Networking / Campus Core / Modular Switch

Catalyst 9600: does C9600X-SUP-2 give 25.6 Tbps, or are you still on 2.4 Tbps per slot?

6-slot C9606R modular campus core and distribution switch — up to 25.6 Tbps system capacity, 6.4 Tbps per slot with C9600X-SUP-2 (2.4 Tbps with SUP-1), UADP 3.0, 25/40/100/400G line cards, and IOS XE with StackWise Virtual.

Quick Take

Quick Take: The Cisco Catalyst 9600 (C9606R) is a 6-slot modular core switch. With the C9600X-SUP-2 it reaches 25.6 Tbps system capacity and 6.4 Tbps per slot; the C9600-SUP-1 delivers 2.4 Tbps per slot on UADP 3.0. Pick the supervisor first — it sets per-slot bandwidth and 400G readiness.

Performance

Quick Answer: With the C9600X-SUP-2, the C9606R reaches 25.6 Tbps system capacity (12.8 Tbps full-duplex) and 6.4 Tbps per slot (3.2 Tbps full-duplex). The C9600-SUP-1 provides 2.4 Tbps per slot (1.2 Tbps full-duplex) and up to 9.6 Tbps system capacity on the UADP 3.0 ASIC. The supervisor also gates 400G support.

Figures follow the official Cisco Catalyst 9600 Series datasheet and Supervisor Engine datasheets. Confirm the IOS XE train, supervisor choice, and line-card mix on the quote. Related: Catalyst 9500, Catalyst 9300, Nexus 9500, SKU Lookup. Request a quote.

Metric C9600-SUP-1 C9600X-SUP-2
Per-slot bandwidth2.4 Tbps (1.2 FD)6.4 Tbps (3.2 FD)
System switching capacityup to 9.6 Tbpsup to 25.6 Tbps (12.8 FD)
Forwarding ASICUADP 3.0 (3 ASICs)High-capacity next-gen
400G QSFP-DD line cardsNot supportedSupported
LC-48YL port speeds25 / 10 / 1G50 / 25 / 10 / 1G
MACsecAES-256AES-256

*Cisco Catalyst 9600 Series and Supervisor Engine datasheets. Confirm feature support against your IOS XE release.

25.6T
System (SUP-2)
6.4T
Per slot (SUP-2)
6
Slots (4 LC + 2 SUP)
400G
Line cards (SUP-2)

Overview

Quick Answer: The Catalyst 9600 is Cisco's modular fixed-configuration core for campus distribution and collapsed-core designs. The C9606R chassis carries redundant supervisors and up to four line cards. The supervisor sets per-slot bandwidth and features, so choose C9600-SUP-1 or the higher-capacity C9600X-SUP-2 before selecting line cards.

The C9606R is a six-slot chassis: two dedicated supervisor slots (3 and 4) for redundancy, and four line-card slots (1, 2, 5, and 6). It runs IOS XE with StackWise Virtual, MACsec-256 encryption on the UADP ASIC, and the full Catalyst campus feature set. Because line cards such as the C9600-LC-48YL run at different speeds depending on the supervisor, the supervisor decision drives both bandwidth and long-term 400G readiness.

Sizing rule: Choose the supervisor first — C9600X-SUP-2 gives 6.4 Tbps per slot and 400G line-card support, while C9600-SUP-1 gives 2.4 Tbps per slot and does not support QSFP-DD 400G cards.

Hardware & Line Cards

Quick Answer: The C9606R holds two supervisors (slots 3 and 4) and four line cards. Options span the C9600-LC-48YL (25/10/1G, 50G with SUP-2), LC-24C (40G/100G), LC-48TX multigig copper, LC-48S 1G, LC-40YL4CD with 400G uplinks, and the C9600X-LC-56YL4C and LC-32CD 400G cards. SSDs come in 240, 480, and 960 GB.

Item Detail
ChassisC9606R — 6 slots (4 line-card + 2 supervisor)
Supervisor slots3 and 4 (redundant)
SupervisorsC9600-SUP-1, C9600X-SUP-2
C9600-LC-48YL48x 50/25/10/1G SFP56 / SFP28 / SFP+
C9600-LC-24C24x 40GE / 12x 100GE
C9600-LC-48TX48x RJ45 10/5/2.5/1G/100M
C9600-LC-48S48x 1GE / 100M
C9600-LC-40YL4CD40x 50/25/10/1G + 2x 100/40G + 2x 400/200/100G
C9600X-LC-56YL4C56x 50/25/10/1G SFP56 + 4x 100/40G
C9600X-LC-32CD32x 100/40G + 2x 400/200/100G
SSD storage240 / 480 / 960 GB
SoftwareIOS XE; StackWise Virtual
  • Line-card slots on the C9606R are 1, 2, 5, and 6; supervisors occupy 3 and 4.
  • QSFP-DD 400G line cards require the C9600X-SUP-2.
  • Redundant supervisors, hot-swap power supplies, and a fan tray support high availability.

Use Cases

Quick Answer: The Catalyst 9600 anchors campus core and distribution, collapsed-core designs, and high-density aggregation. Redundant supervisors and StackWise Virtual give a resilient two-chassis core, while 400G line cards on the SUP-2 future-proof uplinks. It aggregates Catalyst 9300 and 9200 access layers and connects to the data-center Nexus fabric.

Campus core / collapsed core

Resilient two-chassis core with StackWise Virtual; aggregate Catalyst 9300 access uplinks.

High-density distribution

48-port 25/50G line cards concentrate building distribution; add 400G uplinks with the SUP-2.

400G-ready uplinks

C9600X-LC-32CD and LC-40YL4CD bring 400G to the core for growth toward spine-class capacity.

Vs Catalyst 9500 and Nexus 9500

Step up from fixed Catalyst 9500; for the DC fabric see Nexus 9500.

Buying Checklist

Quick Answer: Choose the supervisor first (SUP-1 vs C9600X-SUP-2), then size line cards to port speed and density, decide on redundant supervisors, power, and SSD. Confirm 400G needs, MACsec, StackWise Virtual, and the IOS XE train and licensing (Network Advantage / DNA) before freezing the BOM. Plan optics separately from the line cards.

  1. Supervisor: C9600-SUP-1 vs C9600X-SUP-2 (per-slot bandwidth and 400G)
  2. Redundant supervisor for high availability
  3. Line-card mix by port speed and density (25/40/100/400G)
  4. 400G QSFP-DD requirement (requires SUP-2)
  5. Power supplies and fan tray for the C9606R
  6. SSD size (240 / 480 / 960 GB)
  7. MACsec-256 and StackWise Virtual design
  8. IOS XE train and licensing (Network Advantage / DNA), plus optics

Search Cisco SKUs on SKU Lookup. For the full campus design, see the Catalyst campus guide.

Frequently Asked Questions

Quick Answer: Common questions cover Catalyst 9600 per-slot and system bandwidth, the difference between SUP-1 and C9600X-SUP-2, supported line cards, and where to source it. Choose the supervisor first, then line cards; confirm IOS XE and licensing on the quote. Match supervisor and line-card SKUs before you freeze CapEx.

The official Catalyst 9600 Series datasheet is on Cisco: nb-06-cat9600-series-data-sheet (cisco.com). This page is the RFQ table — supervisor bandwidth and line-card mix — so you size a campus core before opening Cisco's sheet. Confirm IOS XE and StackWise Virtual on the quote.

The C9606R chassis scales to 25.6 Tbps (12.8 Tbps full-duplex) with the C9600X-SUP-2, which provides 6.4 Tbps (3.2 Tbps full-duplex) per line-card slot. The original C9600-SUP-1 provides 2.4 Tbps (1.2 Tbps full-duplex) per slot and up to 9.6 Tbps of system capacity.

The C9600-SUP-1 uses the UADP 3.0 ASIC and drives 2.4 Tbps per slot, supporting 25/10/1G on the LC-48YL. The higher-capacity C9600X-SUP-2 provides 6.4 Tbps per slot, unlocks 50G on the LC-48YL, and enables 400G QSFP-DD line cards that SUP-1 does not support.

Line cards include the C9600-LC-48YL (48x 25/10/1G, 50G with SUP-2), C9600-LC-24C (24x 40G / 12x 100G), C9600-LC-48TX (48x multigig copper), C9600-LC-48S (48x 1G), C9600-LC-40YL4CD (40x 50/25/10/1G plus 100G and 400G uplinks), and the C9600X-LC-56YL4C and C9600X-LC-32CD for 400G designs.

Contact info@benquan.hk or request a quote for a free BOM compatibility and delivery-risk review.

Key Takeaway

Key Takeaway: The Catalyst 9600 (C9606R) is Cisco's modular campus core: up to 25.6 Tbps system and 6.4 Tbps per slot with the C9600X-SUP-2, or 2.4 Tbps per slot with SUP-1. Choose the supervisor first — it sets bandwidth and 400G readiness — then line cards. BENQUAN GLOBAL LIMITED supplies Catalyst 9600 chassis, supervisors, and line cards with competitive pricing.

Not sure your BOM is optimal?

If you are unsure whether your Catalyst 9600 supervisor and line-card BOM are optimal, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents