Quick Take
Quick Take: Secure Firewall 3100 spans the 3105–3140 fixed appliances running FTD or ASA software. Size on FW+AVC+IPS throughput (about 10–45 Gbps), concurrent sessions, VPN peers, and port mix — never firewall-only stickers. 3130/3140 add 25G and optional 40G NetMods; beyond that, peer the 4200 instead. BENQUAN GLOBAL LIMITED supplies the 3100 series.
Key extractable numbers
Secure Firewall 3100 ladder on this page (Cisco FTD datasheet, 1024B): FW+AVC+IPS roughly 10 / 17 / 21 / 38 / 45 Gbps across 3105–3140; concurrent sessions about 1.5M to 10M. Every chassis: 8× RJ45 + 8× SFP+; 3105/3110/3120 top out at 10G on those cages, while 3130/3140 support 25G and an optional 40G-class NetMod. Size FTD or ASA path plus FMC/subscriptions—open a 4200 column when NetMod density or sustained throughput exceeds 3140 headroom.
When Secure Firewall 3100 Specs Matter
Quick Answer: Use this page when sizing a new edge next-generation firewall, replacing Firepower 2100-class appliances, or mapping chassis estates onto fixed 3100 SKUs. It exists so a refresh is not defaulted to the 4200 family, and so no model is picked from a sales nickname alone.
- Chassis migration (adjacent): 4100/9300 → 3100/4200 RFQ checklist — peer map and NetMod remaps.
- 4200 family: Secure Firewall 4200 Series · 4245 ASA path.
- Software path: ASA to FTD RFQ · Secure Firewall 10 update.
- Vendor peer: Secure Firewall vs FortiGate · FTD vs Palo Alto.
Model Ladder — Throughput & Sessions (FTD)
Quick Answer: Cisco datasheet FTD figures (1024B) put FW+AVC+IPS roughly at 10 / 17 / 21 / 38 / 45 Gbps across 3105–3140. Concurrent sessions scale from about 1.5M to 10M. Always re-validate against your packet mix, TLS decrypt load, and VPN offload assumptions.
| Model | FW+AVC+IPS (approx.) | Max sessions (AVC) | Typical role |
|---|---|---|---|
| 3105 | ~10 Gbps | ~1.5M | Small edge / branch NGFW |
| 3110 | ~17 Gbps | ~2M | Standard campus/edge refresh |
| 3120 | ~21 Gbps | ~4M | Busy edge; 2100→3100 uplift |
| 3130 | ~38 Gbps | ~6M | High edge; 25G + optional NetMod |
| 3140 | ~45 Gbps | ~10M | Top of 3100 ladder before 4200 |
Brochure vs production
Firewall-only Gbps looks higher than FW+AVC+IPS. If threat inspection and URL/malware are mandatory, size to inspected throughput and TLS figures — then dual-quote the next model up when peaks sit within ~20% of the sticker.
- VPN: IPsec throughput and peer counts differ by model; VPN offload on supported FTD/ASA releases changes the number — state offload assumption on the RFQ.
- New connections/sec: Burstier estates (auth storms, proxy farms) may hit CPS before raw Gbps — put CPS on the brief.
- HA: Active/standby pairs double appliance lines; clustering on supported models is a separate design, not a free upgrade.
Interfaces & NetMod Reality
Quick Answer: Every 3100 ships eight RJ45 copper ports plus eight SFP+ cages. The 3105, 3110 and 3120 top out at 10G on those cages, while the 3130 and 3140 support 25G and accept an optional 40G-class network module. Budget optics and direct-attach cables as separate line items.
| Models | Fixed I/O (typical) | Optional path |
|---|---|---|
| 3105 / 3110 / 3120 | 8× RJ45 + 8× 1/10G SFP+ | Additional 10G SFP+ optics as needed |
| 3130 / 3140 | 8× RJ45 + 8× 1/10/25G SFP+ | 10G/25G/40G optics; optional 40G-class NetMod |
Interface remap first
When replacing Firepower 4100/9300 with NetMods, write the port map before picking 3120 vs 3130. Wrong media class wastes optics lead time and burns the HA cutover window — see the migration checklist.
