Procurement / Analysis

DD9900 EDP vs Standard Encryption

Dell PowerProtect DD9900 EDP cannot enable DARE or OTW replication encryption. Compare standard vs EDP, confirm 94 TB/h DD Boost, and RFQ checks.

Quick Take

Quick Take: Two Dell PowerProtect DD9900 quotes can match on capacity and still differ on one point: whether encryption can ever be turned on. The EDP (Encryption Disablement Project) version cannot enable data-at-rest or over-the-wire replication encryption. The standard version can, with an Encryption licence. Public Dell sheets show no hardware capacity or speed gap between them.

Definition: EDP means Encryption Disablement Project. Dell's Data Domain Encryption FAQ (KB 000019875) states that data-at-rest encryption (DARE) is supported on Data Domain systems that are not part of EDP, and that DARE and over-the-wire encryption are not supported on EDP systems. This page is a buying note, not a compliance guide. Export rules for your destination still apply separately.

Where does the DD9900 sit in the PowerProtect DD line?

Quick Answer: The DD9900 is the high-end appliance in the PowerProtect DD series (Data Domain lineage). Dell's DD series datasheet lists usable active-tier capacity from 576 TB to 1.5 PB and DD Boost backup ingest up to 94 TB/hr. Optional high availability and Cloud Tier are available. Treat published figures as maxima, not sizing results for your workload.

The DD9900 is a purpose-built backup target for large enterprise environments. Figures below are taken from Dell PowerProtect DD Series Appliances datasheets (channel copies ©2021–©2023) and Dell's DD9900 hardware capacity table (DDOS / PowerProtect DD Hardware Features and Specifications).

Item DD9900 (official / Dell datasheet)
Usable capacity (active tier) 576 TB to 1.5 PB (max usable 1,536 TBu in Dell hardware table)
Logical capacity (active tier, up to ~65x) Up to 97.5 PB (datasheet estimate; workload-dependent)
Backup ingest with DD Boost Up to 94 TB/hr
Maximum throughput (non-Boost, older sheet) Up to 41 TB/hr
High availability Optional (DD9900 HA / active-passive)
Long-term retention Optional Cloud Tier
Protocols (family) NFS, CIFS, VTL, NDMP, DD Boost

Dell notes that actual capacity and throughput depend on application workload, deduplication ratio and other settings. Public material does not show any hardware capacity or performance difference between the EDP version and the standard version of the DD9900. Do not treat EDP as a "lite" or slower model. It is the same platform with encryption locked out.

Do not confuse the DD9900 with the newer PowerProtect Data Domain family models such as DD9910 / DD9910F. Those are separate chassis generations with different published ingest numbers (see next section).

Is DD Boost throughput 94 TB/h or 130 TB/h on a DD9900?

Quick Answer: For the DD9900, keep up to 94 TB/hr with DD Boost. The up-to-130 TB/hr figure belongs to Dell's newer DD9910 / DD9910F family on the 2026 PowerProtect Data Domain spec sheet — not the DD9900. Older or mixed quotes that paste 130 onto a DD9900 line are outdated for this model.

Model Max DD Boost ingest (published) Source used on this page
PowerProtect DD9900 Up to 94 TB/hr Dell PowerProtect DD Series Appliances datasheet (e.g. Arrow ©2021; BlueAlly ©2023 channel PDF)
PowerProtect Data Domain DD9910 / DD9910F Up to 130 TB/hr Dell PowerProtect Data Domain family spec sheet ©2026

Decision for this article: retain 94 TB/hr for DD9900; treat 130 TB/hr as the wrong model if applied to DD9900. Re-check Dell's current sheet for your exact SKU and DDOS level before you size a window.

What is the EDP version (Encryption Disablement Project)?

Quick Answer: EDP stands for Encryption Disablement Project. Dell's Encryption FAQ says DARE is supported on all Data Domain systems except EDP systems, which do not allow encryption to be enabled. Dell also states that DARE and over-the-wire encryption are not supported on EDP systems. Encryption cannot be added later on an EDP unit.

In Dell's own wording, the EDP version is defined by what it cannot do:

  • No data-at-rest encryption (DARE). On a standard system, DARE is enabled by adding an Encryption licence and turning on file system encryption. On an EDP system this option is not supported.
  • No over-the-wire replication encryption. Standard systems can encrypt replication traffic between two Data Domain systems. Dell states this is not supported for EDP systems.

EDP versions are ordered under their own part numbers. A controller string such as DD9900-CTL-EDP appears in some third-party price lists. Those lists are not official Dell documents, so confirm any EDP part number against the Dell quotation or order record.

Do not confuse EDP with Extended Retention

Extended Retention is a different feature. It was a long-term retention tier on older Data Domain models. DDOS 7.0 and later do not support it, and Cloud Tier takes its place. Extended Retention has nothing to do with encryption. When a quotation or a used-equipment listing carries an "ER" or "EDP" label, find out which one it means before you compare prices or configurations.

How do the EDP version and the standard version compare?

Quick Answer: The two versions differ on encryption only: DARE, OTW replication encryption and key management are available on the standard version and not on the EDP version. Migration has a rule: EDP to EDP and non-EDP to non-EDP are supported. EDP to non-EDP needs MIGRATION_ENCRYPTION explicitly turned off.

Item Standard DD9900 DD9900 EDP version
Data-at-rest encryption (DARE) Available with an Encryption licence Not supported; encryption cannot be enabled
Algorithms AES 128-bit or 256-bit, CBC or GCM modes Not applicable
Over-the-wire (OTW) replication encryption Supported Not supported
Key management Embedded Key Manager included with the Encryption licence; external KMIP key managers supported Not applicable (no encryption)
Data migration Non-EDP to non-EDP supported (encryption settings must match) EDP to EDP supported
EDP to non-EDP migration — Allowed only if OTW encryption is explicitly disabled with the MIGRATION_ENCRYPTION system parameter
Hardware capacity and performance Per DD9900 datasheet No difference shown in public sources

Notes on the standard version, from the same Dell FAQ:

  • The default algorithm is AES 256-bit in CBC mode. GCM adds authentication on top of confidentiality.
  • Dell names Gemalto KeySecure, Vormetric, CipherTrust and IBM GKLM as supported external key managers. Each needs a separate licence from the key manager vendor.
  • Encryption covers the whole system. It cannot be turned on for a single MTree or file. Cloud Tier and cloud units can have encryption set on their own.

Which version should you choose?

Quick Answer: If policy, audit or contract needs backup data encrypted at rest or in transit, choose the standard version and include the Encryption licence. Choose EDP only when you truly need a system where encryption cannot be enabled. Then confirm the exact EDP part number and licence set on the quotation in writing.

Choose the standard version when:

  • An internal policy, auditor or regulator needs backup data encrypted at rest.
  • Replication traffic between sites must be encrypted.
  • You plan to use an external key manager or to manage key rotation centrally.
  • The DD9900 will replicate with, or migrate to, existing non-EDP Data Domain systems.

Choose the EDP version when:

  • The project specifically needs a system that cannot enable encryption.
  • Every replication peer and future migration target is also an EDP system, or you have planned the EDP to non-EDP migration path (MIGRATION_ENCRYPTION turned off).

In both cases, check the exact SKU and licences in writing. A DD9900 line on a quotation without "EDP" or a matching licence list does not tell you which version you are buying.

Illustrative use case (not a real customer): a buyer orders a DD9900 to replicate with an existing standard Data Domain at a second site and plans to encrypt replication. If the unit delivered is an EDP version, OTW encryption cannot be enabled on it. The design has to change after delivery. Catching the version at the quotation stage avoids that.

What should you check before you order a DD9900?

Quick Answer: Confirm four things in writing: whether the quoted unit is EDP or standard, whether every replication peer is the same type, which support part numbers go with that version, and that no line has mixed EDP with Extended Retention. Also freeze usable TB and DD Boost expectations against the DD9900 sheet, not a DD9910 sheet.

DD9900 procurement checklist

  1. Is the quote EDP or standard? Ask the supplier to state it on the quotation and to list the controller part number (for example, whether it carries an -EDP suffix).
  2. Is the Encryption licence included (standard version only)? DARE needs an Encryption licence. External key managers need a separate licence from their vendor.
  3. Is the replication peer the same type? Check whether each source and target system is EDP or non-EDP, especially if you plan to encrypt replication or migrate data later.
  4. Is there a migration plan? EDP to EDP and non-EDP to non-EDP are supported. EDP to non-EDP needs MIGRATION_ENCRYPTION explicitly disabled.
  5. Do the support part numbers match? Check that the maintenance or support part numbers match the hardware version and the capacity on the same BOM.
  6. Is EDP mixed up with Extended Retention? "ER" means Extended Retention, a legacy tier that DDOS 7.0+ does not support (use Cloud Tier). It is not EDP.
  7. Are options listed as separate lines? HA, Cloud Tier, DD Boost and capacity expansion should each have their own line.
  8. Is the ingest figure for the correct model? DD9900 = up to 94 TB/hr DD Boost. Do not accept a pasted 130 TB/hr figure unless the chassis is actually a DD9910 / DD9910F.

