ordering one without regret means freezing four things in sequence: CPU generation and memory population, drive-bay layout, power and cooling envelope, and finally a multi-vendor RFQ that carries dated lead times. Each step below names the exact fields your quote must show.
Step 1 — Lock the compute base. Choose 4th versus 5th Generation Xeon first, because it caps core count and DIMM speed together; then set DIMM population for the target MT/s rather than raw capacity. Step 2 — Pick the bay layout before accessories. Twelve 3.5-inch bays buy nearline capacity around 240TB, 24x 2.5-inch front bays scale past 368TB, and 16x EDSFF E3.S slots serve Gen5 NVMe — PERC RAID excludes direct NVMe on many layouts, so decide RAID policy at this step, not later. Step 3 — Size power honestly. Match PSU wattage to measured draw plus roughly 20 percent headroom, confirm airflow direction against the rack, and treat DLC as a facility decision, not a line-item afterthought. Step 4 — Issue one matched RFQ. Submit the frozen brief so peer columns arrive on identical meters, each carrying a dated lead-time line — expect 14 to 35 business days depending on stock path, and reconfirm before the PO signs.
RFQ checklist before you PO
Quick Answer: Freeze model and option SKUs, support or subscription years, ship-by date, and HA or spare needs on one dated ATP before you compare channel prints. Use the checklist below, validate lines on SKU Lookup when the brand is indexed, then open a BOM risk RFQ — soft channel prices stay industry estimate or pending confirmation.
- Model / MPN lines — chassis and options matching this page (not a vague family name).
- Quantities + HA — single unit vs pair; spare FRUs if required.
- Support / subscription years — tier and term on the same quote as hardware.
- Ship-by / quote validity — lock reprice-until-ship language when memory or list cliffs apply.
- Acceptance — Service Tag / serials vs PO; reject surprise third-party parts without paperwork.
Free Compatibility & Delivery Risk Assessment · Dell SKU Lookup
Which Part Numbers Should You Freeze on the RFQ (5 SKUs)?
Quick Answer: When quoting PowerEdge R660xs and sibling configurations across these 5 part numbers, lock the exact base MPN, redundant power supplies, optics, and matching 1-year or 3-year support tier on separate lines before comparing vendor discounts. Channel net pricing remains industry estimate / pending confirmation.
| Ordering SKU | Key Configuration & Boundary | Adjacent BOM Lines to Freeze |
|---|---|---|
PowerEdge R660xs | 1U 16G, CPU/RDIMM/PERC/SSD/PSU/iDRAC/ProSupport as separate lines. Confirm 3.5-inch chassis vs NVMe drawing. | Xeon PID × sockets, RDIMM SKU × slots, SSD/HDD + PERC, Redundant wattage |
FCT2250 | W880 chipset, Core Ultra 5/7/9, DDR5, discrete GPU, 360/500/1500 W PSU. Do not copy an R660xs BOM. | Dell Pro Max Tower T2 FCT2250, Core Ultra PID + TDP, DDR5 SKU × slots, Exact NVIDIA/AMD PID |
PowerEdge R760XD2 | 2U, 24x 3.5-inch + rear bays, dual Xeon 4th/5th Gen, 16x DDR5, 1 Gbps LOM. Not R760. | PowerEdge R760xd2, Exact Xeon PID x sockets, RDIMM SKU x slots, 3.5-inch PIDs + H755/H965 class |
PowerEdge R670 | 1U Xeon 6, 32x DDR5, E3.S or 2.5-inch cage. Not R660/R660xs. Write CPU, DIMM, cage, BOSS, PSU. | PowerEdge R670 / 210-BNZH, Xeon 6 P-core or E-core x2, DDR5 RDIMM size x count, E3.S vs 2.5-inch vs no BP |
PowerEdge R7625 | 2U EPYC 9004, 24x DDR5, 210-BFMO. Write CPU (9474F vs 9554), DIMM, bays, PSU. Not R760. | PowerEdge R7625 / 210-BFMO, EPYC 9004 SKU x2, DDR5 RDIMM size x count, 2.5 / 3.5 / E3.S map |
Frequently Asked Questions
Quick Answer: Against the R750, R760 brings DDR5, broader PCIe Gen5 and 5th Generation Xeon options, so new quotes should prefer it unless matching an existing R750 fleet. Direct Liquid Cooling is available for high-TDP combinations, but confirm facility CDU and loop readiness before adding DLC part numbers to the order.
The official PowerEdge R760 spec sheet is on Dell's site: poweredge-r760-spec-sheet.pdf. This page is the RFQ table — CPU generation, DIMM speed, drive cage, and PSU lines — so you can size before opening the PDF. Confirm the CTO SKUs on the quote.
R760 moves to DDR5, broader PCIe Gen5, and 5th Gen Xeon options. R750 remains a prior 15G platform — new quotes should prefer R760 (or current R770) unless matching an existing R750 fleet.
Yes — Dell documents optional Direct Liquid Cooling for required high-TDP CPU and configuration combinations. Confirm facility CDU/loop readiness before ordering DLC SKUs.
OTH-R760XL and R760XL are Dell CPQ quote-line codes for R760 chassis variants, not a different server family. PSU specifications for those lines follow the same R760 power table — verify the 2800–3200W Titanium options on GPU builds before you freeze the PO.
Contact info@benquan.hk or request a quote.
Key Takeaway
Key Takeaway: Fix the processor generation before anything else, since 4th Generation caps at 56 cores and 4800 MT/s while 5th Generation reaches 64 cores and 5600. Only then pick the cage, because hardware RAID and direct NVMe are exclusive on many bays. BENQUAN GLOBAL LIMITED supplies the Dell PowerEdge R760 with competitive pricing.