Campus Networking / Access Switching / PoE / mGig

How do I buy Cisco Catalyst 9300 from the datasheet worldwide?

Freeze Smart Account, C9300X vs C9300 vs C9300L, Network Essentials vs Advantage, StackWise, PSU, and optics on one authorized RFQ — then request worldwide shipping.

Quick Take

Quick Take: Buy Catalyst 9300 from the datasheet on an authorized RFQ: open a Cisco Smart Account, freeze C9300X versus C9300 versus C9300L, match Network Essentials or Advantage on every stack member, then add StackWise cables, PSU, and optics. Gray SKUs often cannot attach to CCW. Worldwide shipping from a free-port hub.

Key extractable numbers

Catalyst 9300 stack numbers on this page: up to 8 switches per stack at matching Essentials or Advantage license; C9300X uses StackWise-1T (1 Tbps; 480G if mixed with C9300), standard C9300 uses StackWise-480, C9300L/LM use StackWise-320 with fixed uplinks. Bundled PSU classes run from 350W to beyond 1100W—size wattage to UPOE/UPOE+ and mGig endpoint load, not port count alone.

Family Comparison

Quick Answer: Modular vs fixed uplinks is the first BOM fork — it also locks which StackWise speed you get. 1 Tbps (480G if mixed with C9300) Highest mGig / UPOE+ density; hardware IPsec on X Fixed (10G / 25G / 40G variants) Cost-optimized; stack only with other L/LM.

Figures follow the Cisco Catalyst 9300 Series datasheet. Confirm network modules, PSU wattage, and Cisco DNA / Catalyst software subscriptions on the quote. BENQUAN GLOBAL LIMITED supplies Catalyst switches, optics, and support. Related: Catalyst 9500, Catalyst 9200, Cisco UDI lookup, Arista 7050X3 / 7280R3, SKU Lookup. Request a quote.

Family Uplinks StackWise StackPower Notes
C9300XModular (10/25/40/100G, mGig options)1 Tbps (480G if mixed with C9300)Yes (larger budgets)Highest mGig / UPOE+ density; hardware IPsec on X
C9300Modular (10/25/40G, mGig)480 GbpsYesMainstream modular access
C9300L / LMFixed (10G / 25G / 40G variants)320 GbpsNoCost-optimized; stack only with other L/LM

Overview

Quick Answer: The 9300 is a 1RU IOS XE access switch built for PoE-heavy closets: Wi-Fi 6E radios, cameras and OT endpoints, with MACsec and application hosting on board. Choose between modular and fixed uplinks first, since that single decision also sets StackWise speed and whether StackPower pooling is available.

Popular Models (examples)

Quick Answer: Power class separates these SKUs more than port count: U delivers UPOE, H delivers 90W UPOE+, and UX or UXM mixes Multigigabit copper for Wi-Fi 6E. C9300X-48HX and 48TX carry the densest 10G Multigigabit. Bundled PSUs range from 350W to beyond 1100W, so size wattage against the real endpoint load.

SKU exampleAccess portsPower class
C9300-24T / 48T24/48× dataNo PoE
C9300-48P48× PoE+PoE+
C9300-24U / 48U24/48× UPOECisco UPOE
C9300-24H / 48H24/48× UPOE+90W UPOE+
C9300-24UX / 48UXMmGig + UPOE mixesWi-Fi 6/6E ready
C9300X-48HX / 48TX48× 10G mGig (± UPOE+)Highest density X SKUs
C9300L-48UXG-4XmGig + UPOE, fixed 4×10GFixed-uplink stack

Default PSUs vary (350W–1100W+). High PoE SKUs often need PSU upgrades — size wattage from the datasheet PoE budget tables.

Stacking tip: Do not mix fixed uplink (C9300L/LM) with modular C9300/C9300X. Higher-scale “B” SKUs only stack with like B models.

Stacking Rules

Quick Answer: Up to 8 switches, same software license level, dedicated StackWise cables (L/LM need stack adapters/kits). C9300L/LM ↔ same family @ StackWise-320 Modular StackPower for PSU pooling / redundancy. C9300L/LM ↔ same family @ StackWise-320 Modular StackPower for PSU pooling / redundancy Pick family by stack bandwidth and uplink style: C9300X = StackWise-1T + high mGig/UPOE+; C9300 = StackWise-480.

  • Cisco Catalyst Center Gen3 EOS & Gen4 Migration — B2B procurement & BOM risk guide
  • C9300X ↔ C9300X @ StackWise-1T
  • C9300X ↔ C9300 @ StackWise-480
  • C9300 ↔ C9300 @ StackWise-480
  • C9300L/LM ↔ same family @ StackWise-320
  • Modular StackPower for PSU pooling / redundancy

Use Cases

Quick Answer: Campus access, branch stacks, Wi-Fi 6/6E AP aggregation, and dense IoT/OT PoE closets. mGig + UPOE/UPOE+ SKUs (UX / HX) so APs are not speed- or power-starved. C9300-48P/U with modular 10/25G uplinks and StackWise-480 for IDF stacks. C9300L/LM when you know uplink speeds and do not need modular NM flexibility.

Wi-Fi 6/6E closet

mGig + UPOE/UPOE+ SKUs (UX / HX) so APs are not speed- or power-starved.

Standard enterprise floor

C9300-48P/U with modular 10/25G uplinks and StackWise-480 for IDF stacks.

Cost-optimized fixed uplink

C9300L/LM when you know uplink speeds and do not need modular NM flexibility.

How to Buy (Smart Account → DNA)

Quick Answer: Step 1 open a Cisco Smart Account for CCW. Step 2 freeze C9300X, C9300, or C9300L plus Network Essentials versus Advantage on every stack member. Step 3 lock the 3-year, 5-year, or 7-year DNA/Catalyst term. Step 4 add StackWise cables, PSU, optics, and worldwide shipping. See also authorized versus gray.

  1. Step 1: Cisco Smart Account / CCW — required to attach DNA/Catalyst subscriptions.
  2. Step 2: Network stack — C9300X vs C9300 vs C9300L/LM; Essentials vs Advantage on both members.
  3. Step 3: DNA / Catalyst software term (3/5/7-year) quoted with the chassis.
  4. Step 4: StackWise/StackPower cables, FlexStack-class PSUs, optics, worldwide shipping.

Search Cisco parts on SKU Lookup. Need UDI for licensing? See UDI lookup guide.

Which Part Numbers Should You Freeze on the RFQ (4 SKUs)?

Quick Answer: When quoting C9300L-48T-4G and sibling configurations across these 4 part numbers, lock the exact base MPN, redundant power supplies, optics, and matching 1-year or 3-year support tier on separate lines before comparing vendor discounts. Channel net pricing remains industry estimate / pending confirmation.

Ordering SKUKey Configuration & BoundaryAdjacent BOM Lines to Freeze
C9300L-48T-4G48×1G+4×1G SFP, StackWise-320 with L/LM only, Network Advantage vs Essentials, PSU, optics, DNA/Catalyst term.Essentials vs Advantage, 3 / 5 / 7 year DNA/Catalyst, 9300L stack adapter / cables, Second AC if redundant
C9300L-48T-4X-E48x1G data, 4x10G SFP+, StackWise-320, Network Essentials, 176 Gbps standalone. Not 48T-4G and not 48P-4X.C9300L-48P-4X-E, C9300L-48T-4G, C9300L-STACK-KIT / KIT2, SFP-10G per uplink
C9300L-48P-4X-E48x PoE+, 4x10G SFP+, StackWise-320, Network Essentials, ~505W PoE on 715W PSU. Not 9200L and not 48PF.715W / 1100W per load, C9300L-48PF-4X, C9300L-STACK-KIT / KIT2, SFP-10G per uplink
C9300-48S-E48x 1G SFP, modular NM, StackWise-480, 256 Gbps, Network Essentials, 715W AC. Not 9300L.C9300-NM-8X / 4G / 2Q / 2Y, STACK-T1-50CM class, PWR-C1-715WAC-P/2, 1G SFP + NM optics as drawn

Frequently Asked Questions

Quick Answer: Licensing is not optional: quote an Essentials or Advantage tier and term beside the chassis. Legacy 3850 stack cables do not carry over, and mixed-platform stacks are unsupported, so budget family-specific StackWise kits. The 9300 is a campus access platform, not a data center leaf switch like an Arista 7050X3.

The official Catalyst 9300 Series datasheet is on Cisco: nb-06-cat9300-ser-data-sheet (cisco.com). This page is the RFQ table — modular vs fixed uplinks, StackWise, and DNA tier — so you size before opening Cisco's sheet. Confirm StackWise cables on the quote.

Catalyst 9300 is sold with Cisco DNA / Catalyst software subscription options (Essentials/Advantage). Put the term and tier on the RFQ with the hardware.

Use Catalyst 9300 StackWise cables/kits specified for the family. Do not assume legacy 3850 cables or mixed stacks with older platforms.

9300 is campus access (PoE, StackWise, DNA). Arista 7050X3/7280R3 targets DC leaf/deep-buffer — see Arista comparison.

Use an authorized channel RFQ with a Cisco Smart Account, Network Essentials or Advantage term on both stack members, StackWise cables, PSU, and optics. Worldwide shipping from a free-port hub. Do not buy gray SKUs that cannot attach to CCW. See authorized versus gray.

Key Takeaway

Key Takeaway: Choose C9300X only when you need StackWise-1T or 25G and 100G uplinks; standard floors run C9300 with modular network modules, and known fixed uplink speeds make C9300L cheaper. Quote PSU wattage, StackWise kits and a license tier together. BENQUAN GLOBAL LIMITED supplies Cisco Catalyst 9300 switches with competitive pricing.

Not sure your BOM is optimal?

If you are unsure whether your BOM is optimal, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents