Cisco Nexus / Equal-BOM RFQ

9336C×24 + 9364C×56 + 1344 CWDM4?

Freeze N9K-C9336C-FX2 ×24, N9K-C9364C-GX ×56, and QSFP-100G-CWDM4-S= ×1344 with NX-OS mode, PI airflow, Smart Account software, and optics qty integrity. Unit and EXW USD from the 18-Aug-2026 planning estimate stay redacted.

Quick Take

Quick Take: Equal-BOM RFQ for N9K-C9336C-FX2 ×24, N9K-C9364C-GX ×56, and QSFP-100G-CWDM4-S= ×1344 from an 18-Aug-2026 Cisco planning estimate. Freeze NX-OS mode, PI airflow, Smart Account on NXOS-CS-10.6.1F, SNTC 12-month lines, and optics qty before CapEx. All unit and EXW USD figures stay redacted.

Last updated: 2026-08-22 · Source estimate prices stripped · Planning estimate only (not a binding Cisco offer)

What This Nexus Equal-BOM RFQ Is

Quick Answer: An equal-BOM RFQ freezes the same SKU list, quantities, mode, airflow, software entitlement, and support years across vendors so CapEx compares fabric completeness — not sticker math. This brief covers eighty fixed Nexus chassis plus 1,344 CWDM4 optics sized for a large 100G leaf/spine-class fabric under NX-OS.

A Cisco Nexus equal-BOM RFQ is a line-item map that buyers use to keep leaf, spine-class, optics, power, fan, cord, mode, and support rows identical before comparing channel responses. The structural quantities below come from sheet Price Estimate on workbook context dated 18-Aug-2026. That sheet is a planning estimate only — not a binding Cisco offer. Every Unit Net, Extended Net, and EXW total is redacted on this page; confirm commercials on a formal RFQ.

Public Cisco documentation positions the N9K-C9336C-FX2 as a 1RU Cloud Scale switch with 36 × 40/100G QSFP28 ports, and the N9K-C9364C-GX as a 2RU GX-series switch with 64 × 40/100G QSFP28 ports usable as leaf or spine in NX-OS or ACI. This RFQ freezes MODE-NXOS on both blocks — it is not an ACI fabric order.

  • Chassis A: N9K-C9336C-FX2 ×24 (36p 40/100G QSFP28)
  • Chassis B: N9K-C9364C-GX ×56 (64p 40/100G QSFP28)
  • Optics: QSFP-100G-CWDM4-S= ×1344 (100GBASE-CWDM4, LC, 2 km SMF)
  • Mode / SW: MODE-NXOS + NXOS-CS-10.6.1F (Smart Account Mandatory = Yes)
  • Support: CON-SNT-N9336FX2 ×24 and CON-SNT-N9KC93CG ×56 — SNTC 8×5×NBD, 12 months

Part search for Cisco SKUs is available on SKU Lookup (Cisco brand index). Use it to verify spellings before you paste the equalized list into RFQ.

Chassis Block A — N9K-C9336C-FX2 ×24

Quick Answer: Twenty-four FX2 chassis ship with three PI fans and two 750 W PI PSUs each, so fans land at 72 and PSUs at 48, with forty-eight CAB-250V-10A-CN cords. MODE-NXOS, NXOS-CS-10.6.1F Smart Account, DCN-OTHER, C1-SUBS-OPTOUT, and CON-SNT-N9336FX2 for 12 months ride one-for-one with the chassis count.

The FX2 block is the denser 36-port fixed SKU in this estimate. Buyers who quote chassis-only and assume factory-default power or exhaust fans will fail hot-aisle/cold-aisle commissioning. Port-side intake (NXK-AF-PI) and burgundy PI fans/PSUs must stay aligned across the entire twenty-four-unit lot.

