Quick Take
Quick Take: Brocade Gen 8 is Broadcom's 128G family launched 19 November 2025: G820 (24 to 56), X8-4 (192), and X8-8 (384) on Fabric OS 10.0.x. Dell, HPE, IBM, Lenovo, Hitachi, and TGStor are ordering paths. The hero alias is the G820 Dell OEM 24-port kit with 24×64G optics; do not mix it with TGStor G820.
What Brocade Gen 8 Is
Quick Answer: Brocade Gen 8 is the 128G ASIC generation, not a Dell nickname. It needs Fabric OS 10.0.x, auto-negotiates 128/64/32/16G per optic, and publishes 580 ns local latency at 128G with dual FEC. Directors add 1.74 μs blade-to-blade. Dell through TGStor are ordering paths for the same ASIC.
Definition: Brocade Gen 8 is a Fibre Channel hardware generation — not an Ethernet IP-SAN appliance, and not a Gen 7 64G refresh wearing a new nickname. Broadcom launched the first 128G platforms, the G820 fixed switch and both X8 directors, on 19 November 2025. Dell Connectrix, HPE B-series, IBM b-type, Lenovo ThinkSystem, Hitachi Vantara, and TGStor publish product names for that same ASIC; they are ordering paths, not a second product line. Fabric OS 10.0.x is the software train that supports the official Gen 8 hardware list (Broadcom admin guide, last updated 2026-06-25). Confirm the exact 10.0.x train on the quote; do not assume every 10.x build is already qualified for your topology. Line rates on the X8 product brief are 112.2 / 57.8 / 28.05 / 14.025 Gb/s full duplex, with auto-negotiation 128/64/32/16G per SFP. Local switching latency is 580 ns at 128G with dual FEC. Director blade-to-blade latency is 1.74 μs. Those figures are vendor-published; they are not a promise that every host HBA already speaks 128G.
Shared software pillars on official Gen 8 platforms (vendor language from the Broadcom X8 brief dated 19 November 2025, with OEM sheets as confirmation of the same ASIC):
- Quantum-resistant security: vendor “quantum-safe” wording covers 256-bit encryption, post-quantum (PQC) algorithms, AES-GCM-256 on FC ISLs (E_Port), Secure Boot, FIPS 140-3, TLS 1.3, TruFOS, and least-privilege RBAC. Treat “quantum-safe” as vendor language, not a third-party certification name on the PO.
- SAN AI / SAN FI: embedded SAN AI, SAN Fabric Intelligence, Adaptive Traffic Optimizer, MAPS, Fabric Vision, IO Insight (SCSI + NVMe), and VM Insight. Do not write “no operator needed” on the RFQ.
- HA signaling: dual FEC, congestion signaling, FPIN, DPS, and nondisruptive firmware on qualified topologies. Directors cite 99.999 percent design availability; the G820 page cites 99.9999 percent — both are vendor claims.
- Management: SANnav Portal + Global View, Web Tools, CLI, REST, SNMP, BSL / ASC. Line-item SANnav seats. Switch software features are typically included on OEM kits; still quote support and TruFOS.
Optics rule that buyers miss: 128G SFP+ SWL auto-negotiates 128/64/32; 64G SFP+ SWL/LWL/ELWL auto-negotiates 64/32/16. The hero G820 Dell OEM kit ships 64G transceivers. A 128G-capable chassis with 64G media is a 64G link until you swap optics and confirm the peer. OEM shipping followed launch by the next couple of quarters; confirm ATP on the dated quote.
Official Gen 8 Hardware Map
Quick Answer: Three Broadcom platforms are official Gen 8: G820 at 24 to 56 SFP+, X8-4 at 192 plus eight OSFP ICL, and X8-8 at 384 plus sixteen ICL. FC128-48 fills director slots. Dell through TGStor columns are aliases. Empty X8 boxes ship CP and CR only.
SANnav Global View 3.0.0x lists Gen 8 as G820 + X8-4 + X8-8 only. That is the buyer-safe inventory. Directors ship control-processor blades in active/standby with USB plus 1/10GbE management per CP. Port blades, ICL optics, 3000 W power supplies, fans, and airflow kits are separate RFQ lines. Empty-chassis stickers are not a fabric. The table below is Broadcom-first; OEM columns are aliases, not extra products. DS-8820B and TGStor G820 cannot share one PO.