FTD vs ASA — Same Hardware, Different BOM
Quick Answer: Every 3100 appliance runs either FTD or ASA on identical hardware. FTD estates must size Firepower Management Center and buy threat, URL and malware subscription years. ASA estates need operational tooling and an explicit renew-versus-migrate position. Never hide the software path underneath a hardware-only quote.
- FTD: Policy, Snort/IPS, and URL/malware on FMC — device count and HA FMC on the same RFQ as appliances.
- ASA: Stateful firewall/VPN path on the same box — useful for brownfield ASA ops, but do not assume feature parity with FTD threat.
- AnyConnect / Secure Client: VPN headend capacity rides the appliance — align with GlobalProtect vs AnyConnect when remote access is on the same PO.
- Code train: Align target FTD/ASA version with Secure Firewall 10 planning before ATP dates lock.
When to Step Up to Secure Firewall 4200
Quick Answer: Stay on 3100 when fixed I/O and 3140-class throughput cover the edge. Move to 4200 when NetMod density, higher sustained throughput, or chassis peer maps exceed the 3100 ladder — open a 4200 column instead of hoping a 3140 absorbs every NetMod.
- Stay 3100: Fixed-port edge, 2100 refresh, moderate VPN, clear 10/25G map.
- Open 4200: NetMod-heavy 4100/9300 peers, multi-40G needs, or throughput above comfortable 3140 headroom — start at 4200 Series.
- Equalize columns: Same license years, FMC, HA, and optics assumptions across 3100 vs 4200 quotes.
RFQ Checklist — 3100 Model Ladder on One Brief
Quick Answer: Build the brief from measured peak traffic, an interface and network module map, the FTD or ASA software path, dual quotes on adjacent 3100 SKUs plus a 4200 column when needed, Firepower Management Center with matched subscription years, and dated availability for appliances, licenses and optics on one go-live.
What to put on the RFQ
- Measured peaks: FW, AVC+IPS, TLS, VPN (state offload assumption)
- Sessions and new connections/sec requirements
- Target models: primary + adjacent (e.g. 3120 and 3130)
- Interface map: copper, SFP+/SFP28, NetMod yes/no, optics/DAC qty
- Software: FTD or ASA; FMC or ASA ops path
- Threat/URL/malware subscription term years matched to support
- HA topology (and clustering only if designed)
- Optional 4200 peer column with equal assumptions
- Migration context: 4100/9300 checklist if chassis estate
- Dated ATP for appliances, licenses, and optics together
Submit the sized brief on rfq.html.
Frequently Asked Questions
Quick Answer: Ladder the 3105 through 3140 on inspected throughput, session counts and interface media rather than on model nicknames. Dual-quote neighboring SKUs, and open a 4200 column when network module density or sustained throughput exceeds comfortable 3140 headroom. Keep Firepower Management Center and license years on the same sheet.
The official Cisco Secure Firewall 3100 datasheet is secure-firewall-3100-series-ds.html (cisco.com). This page is the RFQ ladder — FTD AVC+IPS and sessions from 3105 to 3140 — so you can size before opening Cisco's sheet. Confirm FMC and license years on the quote.
Size to measured FW+AVC+IPS, sessions, VPN, and interface media. 3105–3120 cover most edges; 3130/3140 add throughput, 25G, and optional NetMods. Dual-quote adjacent SKUs with equal FMC and license years.
When NetMod density or sustained throughput exceeds comfortable 3140 headroom, or chassis peer maps cannot remap to fixed 3100 I/O. Open a 4200 column with equal license and FMC assumptions.
Both. Quote the software path, management (FMC vs ASA ops), and threat subscriptions separately from the appliance sticker.
Submit one RFQ with peaks, interface map, HA, and software path.
Key Takeaway
Key Takeaway: Lock the model on inspected numbers: the ladder runs from roughly 10 Gbps and 1.5M sessions on the 3105 to 45 Gbps and 10M on the 3140, with 25G cages and optional 40G NetMods from the 3130. Dual-quote the next SKU when peaks land within 20% of the sticker. BENQUAN supplies Secure Firewall 3100 appliances with competitive pricing.