Quick Take
Quick Take: Quote X9508 with X210c M8 for new Xeon 6 projects, up to eight nodes in 7RU. Keep M7 where 4th or 5th Gen Xeon is required, and do not quote the EOL X210c M6. Pair with Intersight and FI/IFM fabric.
X9508 Chassis
Quick Answer: 7RU enclosure for up to eight single-slot compute nodes, dual Intelligent Fabric Modules, redundant PSUs/fans, and X-Fabric modules for PCIe/GPU nodes. 7RU modular chassis, up to 8 compute slots Intelligent Fabric Modules to Fabric Interconnects Path to X440p / X580p PCIe (GPU) nodes Typically UCS 6400/6500-class FI pairs upstream Per-node fabric bandwidth.
Figures follow Cisco UCS X210c M8 / M7 and X9508 documentation. Confirm CPU SKUs, VIC/IFM pairing, and Intersight license on the quote. BENQUAN GLOBAL LIMITED is a global Cisco UCS supplier for X9508 chassis, X210c nodes, IFMs, and support with worldwide shipping. Related: HPE DL360 Gen11, Nexus 9300, Secure Firewall 4245 ASA parts, SKU Lookup. Request a quote.
| Component | Role |
|---|---|
| UCS X9508 | 7RU modular chassis, up to 8 compute slots |
| X9108-IFM-25G / 100G | Intelligent Fabric Modules to Fabric Interconnects |
| X-Fabric modules | Path to X440p / X580p PCIe (GPU) nodes |
| Fabric Interconnect | Typically UCS 6400/6500-class FI pairs upstream |
Per-node fabric bandwidth depends on VIC + IFM: designs reach about 100–200 Gbps per server (e.g. 100G per IFM with appropriate VIC/IFM combinations). Confirm the exact VIC 15230 / 15420 / 15422 map on the BOM.
Overview
Quick Answer: Cloud-operated modular system — compute nodes plug into a shared chassis fabric (no traditional midplane), managed by Intersight (UCS Manager optional on supported designs). Quote X9508 + X210c M8 for new Xeon 6 projects (up to 8 nodes / 7RU).
Compute Nodes (current)
Quick Answer: Quote X210c M8 for new builds: two Xeon 6 sockets reach about 86 cores each, memory tops out near 8 TB of DDR5, and drive bays take up to nine E3.S NVMe. Keep M7 only when a workload is certified on 4th or 5th Gen Xeon. M6 is end-of-life.
| Node | CPU | Memory (max) | Local storage (typ.) |
|---|---|---|---|
| X210c M8 | 1–2× Intel Xeon 6 (up to ~86 cores/socket) | Up to ~8 TB DDR5-6400; MRDIMM up to ~8000 MT/s | Up to 6× SFF NVMe/SAS/SATA or up to 9× E3.S NVMe |
| X210c M7 | 1–2× 4th/5th Gen Xeon Scalable (up to 64 cores) | Up to ~8 TB DDR5 (up to 5600 MT/s class) | Up to 6× SAS/SATA/NVMe |
| X210c M6 | — | — | EOL — do not quote new |
Use Cases
Quick Answer: Dense virtualization, private cloud, VDI, and AI inference with shared GPU nodes — when you want blade density with rack-like I/O flexibility. X9508 + X210c M8 nodes, 100G IFMs, Intersight Essentials/Advantage. X210c + X440p/X580p for NVIDIA/Intel accelerators without full DGX footprints.
Xeon 6 modular refresh
X9508 + X210c M8 nodes, 100G IFMs, Intersight Essentials/Advantage.
GPU-assisted pools
X210c + X440p/X580p for NVIDIA/Intel accelerators without full DGX footprints.
Vs rack servers
Need simple 2U rack BOMs → DL380 Gen11 / DL360 Gen11.
Buying Checklist
Quick Answer: Chassis → node gen → CPU/DIMM → VIC/IFM → FI → Intersight → support. X210c M8 vs M7 (avoid M6) VIC + IFM 25G vs 100G design Intersight license and Smart Net / SNTC Search Cisco parts on SKU Lookup.
- X9508 quantity and power/cooling
- X210c M8 vs M7 (avoid M6)
- CPU, memory, and drive population
- VIC + IFM 25G vs 100G design
- Fabric Interconnect pair and optics
- Optional PCIe/GPU nodes
- Intersight license and Smart Net / SNTC
Search Cisco parts on SKU Lookup.
Frequently Asked Questions
Quick Answer: X-Series is not a B-Series successor you can populate with old blade SKUs; the X9508 uses orthogonal fabric modules and is operated through Intersight. Compute generations can be mixed in one chassis, so M7 and M8 nodes coexist, but M6 should stay in place rather than appear on a new order.
The official UCS X9508 chassis datasheet is on Cisco: datasheet-c78-2472574.pdf (cisco.com). This page is the RFQ table — X210c M8/M7 nodes and 25G/100G IFM — so you size a chassis before opening that PDF. Do not quote EOL X210c M6.
No — X-Series is a newer modular architecture with orthogonal IFM connectivity and Intersight-first operations. Do not mix B-Series SKUs into an X9508.
Yes — Cisco documents mixing M6/M7/M8 compute nodes in the same X9508 (M6 only if already installed; do not buy new M6).
Contact info@benquan.hk or request a quote.
Key Takeaway
Key Takeaway: For Cisco UCS Global B2B procurement, quote X9508 + X210c M8 for new Xeon 6 projects (up to 8 nodes / 7RU). Keep M7 when 4th/5th Gen Xeon is required. Do not quote EOL X210c M6. Pair with Intersight and FI/IFM fabric. BENQUAN GLOBAL LIMITED supplies UCS X9508, X210c nodes, and Intersight licensing with competitive pricing.