| Class | Broadcom | Dell | HPE | IBM MTM | Lenovo | Hitachi / channel | TGStor |
|---|---|---|---|---|---|---|---|
| Fixed 1U | G820 | DS-8820B | SN6800B | SAN56B-8 8634-F56 | ThinkSystem DB820S 7DMA | HD-G820-* | TGStor G820 |
| Director 9U | X8-4 | ED-DCX8-4B | SN8800B 4-slot S7U31A | SAN256B-8 8635-F84 | ThinkSystem X8-4 7DMBCTO1WW | HD-X84-0002-Z.P | TGStor X8-4 |
| Director 14U | X8-8 | ED-DCX8-8B | SN8800B 8-slot S7U30A | SAN512B-8 8635-F88 | ThinkSystem X8-8 7DMBCTO2WW | HD-X88-0002-Z.P | TGStor X8-8 |
| Port blade | FC128-48 | Connectrix FC128-48 | S7U40A / 41A / 42A | pending sales manual | 4C57B07468 / 69 / 70 | BR-X8-1148 / 2148 / 3148.P | order on the TGStor X8 path |
| ICL | ICLX8-4 / ICLX8-8 | same names | S7U48A–51A + S7U44A/45A | pending | 4C57B07487–89 / 07518 | BR-X8{4,8}ICLKIT-* | order on the TGStor X8 path |
| Control | CP A/S | in chassis | in SN8800B chassis | in chassis | in 7DMB chassis | 2 CP in HD-X8*-0002 | in TGStor X8-4 / X8-8 chassis |
Port and speed envelopes (Broadcom numbers): G820 scales 24 → 56 × 128G SFP+. X8-4 reaches 192 × 128G plus 8 UltraScale ICL (64 interconnect). X8-8 reaches 384 × 128G plus 16 UltraScale ICL (128 interconnect). FC128-48 presents 48 × 128/64/32/16G; ports 24–47 are AnyIO (Ethernet). USF / AnyIO is a director + FC128-48 feature and does not exist on G820. Ports 0–23 stay Fibre Channel. Ports 24–47 can become Ethernet in an IPS logical switch; a 128G SWL SFP+ can carry 100/50/25/10GbE, and a 64G SWL SFP+ supports 25/10GbE. Jumbo frames are 9k on IPS. Using AnyIO as Ethernet reduces the Fibre Channel count on that blade. FICON (Logical Switch, CUP, cascading) is an X8 path — do not promise FICON on G820 unless a dated quote says so.
Not Gen 8 — Adjacent Platforms
Quick Answer: G710, G720, G730, X7-4, X7-8, and the 7850 extension switch remain Gen 7 even when Fabric OS 10.x can manage them. HPE SN8700B R6A97A and R6A98A are the X7 contrast. IBM 8961 and 8969 are Gen 7 machine types. No public G810, G830, DS-8810B, or DS-8830B exists as of 27 August 2026.
The expensive alias on a 2026 RFQ is calling every current Brocade box “Gen 8.” Fabric OS 10.x can still manage older hardware. That does not change the generation stamped on the chassis. Use the adjacent table as a contrast column, not as a Gen 8 shopping list.
- G710 / G720 / G730 → Dell DS-7710B / DS-7720B / DS-7730B; HPE older B-series (Gen 7, 64G).
- X7-4 / X7-8 → ED-DCX7-4B / ED-DCX7-8B; HPE SN8700B
R6A97A/R6A98A(Gen 7). - 7850 extension → Dell MP-7850B (Gen 7; still supported on FOS 10.x — still not Gen 8).
- 7810 / MP-7810B (Gen 6).
- There is no public G810 / G830 / DS-8810B / DS-8830B as of 2026-08-27. Do not invent them to fill a 1U density gap.
| Model (contrast only) | Peer | Scale | Sheet bandwidth | Example (not Gen 8) |
|---|---|---|---|---|
| DS-7710B | G710 | 8 → 24 | 3.072 Tb/s | 210-BNXX / BNXY |
| DS-7720B | G720 | 24 → 64 (SFP-DD) | 4.096 Tb/s | 210-AZLV / AZLW / AZLT / AZLU |
| DS-7730B | G730 | 48 → 128 | 8.192 Tb/s | 210-BELU / BELT |
| SN8700B | X7 | director | Gen 7 sheet | R6A97A / R6A98A |
| IBM SAN64B-7 / SAN256B-7 / SAN512B-7 | G720 / X7 | Gen 7 | Gen 7 sheet | 8969-P64/R64 · 8961-F74 · 8961-F78 |
Numbers above come from the Dell 64G switch sheet, Rev July 2025, plus HPE and IBM contrast SKUs. Marketing Tbps that disagree with those sheets stay industry estimate / pending confirmation. Do not copy Gen 7 210-AZLV onto a Gen 8 DS-8820B line. Do not mix IBM 8634/8635 onto a 8961/8969 PO without stating generation. If you need more than 56 ports in one fixed box and you refuse a director, the honest adjacent SKU is G730 / DS-7730B (Gen 7, 128 ports) — write the generation on the RFQ so receiving does not treat it as a missing G830.
X8 Director Numbers — X8-4 and X8-8
Quick Answer: X8-4 is a 9U chassis with four port-blade slots, 192 Fibre Channel ports, 31 Tb/s, and eight OSFP ICL. X8-8 is 14U with eight slots, 384 ports, 62 Tb/s, and sixteen ICL. Quote four or six 3000 W supplies, matching NPI or NPE fans, and OSFP-to-2×QSFP breakout when ICL meets Gen 7.
Directors are the modular core of Brocade Gen 8. The chassis you receive is CP plus core routing only. Every FC128-48, every ICL optic, every 3000 W supply, and every fan tray is a line you can forget — and the fabric will not light. Slot bandwidth to each FC128-48 is 6144 Gb/s line-rate on both chassis. Certified active devices are 6000 per switch. Operating envelope is 0–40°C, 5–93 percent RH, altitude 3000 m. Empty weight is 86.4 lb (X8-4) or 99.6 lb (X8-8); full weight is 183.9 lb or 257.5 lb. Depth × width is 68.7 × 44.2 cm on both frames.
| Dimension | X8-4 | X8-8 |
|---|---|---|
| Height | 9U (39.6 cm); 10 blade slots | 14U (61.8 cm); 14 blade slots |
| Port-blade slots | 4 | 8 |
| Max FC | 192 @ 128G | 384 @ 128G |
| ICL ports | 8 OSFP → 64 interconnect | 16 OSFP → 128 interconnect |
| Chassis bandwidth | 31 Tb/s (4× FC128-48 + ICL) | 62 Tb/s (8× + ICL) |
| Max AnyIO Ethernet | 96 × 100GbE | 192 × 100GbE |
| Latency | Local 580 ns @ 128G; blade-to-blade 1.74 μs | same |
| PSU for N+N | 4 × 3000 W | 6 × 3000 W |
| PSU derate | 85–132 VAC → 1500 W; 180–264 VAC → 3000 W; 80 PLUS Titanium | same |
| Fans | 3 trays × 2 fans = 6; need 5/6 | 3 trays × 4 fans = 12; need 11/12 |
| Airflow | NPI or NPE; PSU and fans must match | same |
| Power typical / max (200 VAC, full + ICL) | 1946 / 3571 W; 6641 / 12190 Btu/hr | 4000 / 7233 W; 13652 / 24687 Btu/hr |
| Availability design | 99.999 percent (vendor) | same |
ICL cabling: Gen 8 ICL is OSFP MMF MPO-16 at 100 m or OSFP SMF dual LC at 2 km. Gen 8 ICL to Gen 7 ICL needs a qualified OSFP-to-2×QSFP breakout (Brocade High-Density Cabling Design Guide). UltraScale ICL can connect up to 12 Gen 7 or Gen 8 directors; full mesh up to 9 chassis; up to 4608 FC ports in a multi-chassis domain. Vendor cabling-reduction claim is 87.5 percent; ICL frees up to 33 percent more device ports — both are vendor claims. ICL trunking uses color-coded OSFP groups; put at least two OSFPs in a trunk group to the peer pair (eight trunks of two ports), add OSFPs in pairs, and span both ICL blades. FC128-48 detail: 48 front-end 128G SFP+ and 48 backplane links to the core routing complex. The blade supports in-flight encrypt/decrypt and compress/decompress on a port basis. Optics SKUs differ by OEM — never copy Lenovo P/Ns onto a Dell or HPE RFQ.
G820 Hero RFQ Kit — Dell OEM Alias
Quick Answer: The hero string is a G820 Dell OEM kit: Connectrix DS-8820B 24/56P front-to-rear with 24×64Gb SFPs and rails. Base ports are 24; four 8-port PoD licenses reach 56. Sheet bandwidth is 7.168 Tb/s. Those 64G optics do not light 128G links, and 24/56 is not the Gen 7 G720 24/64 SFP-DD scale.
Buyer-facing string to freeze on the RFQ, written as a G820 Dell OEM 24-port / 64G optic kit: Connectrix DS-8820B 24/56P switch w/front-to-rear airflow (includes 24×64Gb SFPs and rack mount kit). That is a 1U edge / ToR role, 44.00 × 4.37 × 39.68 cm. Ports are 56 × 128G SFP+ (E/F/N/M/D/EX). Access Gateway mode is 56 F + 8 N. Scale math is 24 base plus four × 8-port SFP+ PoD to 56. There is no SFP-DD on this box. It is not 64 ports. Sheet bandwidth is 7.168 Tb/s. Buffers are 40K. ISL trunking is up to 8 SFP+ and up to 1024 Gb/s per trunk. Certified fabric: 4K nodes, 56 switches, 19 hops, fabric max 239.