SKU Qty Role Est. lead (days)
N9K-C9336C-FX224Chassis — 36p 40/100G QSFP2828 (industry estimate / pending confirmation)
CON-SNT-N9336FX224SNTC-8X5XNBD, 12 monthsN/A
NXOS-CS-10.6.1F24NX-OS 10.6.1 image — Smart Account Yes21 (pending confirmation)
NXK-ACC-KIT-1RU241RU accessory kit14 (pending confirmation)
MODE-NXOS24ACI vs NX-OS mode select → NX-OS21 (pending confirmation)
NXA-FAN-65CFM-PI7265 CFM fan, port-side intake (3× per chassis)14 (pending confirmation)
NXK-AF-PI24Airflow selection — port-side intake14 (pending confirmation)
NXA-PAC-750W-PI48750 W AC PSU, PI (2× per chassis)14 (pending confirmation)
CAB-250V-10A-CN48AC cord 250V 10A PRC7 (pending confirmation)
DCN-OTHER24Not for AI Applications selection2 (pending confirmation)
C1-SUBS-OPTOUT24Opt out of default DCN subscription21 (pending confirmation)

Multiplier check: 24 chassis × 3 fans = 72; 24 chassis × 2 PSUs = 48; cords equal PSU count. Any quote that returns 24 fans or 24 PSUs is incomplete against this equal-BOM.

Chassis Block B — N9K-C9364C-GX ×56

Quick Answer: Fifty-six GX chassis use four 160 CFM PI fans and two 2 kW PI PSUs each, producing 224 fans, 112 PSUs, and 112 CN cords. N9K-C9300-ACK, N9K-C9300-RMK, MEM-UPG-OPT-OUT, MODE-NXOS, Smart Account software, DCN flags, and CON-SNT-N9KC93CG for 12 months track the chassis one-for-one.

The GX block supplies the higher port-count fixed platform in this fabric (64 × 40/100G QSFP28). Cisco’s public GX datasheet lists the same fan and 2 kW PSU families used here. The estimate also carries MEM-UPG-OPT-OUT so buyers do not silently inherit a memory-upgrade path they did not approve.

SKU Qty Role Est. lead (days)
N9K-C9364C-GX56Chassis — 64p 40/100G QSFP28 leaf/spine42 (industry estimate / pending confirmation)
CON-SNT-N9KC93CG56SNTC-8X5XNBD, 12 monthsN/A
NXK-AF-PI56Airflow selection — port-side intake14 (pending confirmation)
MODE-NXOS56Mode select → NX-OS21 (pending confirmation)
NXOS-CS-10.6.1F56NX-OS 10.6.1 — Smart Account Yes21 (pending confirmation)
N9K-C9300-ACK56Fixed accessory kit7 (pending confirmation)
NXA-FAN-160CFM2PI224160 CFM fan, PI (4× per chassis)14 (pending confirmation)
MEM-UPG-OPT-OUT56Memory upgrade opt-out14 (pending confirmation)
NXA-PAC-2KW-PI1122 kW AC PSU, PI (2× per chassis)42 (pending confirmation)
CAB-250V-10A-CN112AC cord 250V 10A PRC7 (pending confirmation)
N9K-C9300-RMK56Fixed rack-mount kit7 (pending confirmation)
DCN-OTHER56Not for AI Applications selection2 (pending confirmation)
C1-SUBS-OPTOUT56Opt out of default DCN subscription21 (pending confirmation)

Multiplier check: 56 × 4 fans = 224; 56 × 2 PSUs = 112. Note that the 2 kW PSU line itself shows a 42-day estimate on the sheet — same class as the GX chassis — so power trays can gate go-live even when optics arrive earlier.

Optics Scale Risk — QSFP-100G-CWDM4-S= ×1344

Quick Answer: One thousand three hundred forty-four CWDM4 optics dwarf eighty chassis. Raw port capacity is 24×36 + 56×64 = 4,448 QSFP28 faces; 1,344 optics cover about 30 percent of that face count — so the RFQ must map the port plan and oversubscription before the purchase order, not after crates arrive.

QSFP-100G-CWDM4-S= is Cisco’s 100GBASE-CWDM4 QSFP for duplex LC over G.652 SMF up to 2 km. The estimate lists quantity 1344 with an estimated lead of 17 days (industry estimate / pending confirmation). Optics quantity is the classic CapEx trap on large Nexus fabrics: chassis look “complete” while the transceiver line is either under-bought for the intended mesh or over-bought for a sparse first wave.

