Data Protection / Backup / Backup TCO / Cost Analysis / Procurement / RFQ

Have you priced restore egress, not only the per-gigabyte rate?

Capacity pricing is not restore pricing. Egress, API requests, retention compounding, and immutability clauses decide the real five-year cost of a backup platform — price the worst restore day before you sign.

Quick Take

Quick Take: Cloud backup quotes advertise a per-GB capacity price, then recover margin on egress, API requests, and retrieval acceleration when you actually restore. A defensible TCO carries all four cost lines across the full retention schedule, then compares hybrid appliance designs. BENQUAN GLOBAL LIMITED supplies backup appliances and immutable storage hardware.

Searching cloud backup Hong Kong? Price the restore day the same way — egress and retrieval still dominate — then decide whether a free-port / worldwide hybrid appliance copy cuts the day-to-day restore bill before cloud archive is only for true site loss. Soft net prices stay pending confirmation on a dated RFQ.

Why Cloud Backup Quotes Mislead Buyers

Quick Answer: Providers quote the monthly capacity price per gigabyte and stay quiet about the retrieval side. Storing 100 TB looks affordable until a full restore adds an egress bill approaching four times one month of storage. Judge every backup quote on the price of the worst restore day, not the calmest storage month.

Backup platform decisions are won on the advertised per-GB capacity price and lost on the restore bill. Egress, API requests, retrieval acceleration, and minimum-duration clauses never headline the pitch deck — price the worst restore day before you sign anything.
4x
Full-Restore Egress vs Monthly Storage
180d
Deep Archive Minimum Billing
10:1
Typical Dedup Ratio
2.6yr
Hybrid Break-Even

Public object-storage price sheets lead with the capacity line: roughly USD 0.023 per GB-month for standard tiers, USD 0.004 for cold archive, and under USD 0.001 for deep archive. On that math, parking 100 TB of backups looks like a rounding error next to the hardware refresh it replaces.

The lines that decide the real bill sit further down the rate card: egress when data leaves the provider, per-request API charges, minimum storage durations on archive tiers, retrieval surcharges when you need data quickly, and cross-region replication if the compliance team wants a second geography. None of them appear on the first slide of a backup pitch.

Worked example from a 100 TB estate: standard-tier storage runs about USD 2,300 per month. A 10 TB ransomware restore adds roughly USD 900 of egress — 39 percent of a full month of storage, triggered by one incident. A complete site-loss restore of all 100 TB costs about USD 9,000 (HK$70,200) in egress alone, close to four months of storage spend, payable in the same week the business is already down.

Capacity price vs restore price

The advertised number is the price of doing nothing — data at rest, no incidents, no audits. Backup exists for the day you pull data back out, and that day is billed on a different meter: egress bands start near USD 0.09 per GB and only ease toward USD 0.07 at very high monthly volume. Rank quotes on the restore price.

The Four Cost Lines a Backup TCO Must Carry

Quick Answer: A credible cloud backup TCO carries four lines: capacity storage, API request charges, egress for every restore scenario, and restore acceleration such as expedited retrieval or dedicated links. Quotes that show only the storage line understate lifetime cost badly, because the other three lines scale with file count, change rate, and incident frequency.

Build the model with four explicit lines, each priced at your file counts and restore scenarios rather than at the provider's happy path.

Cost line What drives it List-rate behavior Where quotes hide it
Capacity storage Stored TB after retention compounding and dedup Standard tiers near USD 0.023/GB-month; archive tiers from USD 0.004 down to under USD 0.001 Only the standard tier for month one is shown; minimum-duration clauses bill deleted objects anyway
API requests Every file PUT, GET, LIST, DELETE PUT-class near USD 0.005 per 1,000 requests; GET-class near USD 0.0004 per 1,000 A million-file daily job generates about 30M PUTs per month (~USD 150); LIST-heavy backup software multiplies it
Egress Every restored gigabyte leaving the provider About USD 0.09/GB on the first bands, easing toward USD 0.07/GB at very high volume A full 100 TB restore is about USD 9,000 (HK$70,200) — absent from most quotes
Restore acceleration Urgency on disaster day Expedited archive retrieval near USD 0.03/GB vs bulk USD 0.0025/GB — a 12x spread; accelerated transfer runs 2-4x normal rates The incident plan assumes speed the budget never priced

A fifth, quieter line hides inside storage: lifecycle transition fees. Moving objects into archive tiers bills per 1,000 objects — about USD 0.05 per 1,000 into cold archive — so tiering 10 million small files costs around USD 500 before a single byte is ever retrieved. Backup platforms that write millions of small chunk objects feel this line hardest.

Retention Policy Math: How Copies Compound

Quick Answer: Retention schedules compound stored capacity far beyond the front-end estate. Thirty dailies, twelve weeklies, and monthly or yearly fulls multiply logical terabytes, and archive-tier minimum storage durations charge deleted objects anyway. Model stored capacity from change rate and schedule first, then apply deduplication and compression before trusting any per-month figure.

