Quick Take
Quick Take: Size Nexus 9300 from the datasheet and front panel: FX3 leaves for 10G/25G racks, GX for 100G/400G spine or dense leaf. Freeze NX-OS versus ACI and port-side intake versus exhaust before price. Campus PoE belongs on Catalyst 9300. N9K-C9348-FX-B24C is one FX3 SKU, not the family.
Nexus 9300 Front Panel (FX3)
Quick Answer: Four FX3 leaf switches cover most top-of-rack builds. Choose 93180YC-FX3 for 48 ports of 25G fiber at roughly 3.6 Tbps, 93108TC-FX3 when servers need 10G copper, the FX3P variant when multigigabit PoE is required, and 9348GC-FX3 for 1G-attached edge racks at around 696 Gbps.
Figures follow Cisco Nexus 9300-FX3 and 9300-GX datasheets. Confirm airflow (burgundy intake / blue exhaust), optics, and ACI/NX-OS license on the quote. BENQUAN GLOBAL LIMITED supplies Nexus switches and Smart Net. Related: Juniper QFX5120, Catalyst 9500, Arista 7050X3 / 7280R3, SKU Lookup. Request a quote.
| SKU | Downlinks | Uplinks | Bandwidth |
|---|---|---|---|
| N9K-C93180YC-FX3 | 48×1/10/25G SFP28 | 6×40/100G QSFP28 | ~3.6 Tbps / 1.2 Bpps |
| N9K-C93108TC-FX3 | 48×100M/1/10G BASE-T | 6×40/100G | ~2.16 Tbps / 1.2 Bpps |
| N9K-C93108TC-FX3P | 48×100M–10G mGig BASE-T (+ PoE details per DS) | 6×100G | ~2.16 Tbps |
| N9K-C9348GC-FX3 | 48×1G BASE-T + 4×10/25G | 2×40/100G | ~696 Gbps |
| N9348C8D-H2 | 48×100G SFP-DD | 8×400G QSFP-DD | up to 8 Tbps (Cisco blog 4 Nov 2026) |
N9348C8D-H2 is not the FX3 copper 9348 on this datasheet page. Lock SFP-DD optics, airflow and AC/DC on the H2 leaf RFQ page before you compare price.
Overview
Quick Answer: Cloud Scale fixed switches built for spine-leaf data centers: VXLAN EVPN, ACI fabric mode, and RoCE with PFC and ECN for AI training traffic, all on dual hot-swap power supplies and fans. What changes between SKUs is downlink speed, uplink count, and whether the fabric runs ACI or NX-OS.
9300-GX Models
Quick Answer: GX is where 400G enters the fabric. Pick 9316D-GX for a compact 16-port 400G spine, 93600CD-GX when a leaf needs 28 hundred-gig ports plus eight 400G uplinks, and 9364C-GX for a dense 64-port 100G spine. Decide ACI versus NX-OS before quoting, because software and APIC needs differ.
| SKU | Ports | Role hint |
|---|---|---|
| N9K-C9316D-GX | 16×400/100/40G QSFP-DD | Compact 400G spine/leaf |
| N9K-C93600CD-GX | 28×100/40G + 8×400G QSFP-DD | Mixed 100G/400G |
| N9K-C9364C-GX | 64×100/40G QSFP28 | Dense 100G spine/leaf |
Use Cases
Quick Answer: Classic DC ToR, ACI leaf, VXLAN EVPN underlay/overlay, and AI/ML RoCE fabrics with PFC/ECN. 93180YC-FX3 under 100G spines; dual PSUs with matching airflow coloring. 93108TC-FX3 or FX3P when hosts need BASE-T instead of SFP28. Arista for EOS leaf/spine — see 7050X3 / 7280R3.
25G server leaf
93180YC-FX3 under 100G spines; dual PSUs with matching airflow coloring.
Copper leaf / lab
93108TC-FX3 or FX3P when hosts need BASE-T instead of SFP28.
Vs Arista / Catalyst
Arista for EOS leaf/spine — see 7050X3 / 7280R3. Campus core — see Catalyst 9500.
How to Buy (Front Panel → Airflow)
Quick Answer: Step 1 read the front panel and freeze port speed. Step 2 pick NX-OS, ACI, or Hyperfabric. Step 3 lock port-side intake versus exhaust as separate SKUs. Step 4 itemize optics and worldwide shipping. Airflow and optics cause the most re-quotes.
- Step 1: Front panel — port speed and density (25G / BASE-T / 100G / 400G).
- Step 2: Operating model — ACI, NX-OS, or Hyperfabric.
- Step 3: Airflow — port-side intake vs exhaust fans/PSUs as separate SKUs.
- Step 4: Optics, breakout, licensing, Smart Net, worldwide shipping.
Search Cisco parts on SKU Lookup.
Which Part Numbers Should You Freeze on the RFQ (7 SKUs)?
Quick Answer: When quoting N9K-C93180YC-FX3 and sibling configurations across these 7 part numbers, lock the exact base MPN, redundant power supplies, optics, and matching 1-year or 3-year support tier on separate lines before comparing vendor discounts. Channel net pricing remains industry estimate / pending confirmation.
| Ordering SKU | Key Configuration & Boundary | Adjacent BOM Lines to Freeze |
|---|---|---|
N9K-C93180YC-FX3 | 48x25G SFP28, 6x100G QSFP28, 3.6 Tbps, 1.2 Bpps. PE = exhaust airflow SKUs. NX-OS vs ACI as a separate decision. | NXA-FAN-35CFM-PE x4, NXA-PAC-650W-PE x2, NXA-FAN-35CFM-PI x4, SFP28 + QSFP28 per drawing |
N9K-C93108TC-FX3 | 48x 10GBASE-T, 6x 100 Gbps, 2.16 Tbps. Not 25G YC-FX3 or FX3P. | NXA-SFAN-35CFM-PE x4, NXA-PAC-500W-PE x2, NXA-SFAN-35CFM-PI x4, QSFP28 per drawing |
N9336C-SE1 | 36x 100 Gbps QSFP28, Silicon One, 7.2 Tbps, 32 GB. Not FX2-E. | NXA-SFAN-35CFM-PE x6, NXA-PAC-750W-PE x2, NXA-SFAN-35CFM-PI x6, QSFP28 100 Gbps / 40 Gbps per drawing |
N9K-C93600CD-GX | 28x100G QSFP28, 8x400G QSFP-DD, 12 Tbps, 4.0 Bpps. Not 9364C-GX. | NXA-FAN-35CFM-PI or PE, NXA-PAC-1100W-PI2 / PE2, QSFP28 / QSFP-DD as drawn, NX-OS or ACI |
N9K-C93240YC-FX2 | 48x25G + 12x100G, 1.2RU, 4.8 Tbps, ACI or NX-OS. Not YC-FX3. | MODE-NXOS or ACI, NXK-AF + NXA-PAC class, SFP28 / QSFP28 as drawn, NXOS train on the quote |
N9K-C9348GC-FX3 | 48x1G BASE-T, 4x25G + 2x100G, 696 Gbps, ACI or NX-OS. Not 93108TC-FX3. | MODE-NXOS or ACI, NXK-AF + NXA-PAC-350W class, SFP28 / QSFP28 as drawn, NX-OS Advantage 1G class |
N3K-C3548P-XL | 48x SFP+, Algo Boost ~250 ns, Warp ~190 ns, 16 GB RAM. Not 3548-X. | N3548-BAS1K9, N3548-LAN1K9, N3548-ALGK9, SFP+ as drawn |
Frequently Asked Questions
Quick Answer: Nexus 9300 is a data center platform running NX-OS or ACI, not a campus replacement for Catalyst 9300, and the two families share no interchangeable SKUs. FX3 models are sized as leaves; spine duty belongs to GX or a modular 9500. Confirm the fabric role before the quote.
Nexus 9300 is a Cisco data-center fixed switch family: Cloud Scale FX3 leaves for 10G/25G racks and GX models for 100G/400G spine or dense leaf. It is not Catalyst 9300 campus access. Confirm NX-OS versus ACI and airflow on the RFQ.
The official Nexus 9300 platform datasheet is on Cisco: datasheet-c78-736967.pdf (cisco.com). This page is the RFQ table — FX3 leaf versus GX spine SKUs — so you size NX-OS or ACI before opening that PDF. Confirm fabric role on the quote.
Different product lines. Nexus = data center NX-OS/ACI. Catalyst 9300 = campus access with PoE/StackWise. Do not substitute SKUs across families.
FX3 is typically a leaf. Spines more often use dense 100G/400G platforms (GX or modular Nexus 9500). Confirm fabric design before ordering.
RFQ the fabric role (FX3 leaf vs GX spine), NX-OS or ACI, port-side intake vs exhaust, optics, and support years through an authorized channel with worldwide shipping.
Key Takeaway
Key Takeaway: Freeze three answers before the quote goes out: what fabric role each switch plays, which operating model the estate standardizes on, and which way air moves through the aisle. Budget optics, breakout cables, and support years as separate lines. BENQUAN GLOBAL LIMITED supplies Cisco Nexus 9300 switches with competitive pricing.