Airflow is the second SKU, not a note. FTR is front-to-back / non-port-side exhaust (NPE). RTF is non-port-side intake (NPI). Power enters from the rear. Dual hot-swap PSU. G820 page power is 478 W — confirm on the quote (pending confirmation if the quote disagrees). Weight is 8.39 kg without transceivers and 9.48 kg fully populated. Latency matches the family: 580 ns at 128G with dual FEC. Dell public spec sheets do not list a 210-xxxx for DS-8820B. Order by marketing name + airflow + optics. Do not invent a Dell part number.
- Start with 24 ports + 24×64G SFPs + FTR + rails (the hero alias).
- Add 0–4 × 8-port PoD plus matching SFP+ for every newly lit port.
- Duplicate Fabric A / Fabric B with the same airflow.
- If one box must exceed 56 ports, step to G730 / DS-7730B (Gen 7, 128 ports) or an X8 director and write the generation on the line.
RFQ traps that show up on receiving docks: 24/56P ≠ G720 / DS-7720B 24/64P; 24×64G optics ≠ 128G links; PoD ports need extra SFPs that are not in the hero kit; FTR versus RTF must match the aisle. Soft unit prices remain industry estimate / pending confirmation. Freeze the equal-BOM brief within 2 business days of design lock and hold critical SFP ATP for at least 5 days of staging risk before cutover.
Comparison — G820 vs Both X8 Directors vs G720
Quick Answer: Put G820 beside both X8 chassis and the Gen 7 G720 on ports, bandwidth, ICL, AnyIO, and airflow. Directors win modular scale and Unified Storage Fabric. G820 wins 1U edge density. G720 stays a 64G contrast column. The honest 1U limit is 56 ports; an empty director quote is not a working fabric.
Equal assumptions: dual fabric, support years written, optics counted per lit port, generation labeled on every column, and one OEM path per purchase order. Soft stickers stay industry estimate / pending confirmation. The Gen 8 route limitation is honest: one 1U box stops at 56 ports, AnyIO lives only on directors, and a 64G-populated hero kit does not deliver 128G links. Versus Cisco MDS, this page is the Brocade column — peer MDS on the same port floor if the estate is dual-vendor.
| Dimension | G820 | X8-4 | X8-8 | G720 (Gen 7) |
|---|---|---|---|---|
| Generation | Gen 8 / 128G | Gen 8 / 128G | Gen 8 / 128G | Gen 7 / 64G |
| Form | 1U fixed | 9U director | 14U director | 1U fixed |
| Port scale | 24 → 56 (4×8 PoD, no SFP-DD) | 192 @ 128G | 384 @ 128G | 24 → 64 (SFP-DD) |
| Sheet bandwidth | 7.168 Tb/s | 31 Tb/s | 62 Tb/s | 4.096 Tb/s |
| ICL | None | 8 OSFP | 16 OSFP | None |
| AnyIO / USF | No | 96 × 100GbE | 192 × 100GbE | No |
| Latency | 580 ns @ 128G | 580 ns local / 1.74 μs blade | same | Gen 7 64G sheet (not 128G) |
| Dell alias | DS-8820B | ED-DCX8-4B | ED-DCX8-8B | DS-7720B |
| HPE alias | SN6800B | SN8800B S7U31A | SN8800B S7U30A | older B-series |
| Hero trap | 64G SFPs on 128G ports | Chassis-only quote | Chassis-only quote | Calling 24/64 a 24/56 |
Limitation of the Gen 8 1U route: if the design needs more than 56 ports in one fixed chassis, G820 is the wrong box. Step to X8 or keep a Gen 7 G730 column. Do not invent G830 or DS-8830B to close the gap. Limitation of the director route: empty X8 chassis plus hope is not a fabric — blades, ICL, 3000 W PSU count, and airflow kits decide whether the 31 Tb/s or 62 Tb/s envelope is real. Limitation of a mixed-OEM quote: a Broadcom HD- line next to an HPE S7U line is two purchase orders pretending to be one.
OEM Ordering Appendix — One Vendor per PO
Quick Answer: Freeze one OEM path per purchase order, then copy only that vendor's part numbers. Broadcom and Hitachi share the HD- and BR- list. Dell uses marketing names for DS-8820B. HPE uses S7U SKUs. IBM publishes 8634/8635. Lenovo uses 7DMA and 7DMB. TGStor is product names only — no TG- dump.
Brocade Gen 8 is one ASIC family. The PO is not. S7U34A is not DS-8820B, is not 8634-F56, is not 7DMACTO3WW, and is not HD-G820-24-64G-F-Z.P. DS-8820B and TGStor G820 cannot share one PO. Copy the table that matches the storage contract and leave the other tables on the shelf. Three items stay pending official paper and must not be guessed: Dell 210-xxxx for DS-8820B / ED-DCX8 (not on public spec sheets), IBM reseller feature codes such as 2693 (pending the official sales manual), and the HPE SN6800B 8-port POD SKU (store confirms four kits; the part number is pending official SN6800B QuickSpecs — do not invent a stand-in). HPE platform names are verified: G820 = SN6800B; X8 = SN8800B. Hitachi catalog reuses Broadcom channel P/Ns from the Hitachi Vantara Brocade Quick Reference Guide (BC-0590EN, December 2025).
Broadcom channel / Hitachi Vantara
Same HD- / BR- / XBR- list. G820 and X8 empty-chassis kits below include 36 months support. Power cords are not in the X8 chassis box. Rails XBR-R000296.P ship with HD-G820; mid-mount is XBR-R000294.P.
| Role | SKU | What it is |
|---|---|---|
| G820 base (24 ports) | ||
| G820 64G NPE | HD-G820-24-64G-F-Z.P | 24P, 64G SWL SEC, AC, NPE |
| G820 64G NPI | HD-G820-24-64G-R-Z.P | 24P, 64G SWL SEC, AC, NPI |
| G820 128G NPE | HD-G820-24-128G-F-Z.P | 24P, 128G SWL SEC, AC, NPE |
| G820 128G NPI | HD-G820-24-128G-R-Z.P | 24P, 128G SWL SEC, AC, NPI |
| G820 PoD (max 4 → 56 ports) | ||
| 8-port + 64G | XBR-MIDR8G8POD-64G.P | 8-port + 8×64G SWL Secure |
| 8-port + 128G | XBR-MIDR8G8POD-128G.P | 8-port + 8×128G SWL Secure |
| X8 empty chassis (0 PSU / 0 FAN / 2 CP / 2 CORE / 0 ICL / 0 ports) | ||
| X8-8 chassis | HD-X88-0002-Z.P | Buy 3 fans + 6 PSU, matching airflow |
| X8-4 chassis | HD-X84-0002-Z.P | Buy 3 fans + 4 PSU, matching airflow |
| FC128-48 blades | ||
| 48×64G SW | BR-X8-1148.P | 48×64G SWL |
| 48×128G SW | BR-X8-2148.P | 48×128G SWL |
| 48×64G LW | BR-X8-3148.P | 48×64G LWL |
| ICL kits (36 months support) | ||
| X8-8 100 m | BR-X88ICLKIT-100M-01-Z.P | 2 blades, 8 Gen 8 ICL OSFP |
| X8-8 2 km | BR-X88ICLKIT-2KM-01-Z.P | 2 blades, 8 Gen 8 ICL OSFP |
| X8-4 100 m | BR-X84ICLKIT-100M-01-Z.P | 2 blades, 4 Gen 8 ICL OSFP |
| X8-4 2 km | BR-X84ICLKIT-2KM-01-Z.P | 2 blades, 4 Gen 8 ICL OSFP |
| ICL upgrade 100 m | BR-X8ICLUPG-100M-01.P | 4 OSFP; max 2 on X8-8, max 1 on X8-4 |
| ICL upgrade 2 km | BR-X8ICLUPG-2KM-01.P | 4 OSFP; same qty caps |
| PSU / fans / optics | ||
| 3000 W NPI | BR-X8-RACNPIPSU-0104.P | 1× 3000W 240V |
| 3000 W NPE | BR-X8-RACNPEPSU-0104.P | 1× 3000W 240V |
| X8-8 fan NPI / NPE | BR-X88-FANNPI-0122.P / BR-X88-FANNPE-0122.P | Fan tray |
| X8-4 fan NPI / NPE | BR-X84-FANNPI-0122.P / BR-X84-FANNPE-0122.P | Fan tray |
| 128G SWL 1PK / 8PK | XBR-000500.P / XBR-000501.P | Secure SFP+ |
| Gen 8 ICL OSFP | XBR-000502.P / XBR-000503.P | SW / 2 km LW |
Dell Connectrix (marketing names only)
Public DS-8820B and ED-DCX8 spec sheets do not publish 210-xxxx for Gen 8. Order by marketing name + airflow + ship optics. Do not copy Gen 7 210-AZLV / 210-AZLW / 210-BELU onto a Gen 8 line.
| Broadcom | Dell marketing name | How to order |
|---|---|---|
| G820 | DS-8820B 24/56P | State FTR vs RTF + 24×64G or 24×128G + rails. Hero RFQ = FTR + 24×64G + rails. |
| X8-4 | ED-DCX8-4B | 9U / 192. Empty chassis = CP+CR only. |
| X8-8 | ED-DCX8-8B | 14U / 384. Empty chassis = CP+CR only. |
| FC128-48 | Connectrix FC128-48 | Separate line; optics SKUs are Dell-only. |
| Dell 210- code | pending confirmation | Not on public spec sheets as of 2026-08-27. |
HPE B-series
G820 = SN6800B. X8 = SN8800B. SN8700B R6A97A / R6A98A is Gen 7 contrast only. HPE Store confirms SN6800B scales 24→56 via four 8-port POD kits; the POD SKU is pending official SN6800B QuickSpecs.
| Role | SKU | What it is |
|---|---|---|
| SN6800B (G820) | ||
| 24P + 64G NPI | S7U32A | 24P + 64G SW + NPI |
| 24P + 64G NPE | S7U33A | 24P + 64G SW + NPE |
| 24P + 128G NPI | S7U34A | 24P + 128G SW + NPI |
| 24P + 128G NPE | S7U35A | 24P + 128G SW + NPE |
| 8-port POD | pending official SN6800B QuickSpecs | Four kits to 56 ports; do not guess a SKU |
| SN8800B chassis (no blades / ICL / PSU / fans / cords) | ||
| 8-slot (X8-8) | S7U30A | 14U empty chassis |
| 4-slot (X8-4) | S7U31A | 9U empty chassis |
| SN8800B blades (not SN8700B) | ||
| 48×64G SW | S7U40A | FC128-48 + 64G SW |
| 48×128G SW | S7U41A | FC128-48 + 128G SW |
| 48×64G LW | S7U42A | FC128-48 + 64G LW |
| ICL | ||
| 8-slot ICL SW / LW | S7U48A / S7U49A | Two blades, half-populated; LW is 2 km |
| 4-slot ICL SW / LW | S7U50A / S7U51A | Two blades, half-populated |
| ICL upgrade 4-pack | S7U44A / S7U45A | SW / LW |
| PSU / fans / optics | ||
| NPI PSU / 8-slot fan / 4-slot fan | S7U56A / S7U52A / S7U54A | Match airflow |
| NPE PSU / 8-slot fan / 4-slot fan | S7U57A / S7U53A / S7U55A | Match airflow |
| Qty | 8-slot = 6 PSU + 3 fan trays; 4-slot = 4 PSU + 3 fan trays | N+N |
| 128G optics 1-pack / 8-pack | S7U46A / S7U47A | HPE-only P/Ns |
| SN8700B (Gen 7 contrast) | R6A97A / R6A98A | X7 generation — not Gen 8 |
IBM b-type
Official matrix (modified 2026-02-26) gives Machine Type only. Public pages confirm 24→56 in 8-port PoD increments. Feature codes remain pending official IBM sales manual.
| Broadcom | IBM name | Machine type |
|---|---|---|
| G820 | SAN56B-8 | 8634-F56 |
| X8-4 | SAN256B-8 | 8635-F84 |
| X8-8 | SAN512B-8 | 8635-F88 |
| Blade / ICL feature codes | pending official sales manual | Do not invent codes such as 2693 |
Lenovo ThinkSystem
G820 = ThinkSystem DB820S (machine type 7DMA). Directors = ThinkSystem X8-4 / X8-8 (7DMB). No power cords in the G820 box. Director CTO frames ship CP+CR+rails only.
| Role | SKU | What it is |
|---|---|---|
| DB820S (G820) | ||
| NPE + 24×64G | 7DMACTO1WW | 7DMAA000WW / CB93 |
| NPE + 24×128G | 7DMACTO2WW | 7DMAA001WW / CB95 |
| NPI + 24×64G | 7DMACTO3WW | 7DMAA002WW / CB92 |
| NPI + 24×128G | 7DMACTO4WW | 7DMAA003WW / CB94 |
| PoD 8×64G / 8×128G | 4XF7B07567 / 4XF7B07568 | Max 4 kits; CBUH / CBUT |
| X8 directors | ||
| X8-4 9U | 7DMBCTO1WW | CP+CR+rails; no blades / ICL / PSU / fans / cords |
| X8-8 14U | 7DMBCTO2WW | Same exclusions |
| Blades 64G SW / 128G SW / 64G LW | 4C57B07468 / 4C57B07469 / 4C57B07470 | CBUQ / CBUP / CBUN |
| ICL X8-4 100 m / 2 km | 4C57B07487 / 4C57B07488 | CBUE / CBUD |
| ICL X8-8 100 m / 2 km | 4C57B07489 / 4C57B07518 | CBUC / CBUB |
TGStor (product names only)
TGStor G820, TGStor X8-4, and TGStor X8-8 sit on the same OEM map as Dell DS-8820B / ED-DCX8. Do not paste TG- MPNs here. Search part numbers on SKU Lookup (TGStor). DS-8820B and TGStor G820 cannot share one PO. TGStor is a channel product path, not Huawei SNS, and is not a legal “official Broadcom authorized OEM” claim.
Fit / Unfit Decision Boundary
Quick Answer: Choose Gen 8 when the estate starts 128G on Fabric OS 10.0.x and can take a G820 edge or an X8 core on one OEM contract. Skip it when you need more than 56 ports in one 1U box without a director, or when the quote mixes S7U, 8634, and HD- lines on one PO.
Fit Brocade Gen 8
- FOS estates that are starting 128G and can run Fabric OS 10.0.x on the new hardware.
- 1U edge / ToR with G820 24/56, or modular core with X8-4 / X8-8.
- 64G optics now, 128G optics later, with the speed rule written on the RFQ.
- USF / IP storage on director AnyIO ports, or FICON on X8, with dual-fabric A/B.
- OEM path matches the storage contract (Dell Connectrix / HPE B-series / IBM b-type / Lenovo ThinkSystem / Hitachi / TGStor / Broadcom channel).
Unfit
- Need more than 56 ports in one fixed box and refuse both a director and G730.
- Cisco NX-OS-only operations with no FOS runbook.
- Gen 8 ICL to Gen 7 ICL without a qualified OSFP-to-2×QSFP breakout on the BOM.
- Calling 7850 / SN8700B “Gen 8,” inventing G830 / DS-8830B, or promising 128G on a 64G-SFP kit.
- Mixing OEM SKUs on one PO, putting
DS-8820Band TGStor G820 on the same PO, guessing Dell 210- codes, inventing IBM feature codes, or guessing the HPE SN6800B POD SKU.
RFQ How-To Steps
Quick Answer: Write the generation first, then pick one OEM — Dell, HPE, IBM, Lenovo, Hitachi, or TGStor — and one form. Do not mix DS-8820B with TGStor G820. Lock airflow, count 64G versus 128G optics, add director extras, and mirror Fabric A and Fabric B. Soft prices stay industry estimate / pending confirmation.
- Step 1 — Freeze generation. Write Gen 8 (128G, Fabric OS 10.0.x) or Gen 7 (64G) on the first line. Do not let “current Brocade” stand in for a generation.
- Step 2 — Freeze OEM path, then form factor. Pick Broadcom/Hitachi, Dell, HPE, IBM, Lenovo, or TGStor — one vendor per PO. Then choose G820 24/56 for 1U edge, X8-4 for 9U / 192 ports, or X8-8 for 14U / 384 ports. Do not put
DS-8820Band TGStor G820 on the same PO. - Step 3 — Lock airflow. FTR or RTF on the 1U kit; NPI or NPE on director PSU and fans. Mismatched kits fail receiving.
- Step 4 — Line-item optics. 64G versus 128G SFP+ per lit port. Add PoD SFPs on G820 or FC128-48 quantity on directors. Use that OEM’s P/Ns only.
- Step 5 — Add director extras. CP/CR ship in chassis. Add blades, ICL OSFP, 4× or 6× 3000 W (3 kW) PSU, rails, SANnav, TruFOS, and support years.
- Step 6 — Duplicate dual fabric. Mirror Fabric A and Fabric B with identical airflow and optic counts.
- Step 7 — Peer a second column. Cisco MDS on the same port floor, optic plan, and HA assumptions if the estate is dual-vendor.
- Step 8 — Label soft prices. Channel corridors = industry estimate / pending confirmation. Submit on rfq.html?intent=bom-risk before CapEx freeze.
Common RFQ Pitfalls
Quick Answer: The costly mixes are S7U34A on a Dell line, 8634-F56 next to HD-G820, and a guessed HPE POD SKU. Other rejects include treating 24/56 as 24/64, shipping 64G optics as 128G links, omitting PoD SFPs, mixing FTR with RTF, promising AnyIO on G820, and quoting an X8 as chassis-only.
- Mixed OEM PO: HPE S7U, IBM 8634, Lenovo 7DMA, Hitachi HD-, and TGStor G820 lines are different catalogs. One vendor per order.
DS-8820Band TGStor G820 cannot share one PO. - Guessed pending SKUs: Dell 210- for DS-8820B, IBM feature codes, and the HPE SN6800B POD part number are not public. Leave them pending.
- 24/56 versus 24/64: different generations, different media (SFP+ PoD versus SFP-DD), different receiving checks.
- 64G kit, 128G story: the hero Dell OEM alias includes 24×64G SFPs. Write the link speed you will actually run on day one.
- PoD without optics: four 8-port licenses do nothing until matching SFP+ arrive.
- Airflow mix: FTR/RTF on the 1U pair, or NPI fans with NPE PSU on an X8, is a dock reject.
- AnyIO on the edge box: USF is directors only. G820 has no Ethernet AnyIO ports.
- Invented mid-range: G810 / G830 / DS-8810B / DS-8830B are not public as of 2026-08-27.
- Extension as Gen 8: 7850 / MP-7850B and SN8700B stay Gen 7 even on FOS 10.x.
- Unlabeled soft prices: channel corridors without “industry estimate / pending confirmation” become fake public price claims.
Frequently Asked Questions
Quick Answer: Seven questions strip aliases: G820 versus DS-8820B, 24/56 versus 24/64, AnyIO only on directors, OSFP-to-2×QSFP for Gen 7 ICL, one OEM per PO, whether TGStor sells G820/X8, and whether TGStor sells an X7. Each answer opens with the buying conclusion.
They are the same Broadcom Gen 8 1U switch. G820 is the Brocade name; DS-8820B is the Dell Connectrix ordering alias. The hero RFQ kit is the G820 Dell OEM 24-port / 64G optic pack with front-to-rear airflow and rails. It is not DS-7720B and it is not a 64-port SFP-DD chassis.
24/56 is Gen 8 G820 math: 24 base ports plus four 8-port SFP+ PoD licenses to 56. 24/64 is Gen 7 G720 math that uses SFP-DD to reach 64. Mixing the two strings on one PO mis-orders optics, PoD, and airflow kits.
No. Unified Storage Fabric / AnyIO is a director plus FC128-48 feature. Ports 24–47 on each blade can become Ethernet. G820 has no AnyIO ports. Do not promise IP storage on the 1U hero kit.
Gen 8 ICL uses OSFP. A qualified OSFP-to-2×QSFP breakout is required to meet Gen 7 ICL. Same-generation ICL is 100 m on OSFP MMF MPO-16 or 2 km on OSFP SMF dual LC. All transceivers are PC/UPC.
No. S7U34A is not DS-8820B, is not 8634-F56, and is not HD-G820-24-64G-F-Z.P. Freeze one OEM path per purchase order and copy only that vendor's part numbers. Dell 210- codes, IBM feature codes, and the HPE SN6800B POD SKU stay pending official documents. DS-8820B and TGStor G820 cannot share one PO.
Yes — TGStor G820 / X8-4 / X8-8, same ASIC path as Dell DS-8820B / ED-DCX8. Product names only; no TG- MPN dump. DS-8820B and TGStor G820 cannot share one PO. TGStor is a channel product path, not Huawei SNS.
Yes — TGStor X7-4 / X7-8 on the Gen 7 map. This Gen 8 page still names them so buyers do not mix generations.
References
Quick Answer: Confirm platforms on Broadcom G820 and X8 pages, the Hitachi/Broadcom quick-reference SKU list, HPE SN6800B store and SN8800B QuickSpecs, IBM b-type matrix, and Lenovo Press LP2270/LP2271. Dell sheets confirm marketing names only. Soft prices stay industry estimate / pending confirmation.
- Broadcom — 19 November 2025 product release: first 128G Fibre Channel platforms
- Broadcom — Brocade G820 switch product page
- Broadcom — X8 Director product brief (PDF)
- Broadcom — Fabric OS 10.0.x supported hardware and software
- Broadcom — Hitachi Vantara Brocade Quick Reference Guide (SKU list)
- IBM — b-type SAN switch and Broadcom product matrix
- HPE Store — SN6800B (G820) product page
- HPE — SAN Director QuickSpecs (SN8800B / SN8700B)
- Lenovo Press LP2270 — ThinkSystem DB820S
- Lenovo Press LP2271 — ThinkSystem X8 directors (PDF)
- Dell — Connectrix DS-8820B spec sheet (G820 OEM confirmation)
- Dell — Connectrix ED-DCX8 spec sheet (X8 OEM confirmation)
- Broadcom — FC128-48 port blade overview
Primary identity source: Broadcom FOS 10.0.x hardware list + OEM confirmation sheets, reviewed 2026-08-27. Soft channel prices remain industry estimate / pending confirmation. This buying guide is not a published price list.
Key Takeaway
Key Takeaway: Quote Gen 8 only when 128G and Fabric OS 10.0.x are the target. Use G820 for 1U edge and X8-4 or X8-8 when blades, ICL, or AnyIO are required. Copy one OEM's SKUs, never mix them. Line-item optics, PoD, 3000 W PSU, and airflow. BENQUAN GLOBAL LIMITED supplies Brocade G820 and X8 directors with competitive pricing.