What to put on the RFQ

  • Model (DD9900 or DD9900 HA), the usable capacity you need, and whether you need Cloud Tier
  • Version: EDP or standard, plus whether you need the Encryption licence
  • Replication peers and their versions (EDP or non-EDP)
  • Any plan to migrate from or to another Data Domain system
  • Support term and level you need
  • Destination country and required delivery date

Who is this for, and who is it not for?

Quick Answer: It suits buyers comparing two DD9900 quotes that look identical on capacity, teams that must encrypt backup data at rest or on replication links, and RFQ writers who need an EDP versus standard checklist. It is not for readers seeking prices, invented part numbers, or DD9910 sizing pasted onto a DD9900 line.

Useful for:

  • Procurement and backup architects who must pick standard versus EDP before PO
  • Teams migrating between Data Domain systems and needing the MIGRATION_ENCRYPTION rule
  • Buyers reconciling conflicting DD Boost ingest numbers on mixed sheets

Not for:

  • Anyone expecting list prices or lead times on this page
  • Readers who need a DD9910 / DD9910F BOM (see the related DD9910 RFQ article)
  • Compliance counsel seeking a full export-control opinion — check that separately for your transaction

Frequently Asked Questions

EDP stands for Encryption Disablement Project. Dell describes EDP systems as Data Domain systems that do not allow encryption to be enabled. DARE and over-the-wire encryption are not supported on them.

No. Dell's encryption FAQ states that EDP systems do not allow encryption to be enabled, and that DARE and over-the-wire encryption are not supported on them. If you may need encryption in the future, order the standard version.

Public sources do not show any hardware capacity or performance difference. The documented difference is that encryption cannot be used. Dell's datasheet lists 576 TB to 1.5 PB usable and up to 94 TB/hr with DD Boost for the DD9900.

That figure is published for Dell's newer PowerProtect Data Domain DD9910 / DD9910F family (Dell family spec sheet ©2026), not for the DD9900. For DD9900 keep up to 94 TB/hr DD Boost from the DD series datasheet.

With an Encryption licence, the standard version supports data-at-rest encryption with AES 128-bit or 256-bit in CBC or GCM mode. Keys can be handled by the Embedded Key Manager or a supported external KMIP key manager. Over-the-wire replication encryption is also supported.

Migration is supported between two EDP systems or between two non-EDP systems. From an EDP system to a non-EDP system, Dell allows migration only if OTW encryption is explicitly disabled with the MIGRATION_ENCRYPTION system parameter.

No. Extended Retention was a long-term retention tier on older Data Domain models. DDOS 7.0 and later do not support it, and Cloud Tier replaces it. It has nothing to do with encryption.

Ask for the controller and licence part numbers in writing. EDP versions have their own part numbers, for example DD9900-CTL-EDP as listed in some third-party (non-official) price lists. Confirm the part number against the Dell quotation.

No. It covers version differences and procurement checks only. BENQUAN confirms pricing separately for each quotation.

Key Takeaway

Key Takeaway: On a DD9900, "EDP" decides whether encryption can ever be enabled. It does not decide capacity or speed. Keep DD Boost at up to 94 TB/hr for DD9900; 130 TB/hr is the newer DD9910 family. Choose standard if you need encryption; choose EDP only when encryption must stay off, and confirm SKU, licences and peers in writing.

References

Quick Answer: Encryption, replication and migration facts come from Dell's Data Domain Encryption FAQ (KB 000019875). DD9900 capacity and 94 TB/hr DD Boost come from Dell PowerProtect DD Series datasheets. The 130 TB/hr figure is from Dell's 2026 Data Domain family sheet for DD9910 / DD9910F. Re-check current Dell documents for your DDOS level before you rely on them.

Request a quote

Send the model (DD9900 or DD9900 HA), whether the line is EDP or standard, usable capacity, Cloud Tier yes/no, Encryption licence yes/no, replication peer types, and destination country. We will return a matched quotation against confirmed, orderable part numbers.

Free Compatibility & Delivery Risk Assessment

BENQUAN GLOBAL LIMITED is a Dell Partner and supplies Dell PowerProtect DD9900 appliances sourced through authorized channels at competitive pricing; every price is confirmed only in a written quotation.

Email an RFQ to info@benquan.hk · RFQ form · SKU Lookup

All prices are by written quotation only; any figure not confirmed in writing is an industry estimate, pending confirmation.

Or call +852-21349834 · info@benquan.hk

Contents