Networking / SKU Lookup

Does the Cisco catalog show 47,386 SKUs on 1 October 2026?

Catalog date 2026-10-01 replaces the 19 August product index. Product LIST that moved sits near +3.5%. Maintenance LIST clusters at +15% and +25%.

Quick Take

Quick Take: Cisco on SKU Lookup now shows catalog date 2026-10-01 and 47,386 product SKUs with LIST. The 19 August product index had 47,912. Product codes added 2,074 and removed 2,600. On codes kept in both indexes, 30,292 LIST prices are flat, 3,977 are up, and 14 are down. About 3,028 of those increases sit near +3.5%..

Re-validate every Cisco line on SKU Lookup before you freeze CapEx. For service years and delivery, send one mapped BOM via rfq.html?intent=bom-risk.

What This Delta Is

Quick Answer: This is a dated Cisco catalog revision, not a single list-price letter. Product Lookup moved from 19 August to 1 October. Maintenance renewals moved harder than switching and routing hardware.

Definition: BENQUAN SKU Lookup is the live Cisco part-number index. The catalog date on the page is the revision an RFQ should cite. The 1 October refresh changes both the part-number set and LIST on a minority of retained product rows. It is the index you check before a purchase order, not a promise of channel net.

Think of the BOM as two tickets. Hardware and licenses are one ticket. Maintenance is a second ticket that can reprice even when the chassis sticker barely moves. If a reseller applies the maintenance percent to every line, you overpay the hardware.

  • Fit this page: Open Cisco quotes still stamped August; renewal BOMs heavy on maintenance; Catalyst, routing, security, and UC lines that must match catalog date 2026-10-01.
  • Unfit: Readers who want one number for “Cisco went up X% on 1 October.” That sentence is false for most retained product SKUs.

Start on Cisco SKU Lookup and the Cisco vendor hub.

Catalog Numbers: 47,912 to 47,386

Quick Answer: Previous product index: 2026-08-19, 47,912 SKUs. New product index: 2026-10-01, 47,386 SKUs. Added 2,074. Removed 2,600. LIST is shown on these product rows. Channel net is not.

MetricValueBuyer note
Previous catalog date2026-08-1947,912 product SKUs
New catalog date2026-10-0147,386 product SKUs
Product SKUs added2,074New codes, not a price change
Product SKUs removed2,600Do not keep ordering a missing code
Retained product LIST3,977 up / 14 down / 30,292 flatSame part number in both indexes
Public LIST columnShown, USDLIST ≠ PO net

Channel net stays industry estimate / pending confirmation until a dated quote lands. A LIST increase on Lookup is a reason to re-quote. It is not the invoice.

August 19 vs October 1 Product LIST

Quick Answer: Most retained product LIST did not move. The increases that did move cluster near +3.5%, mainly on routers, switches, security, networking, and a smaller UC set.

Product LIST bandRetained SKUsWhat to do
Flat30,292Do not accept a blanket uplift on these lines
Near +3.5%3,028Routers, switches, security, networking, and some UC. Reprice the line, not the whole quote
Other ups911Mixed percents, including 25 lines near +15% and 13 near +25%. Read the row
Down14Rare. Do not assume a cut

One checked license, not a template for every code: SL-1101-NA/UNCP-K9 (Network Advantage uncapped license for the IR1101) moved from LIST 1,122.33 to 1,165.54, about +3.9%. Your chassis may be flat. Look up the exact code.

Limitation: Lookup LIST is a reference sticker. Region, deal registration, and service attach can change what you actually pay. Confirm the code, then confirm the commercial path.

Maintenance LIST Is the Sharp Move

Quick Answer: Maintenance service rows, loaded on demand rather than in the 47,386 product count, cluster near +25% (6,486 lines) and +15% (6,102 lines). That is a renewal problem, not a switch-price problem.

If your August quote is mostly Smart Net, support, or other maintenance, treat it as stale on 1 October. If the quote is hardware with a short service tail, reprice the tail and leave flat hardware alone.

Service rows also churned as codes: thousands of maintenance part numbers were added and thousands dropped. A renewal that “keeps last year’s service SKU” can fail Lookup even when the chassis is unchanged. Replace the missing service code. Do not invent a substitute from the description.

The on-demand service file holds 485,100 rows. Search the service SKU. Do not assume it is missing just because the first product screen does not list it.

Adds and Removals

Quick Answer: Product adds are 2,074 and product removals are 2,600. The largest buckets on both sides are routers, switches, and security, then networking.

Product familyAddedRemoved
Routers, switches, security8012,011
Networking329487
Unified communications29324
Wireless2556

Representative new product codes, not the full list: C9300L-OS-ESS (Catalyst 9300L OS Essentials) and C9300LM-48T-4Y-1A (Catalyst 9300L Mini 48-port data, Network Advantage, Fed-only). A commercial campus quote should not inherit a Fed-only mini chassis just because the code is new.

Representative removals: DNA-C-250M-P-3Y (DNA Premier Cloud, 3-year) and C1A1TN9300XF-1Y (Cisco ONE Advantage term for N9300, 1-year). If an open quote still carries those codes, replace them before the PO. Absence from Lookup means the 1 October index does not list them.

RFQ How-To Steps

Quick Answer: Cite 2026-10-01, validate on Lookup, reprice maintenance on its own, then send one BOM.

  1. Stamp the catalog date. Comparison sheets should say Cisco catalog 2026-10-01, 47,386 product SKUs.
  2. Validate codes. Open SKU Lookup → Cisco. Paste part numbers only.
  3. Split the two tickets. Mark each line hardware, license, or maintenance. Apply the +3.5% check only where Lookup LIST actually moved. Apply +25% or +15% only on maintenance rows that show it.
  4. Drop dead codes. Removed DNA Premier and Cisco ONE term lines need a current replacement, not a note that says “same as August.”
  5. Ignore Fed-only adds unless the ship-to and the contract are federal. C9300LM-*-1A is not a default commercial 9300.
  6. Submit. rfq.html?intent=bom-risk with quantities, service years, ship-to region, and need-by date.

Common Traps

  • One percent for the whole quote. 30,292 retained product prices are flat. A reseller who marks every line +25% is using the maintenance band on the wrong ticket.
  • August service SKU on an October PO. Maintenance codes were added and removed in the thousands. Lookup miss means replace the code.
  • Fed-only new chassis. New Catalyst 9300L Mini rows marked Fed-only do not belong on a commercial campus BOM.
  • LIST as the PO price. Cisco Lookup shows LIST. Your net is still pending confirmation until the quote is dated.
  • Placeholder stickers. Some new license rows show a token LIST such as 1.01. That is not a street price. Ask for the real commercial line.
  • DNA and Cisco ONE leftovers. Term licenses that left the index will not “still order” because last quarter’s quote listed them.

Frequently Asked Questions

Yes. Catalog date 2026-10-01, 47,386 product SKUs with LIST. The previous product index was 2026-08-19 with 47,912 SKUs. Maintenance loads on demand and is outside that product count.

No. Retained product LIST is 3,977 up, 14 down, and 30,292 flat. About 3,028 increases are near +3.5%. The +25% and +15% clusters are maintenance service rows.

Re-validate the part numbers. Reprice only the lines whose LIST moved, plus any maintenance tail. Flat hardware does not need a +25% markup.

The default Cisco index is the 47,386 product SKUs. Maintenance and technical service rows, 485,100 of them, load when you search the service code. A miss after that search means the code left the 1 October index.

Submit the mapped BOM on rfq.html?intent=bom-risk with quantities, service years, and delivery window. BENQUAN returns a dated quote. Until that quote is issued, any channel figure is an industry estimate / pending confirmation.

References

Key Takeaway

Key Takeaway: Freeze Cisco BOMs against catalog date 2026-10-01 (47,386 product SKUs). Reprice maintenance where LIST jumped about 25% or 15%. Leave flat product lines alone, and check the roughly 3,028 product lines near +3.5% one code at a time. BENQUAN GLOBAL LIMITED supplies Cisco hardware, licenses, and support with worldwide shipping — send the mapped BOM via rfq.html?intent=bom-risk.

Not sure your Cisco BOM matches the 1 October catalog?

If maintenance years, removed DNA lines, or a +25% markup on flat hardware are sitting on the quote, request a compatibility and delivery check before you freeze CapEx.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents