Quick Take
Quick Take: Every task in Cisco's License Registration Portal starts with the right identifier: a Virtual License Number for virtual ESA and WSA instances, a chassis serial for physical ones. Mix the two and the download, share and RMA-transfer workflows all point at the wrong record.
Locate Serial Number & VLN
Quick Answer: Virtual appliances: run showlicense in the CLI and record the VLN. Physical appliances: run the version command and record the serial number. Never mix VLN and chassis serial in LRP fields. Use VLN for virtual hosts and serial for physical hosts when fulfilling PAKs, sharing, or RMA-transferring.
Day-two problems dominate this product line: lost license emails, HA pairs needing a shared entitlement, and RMA boxes that still hold the node lock. Getting SN/VLN right prevents most failed transfers.
Related: UDI lookup, Add Device, PAK registration. Request a quote.
CLI
showlicense
version
Use VLN for virtual hosts and serial for physical hosts when fulfilling PAKs, sharing, or RMA-transferring.
Retrieve or Resend Existing Licenses
Quick Answer: Manage → Licenses → Filter by product family → open the License ID menu → Download or Resend. Resend delivers to the account email immediately; newest licenses sort to the top. Use Filters (for example Product Family) → Apply. Open the License ID action menu.
Steps
- Open Manage → Licenses.
- Use Filters (for example Product Family) → Apply.
- Open the License ID action menu.
- Choose Download (local file) or Resend (email to registered address).
RMA: Move License to Replacement Hardware
Quick Answer: An RMA transfer re-locks an existing IronPort license to the replacement chassis serial, so no new license purchase is needed. Two routes exist in LRP: start from the row of the failed unit, or use the Actions menu when that unit is not listed yet. Both finish with a confirmation email.
| Path | When to use |
|---|---|
| Device row → RMA | RMA’d device already visible in your Devices table |
| Actions → RMA | Enter source/target serials and product family without selecting a row first |
Path A — from device row
- Manage → Devices.
- On the RMA’d device (without multi-select), open RMA.
- Enter the new device serial → Next.
- Review, agree to terms → Transfer.
Path B — from Actions
- Devices → Actions → RMA.
- Select product family (IronPort SW Bundle or T&C).
- Enter source (RMA’d) serial → Next → enter target serial → Next.
- Confirm email → Transfer.
Coworker or Merger Access
Quick Answer: Content Security products use Node Lock. Have the new operator Add Device with Product Family (Device Identifier defaults to Node Lock) and the appliance serial. To let a coworker manage your registration, they add the device to their table the same way.
Same pattern covers licenses originally registered by a coworker or by a company you acquired: add the device with the correct serial, then retrieve or rehost from your view.
Demo / Evaluation Licenses
Quick Answer: Evaluation licensing splits by form factor. Virtual ESA and WSA instances can be self-served in LRP by walking the Demo and Evaluation wizard against a VLN, while trial entitlements for physical chassis are only issued through a Global Licensing Operations case. Budget extra lead time whenever a hardware evaluation is part of the project plan.
Virtual demo (self-serve)
- Get Other Licenses → Demo and Evaluation.
- Select Product Family and Product → Next.
- Specify VLN if required (often left blank) → Next.
- Review Send to / End User, agree to terms → Submit.
ESA and WSA Smart Licensing Timers
Quick Answer: Cisco hardware ESA, SMA and WSA appliances ship with a 90-day evaluation license for all features. After evaluation expires there is a 30-day grace period, and authorization renews every 30 days once registered, so plan token registration before day 90.
- Hardware ESA, SMA and WSA models include 90-day evaluation licenses for all features (Cisco: Smart Licensing on ESA/SMA/WSA).
- An expired 90-day evaluation moves the appliance into a 30-day grace period (same Cisco document).
- License authorization renews automatically every 30 days; if the appliance cannot reach Cisco License Central, authorization expires after 90 days (same Cisco document).
Timer values come from Cisco documentation and can change by software release; confirm against the current Cisco guide. Checked 2026-10-15.
Frequently Asked Questions
Quick Answer: Identifier choice drives everything: virtual appliances register by VLN, physical ESA and WSA units by chassis serial. From there LRP can resend a lost license file, generate an activation code to share entitlement with a second appliance, or re-lock a license onto replacement hardware after an RMA.
Virtual: showlicense for VLN. Physical: version for serial. Use the matching field in every LRP workflow.
Share License Process: Get Activation Code from the source, then Use Activation Code on the destination and Get License.
Manage → Licenses → filter → Download or Resend from the License ID menu.
BENQUAN GLOBAL LIMITED supplies Cisco Email and Web Security hardware and licenses. Contact info@benquan.hk or request a quote.
Key Takeaway
Key Takeaway: Replacing a failed appliance needs no new purchase: an RMA transfer re-locks the existing IronPort entitlement onto the replacement serial. Plan extra lead time for demo licenses on physical boxes, which need a Global Licensing Operations case rather than self-service. BENQUAN GLOBAL LIMITED supplies Cisco ESA and WSA appliances and licenses with competitive pricing.