Servers / Dell PowerEdge / RFQ

PowerEdge R670: have you picked E-core or P-core first, instead of copying the R660 parts list?

R670 is Xeon 6, not an R660 refresh. Pick E-core or P-core before DIMMs and drive cages.

Quick Take

Quick Take: Treat R670 as a new platform. Pick E-core or P-core first, then DIMM speed, then the drive chassis. Copying an R660 BOM orders parts the 1U Xeon 6 server cannot use Compare on TCO, feature parity, and existing vendor relationships.

An R660 CPU, DIMM generation, and drive cage will not drop into an R670. One shared option set is how RFQs fail at config validation.

What a PowerEdge R670 Quote Is

Quick Answer: The PowerEdge R670 is a 1U, two-socket rack server on Intel Xeon 6. It is not a BIOS refresh of the R660. CPU, DIMM generation, and drive carriers are not interchangeable with the previous 1U dual-socket Intel generation.

Buyers often paste leftover R660 lines into an R670 quote because both are 1U dual-socket Dell racks. That habit burns CapEx. Start from workload, not from the old spreadsheet.

Fit: new 1U virtualization or dense NVMe builds that need Xeon 6 density.

Unfit: a GPU box that needs more than 3× 75 W single-wide accelerators.

R670 Numbers You Can Freeze on the RFQ

Quick Answer: Two Intel Xeon 6 CPUs (E-core up to 144 cores per processor, or P-core up to 86). Memory: 32 DDR5 DIMMs, up to 8 TB, up to 6400 MT/s. PCIe: up to 3 ×16 Gen5. Optional DLC on required CPU SKUs.

ItemPublished figureBuyer note
Form factor1U, two socketsNew platform vs R660
CPU2× Intel Xeon 6 E-core or P-coreE up to 144C; P up to 86C per CPU
Sample CPUs6710E / 6756E / 6787P classConfirm exact PID on quote
Memory32 DDR5 RDIMM, up to 8 TB16 DIMMs per CPU; up to 6400 MT/s
CXL 2.0P-core onlyPer technical guide
Storage optionsUp to 8/16/20 E3.S; 8× 2.5"; 10× 2.5" SATA; 2 rear E3.SFront-I/O vs rear-I/O chassis differ
PCIe / NICUp to 3 ×16 Gen5; 2 optional OCP 3.01/10/25/100/400 GbE named
GPU / DPUUp to 3× 75 W SW; BlueField-3 B3220 exampleNot a dense GPU box
PSU examples1400 W -48 VDC; 1800 W HLAC Ti; 1500 W 277 Vac/HVDC TiDo not invent other wattages

Sample CPU details Dell prints: 6710E (64C, 205 W, DDR5-5600), 6756E (128C, 225 W, DDR5-6400), 6787P (86C, 350 W, DDR5-6400). Firmware gates matter: service-manual examples show 6787P and 6767P needing iDRAC 1.20.25.00, BIOS 1.2.6, and FPGA 107.114.104. A used chassis with old iDRAC will not post a new P-core CPU.

Why an R660 BOM Fails on an R670

Quick Answer: R660 is the previous 1U dual-socket Intel generation. CPU, DIMM generation, and drive carriers are not interchangeable. Keep R660 leftovers on separate lines if both platforms remain in the rack.

DimensionR660 (prior 1U)R670
CPU generation4th/5th Gen Xeon Scalable classIntel Xeon 6 E-core or P-core
DIMMPrior DDR5 map for that gen32 DDR5 slots; speed tied to Xeon 6 CPU
Drive carriersPrior 2.5" / bay mapE3.S and 2.5" options; different cages
CXLNot the R670 P-core pathCXL 2.0 on P-core only
Quote ruleOwn option setOwn option set — never shared

Do not publish R660 list prices here. If you need prior-gen sizing context, keep it on the existing R760/R660 articles and link out.

E-core vs P-core — The First Fork on Every R670 Quote

Quick Answer: E-core and P-core change core count, TDP, memory speed, and CXL. Write the letter on the RFQ before anyone prices DIMMs or DLC.

  • E-core path: density-first (examples up to 144 cores per CPU). Memory speed still depends on the exact SKU (6710E vs 6756E differ).
  • P-core path: higher per-core performance class (examples up to 86 cores). CXL 2.0 supported. Watch TDP and DLC requirements.
  • DLC: optional direct liquid cooling only for required CPU SKUs — not a blanket add-on.
  • Firmware: confirm iDRAC/BIOS/FPGA minimums before a P-core swap into an existing chassis.

Mixed-rack tip

You can keep R660 and R670 in the same cabinet. You cannot keep them on the same option set. Two lines, two ATP notes, two support SKUs.

How to Build an R670 RFQ from a Workload Instead of an R660 Spreadsheet

Quick Answer: Choose E-core or P-core, freeze DIMM count and speed, pick the drive chassis, check DLC and firmware gates, then split any R660 leftovers onto separate lines.

  1. Step 1 — Pick E-core or P-core first. Write the CPU class before DIMM speed or drive cage. Confirm the exact CPU PID on the quote.
  2. Step 2 — Freeze DIMM count and speed. Plan up to 32 DDR5 RDIMM slots (16 per CPU), up to 8 TB, up to 6400 MT/s as the CPU allows. CXL 2.0 is P-core only.
  3. Step 3 — Choose the drive chassis. Select EDSFF E3.S (8/16/20), 2.5-inch SATA/NVMe/Universal, or rear E3.S options from the guide. Front-I/O and rear-I/O chassis differ.
  4. Step 4 — Check DLC and firmware gates. Add DLC only when the CPU SKU requires it. Confirm iDRAC/BIOS/FPGA minimums before dropping a new P-core into an older chassis.
  5. Step 5 — Split R660 leftovers onto separate lines. Never share one option set across R660 and R670. Two platforms, two BOM trees.

Use SKU Lookup, then rfq.html. BENQUAN supplies PowerEdge R670 packages with Worldwide Shipping after the brief is equalized.

Real-World Deployment Scenarios

Quick Answer: Three scenes: a virtualization refresh that pasted R660 DIMMs, a dense NVMe build that picked the wrong bay map, and a P-core swap that ignored iDRAC minimums.

1) Virtualization refresh with leftover R660 lines

Procurement copies last year’s R660 CPU and DIMM PIDs into an R670 cart. Config validation rejects the parts. Fix: rewrite from E-core/P-core choice, then DIMM speed, then cage — delete the R660 option set.

2) Dense NVMe on E3.S

Architecture wants 16 or 20 EDSFF E3.S drives. The quote still shows a 2.5-inch backplane from an old R660 kit. Front-I/O versus rear-I/O chassis also differ. Freeze the bay map before CapEx.

3) P-core upgrade into a low-firmware chassis

A 6787P lands in a chassis with old iDRAC. The box will not post. Service-manual minimums exist for a reason — put firmware gates on the RFQ when used or refreshed chassis are in play.

Frequently Asked Questions

Quick Answer: R670 is not a faster R660. DLC is CPU-SKU gated. Memory tops at 8 TB / 32 DIMMs. Mixed R670+R660 quotes need two option sets.

No. Different CPU generation and chassis options. R670 uses two Intel Xeon 6 CPUs; R660 is the previous 1U dual-socket Intel generation.

Only when the CPU SKU Dell marks requires DLC. Not every config.

Up to 8 TB across 32 DDR5 DIMMs, speed up to 6400 MT/s depending on the CPU.

Yes as two lines. No as one shared option set.

References

Quick Answer: Cite Dell’s R670 spec sheet, technical guide, processor manual, and product page so CPU, DIMM, and bay claims stay auditable.

Key Takeaway

Key Takeaway: Treat R670 as a new Xeon 6 platform. Pick E-core or P-core first, freeze DIMM speed and drive chassis next, and never share an R660 option set. BENQUAN supplies PowerEdge R670 with Worldwide Shipping after the brief is clean.

Not sure your R670 BOM is optimal?

If E-core vs P-core, DIMM speed, E3.S bays, or mixed R660 leftovers are unclear, click below for a free compatibility and delivery risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents