Networking / Cisco ASR 1000 / EOL / RFQ

ASR1006 EOL: did ASR1006-X and ASR1009-X already pass last order on 31 July 2026?

Last Cisco POS order day is 31 July 2026. Match chassis and line-card PIDs before that date.

Quick Take

Quick Take: Both chassis hit end of sale on 31 July 2026. An “ASR” line on a spreadsheet is not an order. Match ASR1006-X or ASR1009-X, then match every line card on the Cisco bulletin, and put support years on the same PO.

After 31 July 2026, treat new Cisco POS supply as closed for these chassis. Remaining paths are Refresh / residual stock with lead time pending confirmation.

What 31 July 2026 Actually Ends

Quick Answer: Cisco’s last day to order ASR1006-X and ASR1009-X hardware through Cisco point-of-sale is 31 July 2026. That is an end-of-sale date for the named chassis bulletins — not a blanket death date for every product with “ASR” in the name.

Buyers keep asking for a “Cisco ASR quote” as if one PID covers a family. It does not. ASR 900, ASR 920, ASR 9000, and ASR1001-X ride different bulletins and different dates. This page covers only ASR1006-X and ASR1009-X.

Fit: buyers with ASR1006-X or ASR1009-X on a 2026 PO who still need last-buy hardware or a sized Catalyst 8000 migration.

Unfit: ASR 9000 or NCS projects, or any RFQ that only says “ASR” without a chassis PID.

EOL Dates and Named Chassis PIDs

Quick Answer: End-of-Sale Date HW is 31 July 2026 for both bulletins. The ASR1009-X PDF announcement date is 30 April 2026. Named chassis PIDs include ASR1006-X, ASR1006-X=, ASR1006X-ACS, ASR1006X-ACS=, and ASR1009-X.

ItemPublished valueBuyer note
ASR1006-X End-of-Sale HW31 July 2026Last order through Cisco POS
ASR1009-X End-of-Sale HW31 July 2026Chassis and line cards on one PDF
ASR1009-X announcement30 April 2026On the chassis/line-card PDF
Named ASR1006-X PIDsASR1006-X, ASR1006-X=, ASR1006X-ACS, ASR1006X-ACS=Match the bulletin table
Named ASR1009-X PIDASR1009-XMatch every line-card PID on the live PDF
Post-EOS supplyCisco Refresh / residual stockLimited; lead time pending confirmation
  • Write the chassis PID on line 1 — never a bare “ASR” label.
  • Attach the bulletin URL that matches that chassis.
  • List every line-card / ESP / SPA PID from the bulletin that names it.
  • Put support years on the same PO while service contracts still protect TAC access per Table 1.

Cisco states that customers with active service contracts continue to receive TAC support per Table 1 of the bulletin. Quote the bulletin for support-end language; do not invent a last-support day that the page did not print into your brief.

Chassis End of Sale vs Line-Card End of Sale

Quick Answer: The ASR1006-X bulletin is a chassis EOL page. The ASR1009-X PDF covers chassis and line cards together. ESP and SPA PIDs are not automatically covered because a chassis date moved — you must read the PID table that names your card.

DimensionASR1006-X bulletinASR1009-X bulletin
Document typeChassis EOL HTMLChassis + line cards PDF
EOS HW date31 July 202631 July 2026
What to matchChassis PIDs on that pageChassis and every line-card PID on the PDF
BOM trapChassis swap without cardsAssuming one date covers unlisted cards
After EOSRefresh / residual onlyRefresh / residual only

If your spreadsheet still says “ASR spare kit,” stop. Open the bulletin, copy the PID strings, and make procurement defend every line against that table.

Migration Language That Is Safe to Write

Quick Answer: Cisco Technology Migration Program (TMP) may apply via the Cisco partner. Catalyst 8300 / 8500 are the public ASR 1000 successor family in Cisco’s edge platform positioning. Do not claim a 1:1 throughput replacement without a sizing exercise.

