Data Center / Modular Spine / ACI / NX-OS

Cisco Nexus 9504: up to 64×400G or 144×100G, and is ACI locked before the order?

Modular Nexus 9000 spine platforms — 9504, 9508, and 9516 chassis with 100G/400G line cards and fabric modules for large ACI or NX-OS fabrics and AI clusters.

Quick Take

Quick Take: For modular DC spines start with the N9K-C9504 (up to 64×400G or 144×100G). Scale to 9508 or 9516 for higher card density and oversubscription margin. Lock ACI vs NX-OS mode before ordering — it changes supervisor, license tier, and APIC/NDFC tooling.

Chassis Options — 9504 / 9508 / 9516

Quick Answer: Three chassis sizes: 9504 (4 slots, compact spine, up to 64×400G / 144×100G), 9508 (8 line card slots, 2–4 fabric modules, mainstream scale), 9516 (16 card slots, highest density, largest DC core). Two supervisor slots on each (one active, one standby recommended).

Mode matters: Nexus 9500 runs NX-OS standalone (VXLAN EVPN) or Cisco ACI fabric in spine role. The operating model changes the supervisor image, DCN license tier, and management tooling (APIC vs NDFC). Lock the mode on the RFQ before line cards are priced.

SKU Slots Scale hint
N9K-C95044 line card / up to 2 supervisorCompact spine — up to 64×400G or 144×100G
N9K-C95088 line card / up to 2 supervisorMainstream modular spine, flexible 100G/400G mix
N9K-C951616 line card / up to 2 supervisorHighest density — largest ACI/NX-OS cores and AI fabrics

Which chassis, which scale

  • Cisco MDS & Brocade FC Spares Lead Time RFQ — B2B procurement & BOM risk guide
  • Up to ~64×400G: a single 9504 often covers a medium spine pair with margin.
  • Beyond one 9504 pair: model port density per fabric before choosing 9508; the extra slots matter more than the chassis itself.
  • AI/ML cluster spines: 9516 with dense 400G line cards keeps interconnect oversubscription low for RoCE/InfiniBand-adjacent east-west traffic.

Overview

Quick Answer: Nexus 9500 is the modular member of the Nexus 9000 family — redundant chassis, supervisors, fabric modules, and 100G/400G line cards for large spines and cores. Pairs with fixed Nexus 9300 FX3/GX leaves in spine-leaf designs under ACI or NX-OS VXLAN.

Figures follow Cisco Nexus 9500 series datasheets. Confirm airflow (burgundy intake / blue exhaust), fabric module sizing, line card pairing, optics, and ACI/NX-OS license on the quote. Distributed fabric switching gives every line card a non-blocking path to every other slot via the fabric modules — this is where modular pays off vs a fixed spine. Related: Nexus 9300, Nexus 9504 product page, Nexus vs Arista spine, SKU Lookup. Request a quote.

Line Cards, Fabric & Supervisor

Quick Answer: Line cards set effective port density and speed across 40G, 100G and 400G, fabric modules must be matched to the card count, and the supervisor runs the control plane in either NX-OS or ACI mode. Undersized fabric, single supervisors or missing redundant power and airflow are the classic bill of materials gaps.

Component Role Procurement note
Supervisor Control plane (N9K-SUP-9504/9508/9516 variants) Two for redundancy; image depends on ACI vs NX-OS mode
Fabric modules Non-blocking backplane between line cards Size to line card count — undersizing throttles north-south
Line cards Port density — 40G (e.g. X9636PQ), 100G (e.g. X9636C-RX, X9632C), 400G options Mix by tier; match airflow color to chassis airflow direction
PSU / fans Redundant power and airflow Check N+1 PSU count and intake/exhaust color on BOM
The most common modular spine BOM mistake is ordering a chassis + line cards but under-sizing fabric modules or forgetting redundant supervisors/PSUs — then the switch cannot support the card density or airflow direction on site. Verify each line.

Use Cases

Quick Answer: Typical roles are large ACI fabric spines running with an APIC cluster, NX-OS VXLAN EVPN cores, high-density 400G spines carrying AI and machine learning east-west traffic, and consolidation of legacy core-aggregation towers. Fixed Nexus 9300-GX leaves hang off these spines over 100G uplinks.

ACI spine pair

Two 9504 or 9508 running ACI with APIC — confirm the ACI overlay license and APIC cluster are on the BOM, not assumed.

NX-OS EVPN core

9508 in NX-OS mode with VXLAN EVPN over 100G/400G uplinks; DCN (Data Center Networking) Essentials or Advantage license per switch.

Vs fixed spine / Arista

Modular vs fixed trade-off — see Nexus vs Arista spine buying guide. For high-scale AI fabrics compare Nexus 9364D vs Arista 7060DX4.

Buying Checklist

Quick Answer: Chassis (9504/08/16) → ACI vs NX-OS mode → supervisor ×2 → fabric modules matched to cards → line card mix (40G/100G/400G) → airflow direction → optics & breakouts → DCN/ACI license tier → APIC or NDFC → Smart Net coverage.

  1. Chassis scale (9504 vs 9508 vs 9516) and future port growth
  2. ACI fabric or NX-OS VXLAN operating model — lock before pricing
  3. Dual supervisors with image matched to mode
  4. Fabric module count sized to line card density
  5. Line card mix and port speeds (40G / 100G / 400G)
  6. Port-side intake vs exhaust airflow, matching across cards/PSUs
  7. Optics and breakouts (QSFP28 / QSFP-DD)
  8. DCN Essentials/Advantage or ACI overlay licensing
  9. APIC or NDFC management tooling
  10. Smart Net / SNTC coverage and spares plan

Search Cisco parts on SKU Lookup.

Frequently Asked Questions

Quick Answer: Nexus 9500 = modular DC spine (ACI or NX-OS); Catalyst 9500 = campus core, no ACI. X96 line cards with -C/-RX suffixes target 100G; QSFP-DD cards add 400G. Mode (ACI vs NX-OS) changes license and tooling — decide on the RFQ. Buy from BENQUAN for config support.

The official Nexus 9500 chassis datasheet is on Cisco: datasheet-c78-729404.pdf (cisco.com). This page is the RFQ table — 9504 / 9508 / 9516 slots and X96 line cards — so you size ACI or NX-OS before opening that PDF. Confirm supervisor and fabric modules on the quote.

Different product lines. Nexus 9500 is a modular data-center spine running NX-OS or ACI. Catalyst 9500 is a campus core (IOS XE) with no ACI fabric role. Do not substitute across families.

Yes. 9504/9508/9516 support ACI fabric spine with the ACI-enabled supervisor image and ACI overlay licensing. Confirm the mode and licenses on the RFQ; ACI vs NX-OS cannot be assumed.

Nexus 9500 uses X96-series line cards. Common examples: X9636PQ (36×40G), X9636C-RX and X9632C (32–36×100G), plus 400G QSFP-DD options. Match fabric module count to the card mix.

Contact info@benquan.hk or request a quote.

Key Takeaway

Key Takeaway: Start modular spines with the 9504 (up to 64×400G / 144×100G); move to 9508 or 9516 for density and oversubscription margin. Lock ACI vs NX-OS mode before ordering — it drives supervisor, license, and APIC/NDFC tooling. Match fabric modules to cards and confirm airflow.

Not sure your Nexus 9500 BOM is complete?

If your spine BOM is missing fabric modules, supervisor, optics, or the right ACI/NX-OS license tier, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents