Storage / SAN / Procurement / Comparison / Enterprise / Midmarket

MDS or Brocade G720: are the end devices 32Gb or 64Gb?

SAN refreshes keep pairing MDS with Brocade G720 (and Connectrix OEM). NX-OS vs FOS — optics and 32/64Gb honesty decide TCO. Dual-RFQ one fabric brief.

Quick Take

Quick Take: Cisco MDS and Brocade G720 (plus Dell Connectrix FOS peers) are the core FC fabric shortlist. Peer them on port count, ISLs, optics, and 32Gb vs 64Gb end-device plans — not OS stickers alone. Equalize dual-fabric HA and support years. BENQUAN GLOBAL LIMITED supplies both paths.

When MDS vs G720 Actually Matters

Quick Answer: The Cisco MDS versus Brocade G720 comparison applies to Fibre Channel fabric refreshes, storage array migrations that add front-end ports, and 32Gb to 64Gb speed planning where both Cisco and Brocade or Dell Connectrix packaging are already approved vendors. Confirm approval status first, otherwise one column is theatre rather than a usable quote.

Threads titled “MDS vs G720” rarely fail on brand preference — they fail on missing SFPs, unequal port licenses, and buying 64Gb switches without a written HBA/array hybrid plan.
MDS
Cisco NX-OS
G720
Brocade FOS
32/64
Gb Generation
Dual
Fabric HA

Architecture Fork — NX-OS vs FOS

Quick Answer: Cisco MDS and Brocade G720 both deliver enterprise Fibre Channel switching, so the fork is operational and commercial rather than functional. It rests on NX-OS versus Fabric OS runbooks and on original equipment manufacturer packaging, since Dell Connectrix is Brocade Fabric OS under a different badge and support contract.

Dimension Cisco MDS Brocade G720 / FOS path
OS NX-OS (MDS) Fabric OS (FOS)
Common peers MDS 9148T / director-class as design needs G720 class; Dell DS-7720B as OEM peer
Ops plane Cisco SAN tooling / DCNM-era adjacency Brocade / SANnav-class tooling (confirm on quote)
Speed planning Match HBA + array generation Same — generation must be on the brief
Optics Must itemize SFPs + ISL + spares Same — optics often exceed switch delta
HA pattern Dual independent fabrics standard Dual independent fabrics standard

Naming traps

G720 ≠ every Brocade fixed-port switch. Directors and extension platforms are different RFQ lines. Connectrix is OEM packaging on FOS — compare OS/ops, not just the badge. Port activation licenses can make “48-port” stickers unequal.

Peer Mapping (Intent, Not Nicknames)

Quick Answer: Map Fibre Channel switch candidates by port count and speed generation rather than by family nickname. Peer a fixed-port Cisco MDS switch against Brocade G720 or the Dell Connectrix equivalent under the same inter-switch link count and transceiver brief, so both quotes describe the same fabric rather than two different designs.

Intent Cisco MDS path Brocade / Connectrix path
Edge / mid fabric MDS fixed-port class (e.g. 9148T peer) G720 / DS-7720B class
Grow into 64Gb arrays MDS SKU supporting target generation G720-class generation plan + optics
Keep hybrid 32Gb hosts Written 32/64 hybrid zoning plan Same hybrid plan on FOS side
Director scale Quote directors separately Quote directors separately

Ops & Licensing Fit

Quick Answer: Storage area network operations skill and current support entitlements decide the Cisco MDS versus Brocade G720 question as often as port density does. Price transceivers, port activation licenses and software support years on both paths, because an expired Brocade entitlement can block a Fabric OS upgrade long after the purchase order closes.

  • Lean MDS when: Cisco SAN runbooks, NX-OS skill, and existing MDS fabrics dominate.
  • Lean G720/Connectrix when: FOS estates, multi-OEM SAN standards, or Dell Connectrix packaging fit procurement.
  • TruFOS / support: Expired Brocade support can block firmware — put entitlement on the RFQ, not after PO.

Array ports drive switch ports

PowerStore / Alletra / FlashSystem front-end counts set the fabric size. Do not quote switches without the array and HBA map — see PowerStore FC port planning.

Sizing Truth — Equal Assumptions

Quick Answer: Force equal port counts, dual-fabric high availability, transceiver quantities and speed-generation assumptions onto both the Cisco MDS and Brocade G720 bills of materials. If one quote includes optics and two fabrics while the other lists a single bare chassis, stop ranking vendors and repair the fabric brief first.

  • Host + array map: HBAs and storage ports before switch SKUs.
  • 32 vs 64: State hybrid plan if generations mix.
  • Optics: SFPs, ISLs, and spares on both quotes.
  • Licenses: Port activation / enterprise features year-matched.
If one quote includes optics and dual fabric and the other is a single bare chassis, stop ranking vendors. Fix the fabric brief first.

RFQ Checklist — Dual FC Fabric BOM on One Brief

Quick Answer: Issue one Fibre Channel fabric brief, then request Cisco MDS and Brocade G720 or Dell Connectrix line items priced with equal transceivers, dual-fabric high availability and support years before deciding. State port count per fabric, inter-switch link count, speed generation, and the storage array and host bus adapter models attaching.

What to put on the RFQ

  • Port count per fabric (A/B) and growth reserve
  • ISL count and optic type
  • Speed generation: 32Gb / 64Gb / hybrid plan
  • Array models and HBA models attaching
  • Cisco: MDS SKU, port licenses, NX-OS/support term
  • Brocade: G720 or Connectrix SKU, FOS/support, TruFOS entitlement
  • SFP/optics SKUs + spares (both paths)
  • Zoning migration window from old fabric
  • Support: 3 or 5 years, itemized equally

Use SKU Lookup, then submit the dual-vendor brief on rfq.html.

Frequently Asked Questions

Quick Answer: Compare Cisco MDS and Brocade G720 as fixed-port Fibre Channel fabrics on port count and transceiver spend, write down the 32Gb and 64Gb hybrid plan, and quote both vendors with equal support years before standardizing. Neither wins universally; installed operations skill and entitlement status usually decide which fabric is cheaper to run.

Not universally. MDS wins for many Cisco SAN estates. G720/Connectrix wins for many FOS estates. Dual-RFQ matched fabric briefs.

Only if arrays/HBAs justify it or you have a written hybrid plan. Otherwise 32Gb peers may still fit — see the 64Gb checklist.

It is a Dell Connectrix FOS path — treat as Brocade-family ops when comparing to MDS. Confirm exact SKU on the quote.

Submit one RFQ with the dual-vendor checklist above.

Key Takeaway

Key Takeaway: Let installed runbooks decide: NX-OS estates keep the MDS 9148T, Fabric OS estates keep the G720 or its Dell Connectrix DS-7720B twin. Before ordering, lock ports per fabric with activation licenses, SFP and ISL optics with spares, a written 32/64Gb hybrid plan, and TruFOS entitlement. BENQUAN GLOBAL LIMITED supplies Cisco MDS and Brocade G720 switches with competitive pricing.

Not sure your SAN fabric BOM is optimal?

If MDS vs G720 sizing, 32/64Gb hybrid plans, or optics counts are unclear, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk