Quick Take
Quick Take: Planning a Wi-Fi 7 or 25G campus refresh on Cisco Catalyst 9300X? Take C9300X-48HX for 10G mGig with 90W UPOE+, or C9300X-24Y for 25G fiber aggregation. Your BOM must name StackWise-1T cables and C9300X-NM-2C uplinks. Equalize stacking and license years on the RFQ.
Key extractable numbers
Catalyst 9300X BOM anchors on this page: C9300X-48HX = 48 mGig with 90W UPOE+ (about 1440W PoE budget class); C9300X-48TX drops PoE; C9300X-24Y for 25G fiber aggregation on shared UADP 3.0. RFQ must name StackWise-1T cables and C9300X-NM-2C uplinks, then equalize stacking kits and license years—do not quote bare chassis alone.
Main Switch Models
Quick Answer: The family splits into multigigabit UPOE+ copper models and SFP28 fiber aggregation models on a shared UADP 3.0 architecture. C9300X-48HX offers 48 multigigabit ports with a 1440W PoE budget, C9300X-48TX drops PoE, and C9300X-24Y and C9300X-12Y provide 25G fiber downlinks. All support StackWise-1T.
| Model SKU | Downlink Port Density | PoE Power Budget | Stacking Bandwidth | Uplink Module Support |
|---|---|---|---|---|
| C9300X-48HX | 48x 100M/1G/2.5G/5G/10G mGig | 90W UPOE+ (Up to 1440W) | 1 Tbps (StackWise-1T) | C9300X-NM-8Y, 2C, 4C |
| C9300X-24Y | 24x 25G/10G/1G SFP28 Fiber | None (Data Only) | 1 Tbps (StackWise-1T) | C9300X-NM-8Y, 2C, 4C |
| C9300X-12Y | 12x 25G/10G/1G SFP28 Fiber | None (Data Only) | 1 Tbps (StackWise-1T) | C9300X-NM-8Y, 2C, 4C |
| C9300X-48TX | 48x 100M/1G/2.5G/5G/10G mGig | None (Data Only) | 1 Tbps (StackWise-1T) | C9300X-NM-8Y, 2C, 4C |
Overview
Quick Answer: The Catalyst 9300X is Cisco's flagship 1RU stackable access and aggregation platform, built for 10G multigigabit Wi-Fi 7 access points, 90W UPOE+ power and modular 100G uplinks. Its UADP 3.0 ASIC doubles stacking bandwidth to 1 Tbps and brings QSFP28 uplinks into a stackable campus switch.
Decision fork vs classic 9300: Catalyst 9300 vs 9300X buying guide. Cost-optimized access peers stay on Catalyst 9200; fiber cores stay on Catalyst 9500.
As enterprise networks transition to multi-gigabit access layer standards (2.5G/5G/10G) for Wi-Fi 6E/7 access points and high-throughput security cameras, legacy 1G switches create bandwidth bottlenecks.
Powered by Cisco's custom UADP 3.0 ASIC, the Catalyst 9300X doubling stacking bandwidth to 1 Tbps (StackWise-1T) while introducing modular 100G QSFP28 uplink interfaces directly in stackable campus switches.
StackWise-1T & Uplinks
Quick Answer: StackWise-1T carries 1 Tbps of bidirectional stack bandwidth across up to eight switches, but it requires STACK-T1 cables because legacy Catalyst 9300 stack cables are not forward-compatible. Modular uplinks offer eight 25G ports via C9300X-NM-8Y, or two and four 100G QSFP28 ports via C9300X-NM-2C and 4C.
When designing Catalyst 9300X stacks, pay special attention to stacking cables and modular network uplinks:
StackWise-1T Stacking Cables
Catalyst 9300X requires STACK-T1-50CM, STACK-T1-1M, or STACK-T1-3M stacking cables. Legacy STACK-T1 cables from Catalyst 9300 switches are not forward-compatible with 1T speed requirements.
100G Network Uplink Modules
The C9300X-NM-2C module provides 2x 100G/40G QSFP28 ports, enabling direct 100G uplinks to Catalyst 9600 or Nexus 9300 core switches without requiring a dedicated chassis layer.
DNA Advantage Licensing
Quick Answer: Catalyst 9300X hardware mandates a Cisco DNA Advantage subscription in three, five or seven year terms, ordered alongside the switch. Unlike standard Catalyst 9300 models where DNA Essentials is available, the 9300X requires Advantage because of its 100G uplink bandwidth and full layer three routing including BGP, IS-IS, VRF and VXLAN.
Unlike standard C9300 models where DNA Essentials is available, Catalyst 9300X hardware requires **Cisco DNA Advantage** due to its 100G uplink bandwidth and full L3 routing (BGP, IS-IS, VRF, VXLAN) capabilities.
BOM Risk Checklist
Quick Answer: Four line items decide whether a 9300X stack deploys on schedule: dual Platinum power supplies sized for 90W UPOE+, StackPower cables to pool power across up to four switches, 100G QSFP28 optics for the uplink modules, and DNA Advantage licenses matching the hardware term.
Prevent site deployment delays by validating these 4 key BOM components:
1. Power Supply Sizing for 90W UPOE+
For fully populated C9300X-48HX PoE stacks, order dual PWR-C1-1900WAC-P Platinum power supplies per switch to supply full 90W power to high-draw Wi-Fi 7 access points.
2. StackPower Cable Allocation
Include StackPower cables (CAB-SP-50CM or CAB-SP-1M) to create a shared power pool across up to 4 switches, preventing PoE port shutdown during PSU failures.
Frequently Asked Questions
Quick Answer: The most common questions concern StackWise-1T cable compatibility, which is not backward-compatible with Catalyst 9300 stack cables, the prerequisites for 100G uplink modules, and mandatory DNA Advantage licensing. BENQUAN GLOBAL LIMITED validates the full Catalyst 9300X bill of materials and ships worldwide.
The official Catalyst 9300 Series datasheet is on Cisco: nb-06-cat9300-ser-data-sheet (cisco.com). This page is the RFQ table — C9300X-48HX / 24Y ports, StackWise-1T, and DNA Advantage — so you size before opening Cisco's sheet. Confirm STACK-T1 cables on the quote.
Catalyst 9300X switches feature upgraded UADP 3.0 ASICs providing 1 Tbps StackWise-1T stacking bandwidth (versus 480 Gbps StackWise-480) and support modular 100G QSFP28 uplink modules (C9300X-NM-2C and C9300X-NM-4C).
Catalyst 9300X hardware requires a minimum 3-year or 5-year Cisco DNA Advantage subscription (C9300X-DNA-A) to unlock 100G uplink module capabilities, full L3 routing (BGP, OSPF, VRF), and Cisco Spaces location analytics.
No. Catalyst 9300X switches require dedicated StackWise-1T stacking cables (STACK-T1-50CM, STACK-T1-1M, STACK-T1-3M) to achieve full 1 Tbps bidirectional stacking speed.
Send the chassis SKU, StackWise-1T cables, DNA term, quantity, and delivery window on one RFQ.
Key Takeaway
Key Takeaway: Freeze Cisco Catalyst 9300X-48HX for high-density 10G mGig Wi-Fi 7 campus access with 90W UPOE+. Select C9300X-24Y for 25G fiber aggregation. Ensure your BOM specifies StackWise-1T cables and DNA Advantage licenses. Quote stack members and license SKUs as separate lines. BENQUAN GLOBAL LIMITED supplies Catalyst 9300X with competitive pricing.