Metric Value Buyer action
FX2 QSFP28 faces 24 × 36 = 864 Map leaf downlinks vs uplinks
GX QSFP28 faces 56 × 64 = 3,584 Map spine/leaf role per rack
Total faces 4,448 Do not assume 1 optic per face
CWDM4 qty on estimate 1,344 (~30% of faces) Document which hops get CWDM4 vs DAC/AOC later
Est. optics lead 17 days (pending confirmation) Still demand dated ATP on RFQ

Limitation of this page: we do not invent breakout, DAC, or AOC rows that were absent from the estimate. If your design needs 4×25G breakout or multimode SR4, add those SKUs explicitly on the equal-BOM — do not stretch CWDM4 to cover them.

NX-OS Mode, Smart Account, and DCN Flags

Quick Answer: Every chassis carries MODE-NXOS and NXOS-CS-10.6.1F with Smart Account Mandatory Yes — eighty software lines total. DCN-OTHER and C1-SUBS-OPTOUT also track each chassis so the quote does not silently opt into AI-application or default DCN subscription paths the buyer did not approve.

Mode selection is a hard fork. ACI fabrics need APIC controllers, fabric discovery rules, and often different image packaging. This estimate freezes NX-OS mode only. Mixing an ACI-mode counter-quote into the same CapEx column without rewriting MODE, software, and controllers is a false equal-BOM.

  • MODE-NXOS ×80 (24 FX2 + 56 GX) — explicit NX-OS selection versus ACI
  • NXOS-CS-10.6.1F ×80 — NX-OS 10.6.1 (64-bit) Cisco Silicon image; Smart Account Mandatory = Yes on both blocks
  • DCN-OTHER ×80 — “product will NOT be used for AI Applications” selection on the estimate
  • C1-SUBS-OPTOUT ×80 — opt out of default DCN subscription selection
  • SNTC 12 months — CON-SNT-N9336FX2 ×24 and CON-SNT-N9KC93CG ×56 (8×5×NBD)

Smart Account readiness is a procurement gate, not a footnote. Without an enrolled Smart Account, software entitlement on NXOS-CS-10.6.1F can stall even when hardware crates clear customs. Put the account ID and admin contact on the RFQ cover sheet before PO.

Lead-Time Risk — FX2 vs GX vs Optics

Quick Answer: Estimate lead days print 28 for FX2 chassis, 42 for GX chassis and 2 kW PSUs, and 17 for CWDM4 optics. The logistics footer also notes 42+30 DAYS. Treat every figure as an industry or channel estimate pending confirmation — never as Cisco ATP or a promise of ex-stock free-port inventory.

Critical-path comparison for go-live planning (all day counts = industry estimate / pending confirmation):

Line class Printed est. days Why it gates CapEx
N9K-C9336C-FX2 chassis 28 Leaf-class FX2 lot; still confirm ATP
N9K-C9364C-GX chassis 42 Longest chassis class on the sheet
NXA-PAC-2KW-PI 42 Can match GX chassis delay
QSFP-100G-CWDM4-S= 17 Faster print — still needs dated ATP
Logistics footer note 42+30 DAYS Channel/estimate pending confirmation — do not invent ATP
FOB Point on sheet None (as printed) Confirm Incoterms on formal RFQ

Practical rule: schedule rack readiness against the slower of GX chassis and 2 kW PSU estimates, then overlay optics ATP. A 17-day optics print does not rescue a 42-day spine-class chassis slip. FOB Point printed as None means you still negotiate Incoterms, duty, and freight on the formal RFQ — the planning sheet does not settle them.

Fit / Unfit Boundary

Quick Answer: Fit buyers freeze NX-OS 100G leaf/spine-class fabrics with PI airflow, CN cords, Smart Account software, and explicit CWDM4 qty. Unfit cases include ACI-first estates, PE airflow halls, AI-subscription DCN paths, or anyone expecting published Unit Net or EXW USD on this page.

Suitable for:

  • Large NX-OS mode Nexus fabrics needing equal-BOM comparison across channels
  • Buyers who must catch missing fan/PSU multipliers (3×/2× on FX2, 4×/2× on GX)
  • Projects that already chose port-side intake and PRC 250V 10A cords
  • RFQs that treat optics qty as a first-class CapEx line, not a post-PO add-on

Not suitable for:

  • ACI fabric RFQs that need APIC and ACI-mode images — rewrite the brief
  • Port-side exhaust (PE) airflow halls — PI fans/PSUs here will not match
  • Buyers seeking published commercial USD from the redacted estimate
  • AI-application DCN subscription paths — this estimate selects DCN-OTHER + C1-SUBS-OPTOUT

How to Build an Equal FX2 / GX / CWDM4 RFQ

Quick Answer: Lock NX-OS mode, freeze both chassis counts with PI multipliers, attach Smart Account software and DCN flags, validate CWDM4 qty against the port plan, then gate CapEx on dated ATP. The six steps below align with the HowTo schema and typically close equal-BOM review inside two business days.