  • Keep the interface list: ports, optics, encryption, and QoS intent migrate better than model nicknames.
  • Size 8300 vs 8500: branch/edge vs high-throughput roles differ; force a throughput and feature matrix.
  • Do not invent “the” replacement SKU: Product Migration Options on the bulletin are the authority, not hallway folklore.
  • Last-buy vs migrate: some sites need one more chassis for spare coverage; others need a Catalyst cutover plan on the same CapEx cycle.

Equal brief rule

If one vendor column is last-buy ASR1006-X with five years of support, and the other is a Catalyst 8500 with a different interface map, stop ranking platforms. Equalize interfaces, encryption, and support years first.

How to Check an ASR1000 Chassis PID Against the July 2026 End-of-Sale Date

Quick Answer: Name the chassis PID, open the matching Cisco bulletin, match every line-card PID, put support years on the same PO, and size a Catalyst 8000 path in parallel without claiming a blind 1:1 swap.

  1. Step 1 — Name the exact chassis PID. Replace a bare “ASR” line with ASR1006-X or ASR1009-X (and spare PIDs such as ASR1006-X= when quoted).
  2. Step 2 — Open the matching Cisco bulletin. Use the ASR1006-X chassis EOL page or the ASR1009-X chassis-and-line-cards PDF for the July 2026 end-of-sale.
  3. Step 3 — Match every line-card PID. Do not invent ESP/SPA/line-card PIDs. Copy each live PID from the bulletin that names your card before PO.
  4. Step 4 — Put support years on the same PO. Active service contracts continue TAC per bulletin Table 1. Freeze support term with the last-buy hardware.
  5. Step 5 — Size the Catalyst 8000 path in parallel. Run a Catalyst 8300 or 8500 sizing with the old interface list. Do not claim a 1:1 throughput swap without that exercise.

Use SKU Lookup, then rfq.html. BENQUAN can dual-path last-buy versus Catalyst migration briefs with Worldwide Shipping when stock exists.

Real-World Deployment Scenarios

Quick Answer: Three scenes: a last-buy spare chassis before 31 July 2026, an ASR1009-X line-card refresh that ignored the PDF PID table, and a Catalyst 8500 migration that skipped interface sizing.

1) Last-buy spare for an installed ASR1006-X pair

Ops wants one cold spare before POS closes. Procurement freezes ASR1006-X / ASR1006-X= and support years on one PO. After 31 July 2026 the same ask becomes Refresh-or-residual with lead time pending confirmation.

2) ASR1009-X line-card add that only updated the chassis line

The RFQ changes the chassis string but leaves old card nicknames. The PDF that covers chassis and line cards is never opened. The PO fails at config validation. Fix: copy every card PID from the live PDF before CapEx.

3) Catalyst 8000 migration without interface math

Someone writes “replace with C8500” and stops. Throughput, crypto, and port density were never equalized. Run TMP language through the partner and size 8300 versus 8500 against the old interface list before you retire the ASR PO.

Frequently Asked Questions

Quick Answer: 31 July 2026 is not every ASR. Post-EOS supply is Refresh/residual only. Chassis dates do not auto-cover every card. Migration means Catalyst 8000 sizing, not a sticker swap.

No. This date is the ASR1006-X chassis bulletin and the ASR1009-X chassis-and-line-card bulletin. Other ASR families have different bulletins and dates.

Only if Cisco Refresh or remaining stock still exists. Treat lead time as pending confirmation.

Not automatically. Read the PID table on the bulletin that names your card.

A Catalyst 8000 edge sizing (8300 or 8500) plus the interface list from the old ASR, not a model-name swap.

References

Quick Answer: Cite the ASR1006-X chassis EOL page, the ASR1009-X chassis-and-line-cards PDF, and the ASR 1000 series hub so legal and procurement share one evidence pack.

Key Takeaway

Key Takeaway: Freeze ASR1006-X or ASR1009-X by exact PID before 31 July 2026, match every line-card PID on the matching bulletin, and put support years on the same PO. After that date, treat supply as Refresh or residual only. BENQUAN dual-paths last-buy and Catalyst 8000 sizing briefs with Worldwide Shipping.

Not sure your ASR last-buy BOM is optimal?

If chassis PIDs, line-card coverage, or Catalyst migration sizing are unclear, click below for a free compatibility and delivery risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk