Quick Take
Quick Take: Which Dell list prices moved September 2026? SKU Lookup moved from catalog date 2026-08-19 (371,197 SKUs) to 2026-09-24 (370,385 SKUs). Net change is +6,303 / −7,115. LIST MoM is not one percentage: +12%, +11%, +14% and +7% clusters sit mostly on ProSupport. PowerEdge family rows are largely flat. Channel net stays pending confirmation.
Paste the open Dell BOM into Dell SKU Lookup and read MoM per line versus 19 August 2026. Then send a dated brief via rfq.html?intent=bom-risk.
What This Delta Is
Quick Answer: A Dell catalog delta is the SKU-set change plus LIST movement between two dated SKU Lookup indexes. This page compares 19 August 2026 with 24 September 2026. It is not a memory-only surcharge notice and not a how-to for unofficial discount paths.
Typical scene: a PowerEdge plus ProSupport pack was approved on last month’s printout. Someone now says “Dell went up twelve percent.” That sentence is how you overpay hardware and under-check support.
Definition: BENQUAN SKU Lookup is the live Dell part-number index with public Baseline LIST in USD. The catalog date on Lookup is the revision an RFQ should cite. The 24 September 2026 refresh is a mixed LIST revision plus SKU churn. Factory MOD fragments come and go. ProSupport lines move in bands. Most PowerEdge chassis LIST did not follow those bands.
- Fit this page: Open Dell BOMs still dated 2026-08-19; ProSupport / PPBS / data-protection support lines; anyone applying one percentage to the whole PO.
- Unfit: Readers who want one surcharge for every PowerEdge chassis. Use the PowerEdge memory hike for DIMM-only windows, and the official lower-price methods for program paths — not this index.
Start on Dell SKU Lookup and the Dell vendor hub.
Catalog Numbers: 371,197 to 370,385
Quick Answer: Previous public index: 2026-08-19, 371,197 Dell-branded SKUs. New public index: 2026-09-24, 370,385 SKUs. Added 6,303. Removed 7,115. Net −812. Public Lookup still shows Baseline LIST. Channel net is not that column.
| Metric | 19 Aug 2026 | 24 Sep 2026 |
|---|---|---|
| Catalog date on SKU Lookup | 2026-08-19 | 2026-09-24 |
| Public Dell-branded SKUs | 371,197 | 370,385 |
| Part numbers added | — | 6,303 |
| Part numbers removed | — | 7,115 |
| Net SKU change | — | −812 |
| Public LIST column | Yes (Baseline USD) | Yes |
| MoM baseline | — | vs 2026-08-19 |
Checked 14 October 2026 against the public index. A seller who only quotes “the catalog grew” is reading the wrong column: the SKU count went slightly down. What moved is mix and LIST on retained support codes.
Limitation: LIST on Lookup is Baseline, not the PO. Worldwide shipping and free-port stock stay pending confirmation until the dated RFQ names quantity, support years and site.
LIST Bands: +12%, +11%, +14%, +7% — Mostly ProSupport
Quick Answer: The four loudest up-bands are +12%, +11%, +14% and +7%. About four in five lines in the first three bands are ProSupport-series codes. PowerEdge family LIST is largely flat versus 19 August 2026.
Think of it like airfare versus the aircraft. The ticket class changed. The airframe sticker did not. If you apply the ticket move to the plane, the CapEx pack is fiction.
| LIST band vs 19 Aug | Approx. lines | What sits in the band |
|---|---|---|
| +12% | about 435–519 | ~81% ProSupport-ish (714- / 715- / 716- / 707-) |
| +11% | about 388–418 | ~84% ProSupport-ish, plus some Inspiron / client rows |
| +14% | about 320–381 | ~82% ProSupport Plus / 7×24 / accidental-damage rows |
| +13% | about 165–273 | ~75% ProSupport Flex client |
| +7% | about 379–678 | ~58% ProSupport-ish; rest includes Precision workstation bases |
| −1.1% | about 439 | mostly factory MOD fragments at tiny LIST |
On the PowerEdge family (18,604 rows in this index), 16,767 are flat versus 19 August. Only 25 show a LIST uptick above half a percent, and 3 show a drop. That is the sentence to forward with the pack: do not stamp +12% on the chassis.
Storage Mid Range support can move the other way. Sample ProSupport 4-hour and next-business-day codes such as 710-5639 sit near −9.5%. Client ProSupport up, storage ProSupport down — two corridors, one vendor name.
Among retained SKUs with a MoM value, 5,847 lines are up at least 3% and 1,917 are down at least 3%. Those counts prove movement exists. They do not license a single multiplier on a mixed BOM.
What Was Added: PPBS Month Slices and New Chassis Codes
Quick Answer: Of 6,303 adds, about 3,405 are ProSupport / services and 3,024 sit in Data Protection SW — largely month-sliced PPBS Entra ID Protection support codes. Hardware adds include PowerEdge R9825 (210-BWTY) and R9815 (210-BWWX).
| Bucket | Adds | What to do on an RFQ |
|---|---|---|
| ProSupport / services | 3,405 | Re-price support years. Example new DC rows: 707-6500 Restricted ProSupport One for Data Center 7×24. |
| Data Protection SW | 3,024 | Month-sliced PPBS Entra ID Protection ProSupport (729-0978 and neighbours). Match the month count; do not pick a random term. |
| Factory MOD / config fragments | 1,032 | Cables, labels, chassis kits. Churn, not an EOS wave. |
| PowerEdge Servers family | 272 | Includes 210-BWTY PowerEdge R9825, 210-BWWX R9815, 210-BXFQ R9815 Smart Value, plus IR racks. |
| Client notebooks / desktops | ~267 | Camera / PSU / rugged options. Attach only if the client BOM names them. |
| Storage midrange | tens | PowerStore GEN3 fan / PSU / BBU mods — FRU/config, not a new array family. |
The 7,115 removals versus the August snapshot are mostly config-fragment churn. This index does not prove those codes are end-of-sale. If a line misses Lookup, check spelling and factory MOD suffixes before you write EOS into the bid.
Representative new hardware codes (not a shopping list):
| SKU | Read |
|---|---|
210-BWTY | PowerEdge R9825 Server — new chassis code on this index |
210-BWWX | PowerEdge R9815 Server |
210-BXFQ | PowerEdge R9815 Smart Value |
210-BVGZ | Dell XC470 — HCI SKU, not a general-purpose R-series substitute |
729-0978 | 10 Months ProSupport PPBS Entra ID Protection Tier 3 — term is the SKU |
How to Re-Validate a Dell BOM on Catalog Date 2026-09-24
Quick Answer: Confirm the date, paste every line, split hardware from ProSupport, check R9825/R9815 if the design moved, then lock net on a dated RFQ. LIST on Lookup is not the PO.
- Confirm the catalog date. Open Dell SKU Lookup. You want 2026-09-24 and 370,385 Dell-branded SKUs. If the page still shows 19 August, hard-refresh. Do not argue from a screenshot taken in September.
- Paste every line. Hardware, cables, ProSupport, PPBS, data-protection support. Note MoM versus 19 August 2026 on retained SKUs. A blank MoM often means the code is new or was not in the August priced set.
- Split the pack. One column for PowerEdge / storage hardware. One for ProSupport. One for PPBS / Entra ID Protection month slices. Copying +12% from the support column into the hardware column is the expensive mistake.
- Check new chassis codes. If the design now names 16G-class boxes, confirm
210-BWTY(R9825) or210-BWWX(R9815). An old 16G SKU that still “looks right” may be a different orderable. - Lock a dated RFQ. Send the mapped BOM via rfq.html?intent=bom-risk with quantities, support years, region and delivery window. Channel net remains an industry estimate until that quote comes back.
Self-check: if your approval slide still says “Dell +12%” with no SKU column, it is not ready to forward.
Typical Scenes
Quick Answer: Three typical scenes — not named customers. A PowerEdge refresh pack, a ProSupport renewal, and a data-protection add-on all read this catalog differently.
- PowerEdge refresh still on August paper. Hardware LIST is mostly flat. Your risk is the support column and any chassis code that should now be
210-BWTYor210-BWWX. Re-run the BOM before the steering pack. - ProSupport renewal copied from last year’s SKUs. Client 7×24 / Flex rows are the +11% to +14% bands. Storage 4-hour rows can sit near −9.5%. Do not blend them into one uplift.
- PPBS / Entra ID Protection add-on. New month-sliced codes such as
729-0978(10 months) are not hardware. Matching the month count is the whole RFQ.
Common BOM Traps on This Revision
Quick Answer: The traps are one fake percentage, mixing client ProSupport up-bands with storage ProSupport down-bands, treating PPBS month codes as hardware, and calling config-fragment drops an EOS event.
| Trap | Why it bites | Fix |
|---|---|---|
| Stamp +12% on the chassis | That band is mostly ProSupport | Read MoM on the PowerEdge lines; most are flat |
| One multiplier for all support | Client ProSupport up; some storage ProSupport near −9.5% | Keep 714- and 710- families in separate columns |
| Pick a random PPBS month SKU | Adds include 3-month through 22-month Entra ID Protection rows | The month count is the part number |
| Treat −7,115 as EOS | Drops are largely factory MOD churn | Re-search the code; ask before writing end-of-sale |
| Use Lookup LIST as PO net | Baseline LIST ≠ channel net | Cite 2026-09-24, then RFQ; net pending confirmation |
FAQ
Yes. Dell SKU Lookup shows catalog date 2026-09-24 with 370,385 Dell-branded SKUs. The prior public index was 2026-08-19 with 371,197 SKUs. Cite 2026-09-24 on any RFQ you freeze this week.
No. The +12%, +11%, +14% and +13% LIST bands are mostly ProSupport part numbers in the 714-, 715-, 716- and 707- series. PowerEdge family rows are largely flat versus 19 August 2026. Stamp +12% on CPU, chassis and disks and you overstate the hardware.
Some Storage Mid Range ProSupport 4-hour and next-business-day rows moved about −9.5% versus 19 August 2026, for example 710-5639. That is the opposite direction from client ProSupport +11 to +14. Read MoM per line.
They are new orderable chassis codes on the 24 September 2026 index: 210-BWTY (PowerEdge R9825 Server) and 210-BWWX (PowerEdge R9815 Server), plus 210-BXFQ as R9815 Smart Value. Confirm the code your design actually named before you reuse an older 16G SKU.
No. Public Dell Lookup shows Baseline LIST in USD. Channel net is an industry estimate until a dated quote confirms it. Use Lookup to prove the code and the MoM direction, then lock net on the RFQ.
References
Quick Answer: Confirm platform and support names on Dell’s public pages. Counts and LIST bands above come from the dated public catalog on SKU Lookup, checked 14 October 2026. Channel net stays pending confirmation.
Numeric basis: public Dell index dated 2026-09-24 (370,385 SKUs) versus 2026-08-19 (371,197 SKUs). LIST direction uses Lookup MoM. Net and lead time remain industry estimate / pending confirmation until a dated quotation is issued.
Key Takeaway
Key Takeaway: Cite catalog date 2026-09-24. Do not stamp +12% on a PowerEdge chassis; that band is mostly ProSupport. Re-run PPBS month slices and confirm R9825/R9815 if the design moved. BENQUAN maps the dated BOM against SKU Lookup MoM versus 19 August 2026 and returns a worldwide RFQ with channel net pending confirmation.