  1. Step 1 — Lock fabric mode. Write MODE-NXOS on every chassis line. Reject ACI-mode counter-quotes that omit APIC or silently flip mode inside 24 hours of first RFQ round.
  2. Step 2 — Freeze chassis counts. Lock N9K-C9336C-FX2 ×24 and N9K-C9364C-GX ×56 with matching accessory, rack-mount, and NXK-AF-PI airflow PIDs before price talk.
  3. Step 3 — Multiply fans and PSUs. Require FX2 fans ×72 / PSU ×48 and GX fans ×224 / PSU ×112. Set CAB-250V-10A-CN equal to each PSU count (48 + 112).
  4. Step 4 — Attach Smart Account software. Include NXOS-CS-10.6.1F ×80 with Smart Account Mandatory Yes, plus DCN-OTHER and C1-SUBS-OPTOUT per chassis, and 12-month SNTC lines.
  5. Step 5 — Validate optics scale. Map QSFP-100G-CWDM4-S= ×1344 to the port plan and oversubscription. Document which faces stay dark or use DAC/AOC in a later wave.
  6. Step 6 — Gate on lead time and submit. Treat 28 / 42 / 17 day prints and the 42+30 DAYS footer as pending confirmation. Demand dated ATP, then send the equalized SKU brief via rfq.html?intent=bom-risk. Target response inside one business day after a complete SKU list lands.

Frequently Asked Questions

Quick Answer: This RFQ covers FX2 ×24, GX ×56, and CWDM4 ×1344 under NX-OS with PI airflow and Smart Account software. Fan/PSU multipliers exceed chassis counts; lead days are estimates pending confirmation; and zero Unit Net or EXW USD figures appear here — confirm commercials on a formal RFQ.

N9K-C9336C-FX2 ×24, N9K-C9364C-GX ×56, and QSFP-100G-CWDM4-S= ×1344, plus matching NX-OS mode, PI airflow, Smart Account software, CN cords, DCN flags, and 12-month SNTC lines from an 18-Aug-2026 Cisco planning estimate.

NX-OS only. Both chassis blocks carry MODE-NXOS and NXOS-CS-10.6.1F with Smart Account Mandatory = Yes. Do not treat this RFQ as an ACI fabric order without rewriting mode, image, and APIC lines.

FX2 uses three PI fans and two 750 W PI PSUs per chassis (72 fans and 48 PSUs for 24 units). GX uses four 160 CFM PI fans and two 2 kW PI PSUs per chassis (224 fans and 112 PSUs for 56 units). Quotes that ship one PSU or one fan tray per chassis fail install.

No. Those day counts and the logistics footer note of 42+30 DAYS are industry or channel estimates pending confirmation. Require dated ATP on the formal RFQ; do not invent stock from the planning estimate.

No. Every Unit Net, Extended Net, and EXW total from the prior catalog index is redacted. The sheet is a planning estimate only — not a binding Cisco offer. Confirm commercials on a formal RFQ.

References

Quick Answer: Verify chassis, optics, and ordering language against Cisco’s public FX2, GX, and 100G QSFP datasheets plus NX-OS mode hardware installation notes before CapEx freeze. Sibling buying guides on this site live only under Related — never duplicated in this external list.

Key Takeaway

Key Takeaway: Equalize FX2 ×24 and GX ×56 with PI fan/PSU multipliers, MODE-NXOS, Smart Account software, and CWDM4 ×1344 before comparing quotes. Treat 28/42/17 day and 42+30 DAYS notes as pending confirmation. BENQUAN GLOBAL LIMITED supplies Nexus FX2/GX and CWDM4 BOM lines with competitive pricing after equal-BOM review.

Not sure your Nexus FX2 / GX / CWDM4 BOM is optimal?

If mode, PI multipliers, Smart Account software, optics qty, or lead-time ATP are unclear across quotes, click below for a free compatibility and delivery risk assessment. Fast equal-BOM validation — no reliance on redacted estimate USD.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk