Quick Take
Quick Take: Rehost, RMA and license retrieval in Cisco's License Registration Portal all stop dead if the unit is missing from your Devices table. Adding it is one dialog, but the identifier type differs by platform, and Smart Account users must also land the device in the right Virtual Account.
Add Device Steps (Non–Smart Account)
Quick Answer: Devices tab → Add Device → enter Product Family or Device Identifier → complete node-lock fields → OK → Filter by Device ID / Product Family to verify. Sign in to Cisco Software Central → Traditional Licensing (LRP). Open the Devices tab under Manage.
Engineers often hit a wall after RMA or when taking over licenses registered under another CCO ID: Move Licenses and Retrieve workflows need the device in your table. Add Device bridges that gap without re-buying entitlement.
Pair with UDI lookup, PAK registration, and Cisco ONE portability. Request a quote.
Procedure
- Sign in to Cisco Software Central → Traditional Licensing (LRP).
- Open the Devices tab under Manage.
- Click Add Device.
- In the pop-up, enter Product Family or Device Identifier. Choosing Product Family often auto-sets the Device Identifier and prompts for the matching node-lock value.
- Complete required fields → OK.
- Use Filter to search Device ID and Product Family and confirm the row appears.
When You Need Add Device
Quick Answer: Use Add Device when you must retrieve an existing license or move licenses via rehost/RMA, but the device is not visible in your Licenses/Devices view. You need either the Product Family or the Device Identifier (node lock) for that platform.
- Hardware RMA — assign licenses to the replacement serial.
- Rehost / portability — source or destination missing from the table.
- Operator change — licenses exist, but your CCO view never listed the device.
Smart Account Context
Quick Answer: Smart Account users follow the same Add Device steps, with two extra selectors: Smart Account and Virtual Account. Choose the inventory context where the device and licenses should live. Wrong Virtual Account placement is a common reason partners cannot see a device you just added.
Wrong Virtual Account placement is a common reason partners cannot see a device you just added. Align with the account structure from the Smart Account setup guide.
Device Identifier Cheat Sheet
Quick Answer: Pick the identifier type LRP maps to your Product Family. FirePOWER uses the Defense Center license key; many ASA/MDS/Nexus/IronPort lines use Node Lock (UDI Host ID); other families use UDI PID/SN or product-specific fields. Product ID + Serial Number from CLI/labels FirePOWER perpetual / term (legacy Sourcefire) Defense Center license key (model + MAC) ASA 5500.
| Device Identifier | Typical product families | What to enter |
|---|---|---|
| UDI PID / SN | Many classic platforms (Sentinel-style mapping) | Product ID + Serial Number from CLI/labels |
| Cisco FirePOWER License Key | FirePOWER perpetual / term (legacy Sourcefire) | Defense Center license key (model + MAC) |
| Node Lock | ASA 5500, MDS 9000, Nexus 5K/7K/9K, IronPort, Nexus 1000V/3000/4000 | UDI Host ID for the platform |
| License Request | Selected Unified Communications / FNE lines | License request string from the product |
| ASR5000 / ASR5500 | ASR5K family | Valid model + serial (or MEC serial as applicable) |
Collect the right value first
- UDI / Host ID commands: Cisco UDI lookup guide.
- FirePOWER key: Defense Center → System → Licenses → Add New License.
- IronPort physical vs VLN: same distinction as PAK fulfill.
After the Device Appears
Quick Answer: With the device in your table, run Retrieve Existing Licenses, Move Licenses (rehost/RMA), or Cisco ONE suite portability against that UDI. Verify destination serials before submit. Rehost / RMA / portability: Cisco ONE portability guide. New PAK still to fulfill: PAK registration guide.
- Rehost / RMA / portability: Cisco ONE portability guide.
- New PAK still to fulfill: PAK registration guide.
Frequently Asked Questions
Quick Answer: Rehost, RMA and license retrieval all fail if the unit is absent from the LRP Devices table, so add it with the matching Product Family and identifier type. FirePOWER expects the Defense Center license key built from model and MAC; ASA, MDS and Nexus expect the node-locked UDI Host ID.
Sign in at software.cisco.com → Traditional Licenses → Access LRP → Devices → Add Device. This page is the rehost and RMA path — Product Family plus node lock — so Move Licenses can see the unit. Confirm the Virtual Account before you click OK.
Rehost, RMA, and retrieve actions need the device in your LRP Devices table. If it is missing from Licenses/Devices, add it with the correct Product Family and Device Identifier.
Use Device Identifier Cisco FirePOWER License Key and enter the Defense Center license key (model + MAC), not a managed sensor chassis serial.
These families commonly use Node Lock. Enter the platform UDI Host ID. Confirm with the UDI lookup guide for the exact CLI.
Steps are the same; Smart Account users must also select Smart Account and Virtual Account so the device is stored in the correct inventory.
Contact info@benquan.hk or request a quote.
Key Takeaway
Key Takeaway: Add the device before you need the license, not during an outage: match the identifier to the platform — Defense Center key for FirePOWER, node-locked UDI Host ID for ASA, MDS and Nexus — then confirm it with a filter. BENQUAN GLOBAL LIMITED supplies Cisco hardware and license renewals with competitive pricing and worldwide shipping.