Retention schedules quietly multiply the estate. Take a 100 TB front end changing about 1 TB per day, protected by a common grandfather-father-son schedule — 30 dailies, 8 weeklies, 12 monthlies:

Schedule line Copies retained Logical capacity
Daily incrementals 30 ~30 TB (1 TB change per day)
Weekly fulls 8 ~800 TB
Monthly fulls 12 ~1,200 TB
Live full (current) 1 100 TB
Total logical 51 ~2,130 TB before reduction

Deduplication and compression pull that logical number back down — 2:1 compression and roughly 10:1 dedup across fulls are typical for backup workloads — but only when the platform actually deduplicates across restore points. Two quotes with identical front-end terabytes can differ five to ten times in stored capacity, and stored capacity is the number the invoice is computed from.

Archive minimum durations interact with the schedule in a way finance rarely sees coming. Daily restore points that expire after 30 days must never auto-tier into a 90-day-minimum archive class, because every short-lived object is billed for the full 90 days regardless — and deep archive stretches the minimum to 180 days. A mis-scoped lifecycle rule can quietly double the storage line.

Model stored terabytes before you price

Require every bidder to state the assumed change rate, dedup and compression ratios, and the resulting stored-capacity estimate for each year of the schedule — plus the overage rate when reality exceeds the estimate. A TCO built on front-end terabytes alone is a guess wearing a spreadsheet.

Cloud vs On-Prem Backup Target Crossover

Quick Answer: Cloud wins early because there is no capital outlay; on-premises targets win later because restores are free and hardware amortizes. On a 100 TB estate with one full restore per year, the five-year totals sit close together, and the crossover lands near year four or five. Hybrid reaches payback sooner.

On a 100 TB estate with one full restore per year, the five-year totals land closer than either camp admits:

Architecture Year 1 Years 2-5 (annual) 5-year total
Cloud-only (standard + intelligent tiering) HK$227,520 HK$227,520 HK$1,137,600
On-premises target (NAS + tape) HK$854,000 HK$104,000 HK$1,270,000
Hybrid (appliance + cloud archive) HK$591,440 HK$91,440 HK$957,200
  • Year one belongs to cloud: no capital outlay, no rack space, no installation project.
  • Break-even vs on-premises arrives around year 4.5; beyond it, the amortized NAS-and-tape target with free restores pulls ahead.
  • Hybrid vs cloud-only breaks even near 2.6 years and posts the lowest five-year total of the three architectures.
  • Restore frequency is the swing variable: at zero restores, cloud-only improves; at monthly project restores, the egress line drags it under much sooner.

Rough placement guide: estates under about 10 TB with short horizons and no capital budget stay cloud-only; 100 TB-plus estates with five-year horizons and frequent restores justify an on-premises target; most enterprises in between land on hybrid. The same crossover logic for primary storage is worked through in On-Premises vs Cloud Storage TCO.

Immutability and Ransomware Clauses

Quick Answer: Object lock and WORM retention add no storage premium, but locked objects cannot be deleted early, so over-retention becomes a silent multi-year cost. Ransomware recovery also pays full egress on every restored terabyte. Specify retention mode, lock duration, and an air-gapped or appliance copy before signing any immutability clause.

Object lock and WORM retention are now standard asks on every backup RFQ, and rightly so — an immutable copy is what makes recovery possible when the attacker holds the primary. The clauses around immutability are where the cost hides:

  • Lock mode: governance mode allows privileged unlock; compliance mode cannot be shortened by anyone, including the provider. Point compliance mode at the real legal mandate, never at "longest available".
  • Over-retention is the hidden invoice: locking 100 TB for seven years at standard-tier rates approaches USD 193,200 of storage; if the actual mandate was three years, about USD 110,400 of that bought nothing.
  • Ransomware restores still pay egress: pulling 10 TB back after an incident costs roughly USD 900 at list — and if the clean copy sits in an archive tier, expedited retrieval at 12 times the bulk rate is what your recovery-time objective actually buys.
  • Air gap complements object lock: immutable appliance snapshots, offline tape, or a vaulted third copy cover the failure modes that a single cloud account cannot.

For the WORM decision itself, see NetApp SnapLock vs AWS S3 Object Lock — array-side vs cloud-side retention lock — and Rubrik Cloud Vault vs S3 Glacier immutability for a managed vault measured against self-assembled object lock.

Hybrid Patterns: Appliance Plus Cloud Tier

Quick Answer: The pattern that keeps winning pairs a local backup appliance for daily restore points with a cloud archive tier for offsite retention. Day-to-day restores come off the appliance at zero egress cost, while the cloud copy only pays retrieval during a true site loss. Savings of roughly forty to sixty percent are typical.

The architecture is simple: daily restore points land on a local backup appliance or NAS — restores complete in hours at zero egress — while weekly or monthly fulls tier to a cloud archive as the offsite, immutable copy. The cloud copy is touched only during a true site loss, which is exactly the event it is priced for.

Architecture CapEx Monthly OpEx Full-restore cost Restore time
Cloud-only HK$0 ~HK$19,110 ~HK$70,200 (100 TB egress) 24-48 hours
Local-only (NAS) ~HK$500,000 ~HK$2,000 HK$0 4-8 hours
Hybrid ~HK$500,000 ~HK$11,000 HK$0 (restore from local) 4-8 hours

At steady state the hybrid design in this example runs about HK$8,110 per month below cloud-only — a 42 percent reduction — while cutting full-restore time from days to hours.

Field result from a 200 TB media-production estate: cloud-only backup with frequent per-project restores was tracking about HK$514,800 per year, with every 10 TB project pull adding HK$7,020 of egress. Re-platformed onto a 200 TB appliance with completed projects tiered to deep archive, the annual run rate fell to roughly HK$190,800 — 63 percent lower — restores dropped from 12 hours to 2, and the appliance CapEx paid back in about 10 months.

  • Seeding the first full: physical transfer devices move about 80 TB per job for a flat fee plus a per-GB charge — cheaper than paying accelerated-transfer rates at 2-4 times normal upload pricing.
  • Steady-state link: above roughly 10 TB per month of sustained transfer, a dedicated connection undercuts internet egress rates.
  • Software layer: the control-plane choice is its own RFQ — see Cohesity vs Veeam and Commvault Metallic vs Veeam Data Cloud.

RFQ Checklist: Backup TCO on One Brief

Quick Answer: Send one brief that states protected capacity, daily change rate, file count, retention schedule, restore-time objectives, and immutability requirements. Ask every bidder to price storage, API requests, egress at your stated restore scenarios, and seeding. Then request a hybrid appliance option on the same brief so the comparison is honest.

What to put on the backup RFQ

  • Protected capacity by workload, daily change rate, total file and object count, annual growth
  • Retention schedule stated as counts: dailies, weeklies, monthlies, yearlies, legal holds
  • Restore scenarios with recovery-time objectives: single VM or project, and full site loss
  • Egress and retrieval pricing computed at those scenarios, in writing on the quote
  • API and request-fee estimate at your stated object counts, including the LIST behavior of the backup software
  • Archive tier minimum durations and lifecycle transition fees, mapped against the schedule
  • Immutability terms: object lock mode and duration, plus the air-gapped or appliance copy
  • Seeding method and cost for the initial full; link choice above 10 TB per month of steady transfer
  • Dedup and compression assumptions with a stored-terabyte estimate and an overage rate card
  • A hybrid appliance-plus-archive option priced on the same brief
  • Three-to-five-year totals including at least one full restore per year

Submit the backup brief on rfq.html.

Frequently Asked Questions

Quick Answer: Egress is the fee buyers underestimate most: capacity pricing looks small until a restore multiplies it. On-premises targets win five-year TCO once estates and restore frequency grow, while hybrid designs reach break-even fastest. Object lock is free to store but expensive to over-retain, so retention duration deserves real scrutiny.

Egress. Providers charge for every gigabyte that leaves their network, around USD 0.09 per GB at list on the first bands. A full 100 TB restore runs near USD 9,000 — roughly four times a month of storage — and archive tiers add retrieval fees on top.

In year one, usually — there is no hardware outlay. Over five years on a 100 TB estate with one full restore per year, an on-premises target overtakes cloud around year 4.5, and a hybrid appliance-plus-archive design beats both with break-even near 2.6 years.

Egress is the largest single surprise, followed by API request charges on million-file estates and archive minimum-duration clauses that bill 90 or 180 days of storage even for objects deleted after a day.

There is no storage premium, but locked objects cannot be deleted before the retention period ends. Locking 100 TB for seven years when the mandate is three wastes roughly USD 110,400 at standard-tier list rates — set lock duration to the real requirement.

Submit one RFQ with your capacity, change rate, retention schedule, and restore objectives for a like-for-like hybrid comparison. BENQUAN GLOBAL LIMITED supplies backup appliances and immutable storage hardware with worldwide shipping.

No — egress and retrieval still dominate the restore day. What changes for Hong Kong and regional buyers is often the hybrid design: keep daily restore points on an appliance you can ship worldwide / free-port, and use cloud archive only for offsite retention so routine restores avoid egress. Soft appliance and cloud nets stay pending confirmation on a dated RFQ.

Key Takeaway

Key Takeaway: Cloud backup is priced to look cheap at rest and expensive in recovery. Carry storage, API, egress, and restore-acceleration lines across the full retention schedule, test the five-year crossover against an appliance-anchored hybrid, and lock immutability duration to the real mandate. BENQUAN GLOBAL LIMITED supplies backup appliances and immutable storage hardware with competitive pricing and worldwide shipping.

Not sure your backup BOM is optimal?

If egress exposure, retention compounding, immutability clauses, or the appliance-vs-cloud crossover are unclear on your backup quotes, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents