Quick Take
Quick Take: On Catalyst 9800 controllers running Smart Licensing Using Policy (SLUP, IOS XE 17.3.2 and later), Cisco's current offline procedure is to turn license transport off, export a usage (RUM) report, upload it to Cisco License Central, and import the acknowledgement (ACK) file. Cisco's document 217348 says Specific License Reservation no longer exists in SLUP releases.
Permanent License Reservation (PLR) is documented generally for offline devices, but we could not confirm from the three Cisco pages reviewed that it applies to a 9800 on a current release. If a tender line says "PLR for 3,000 APs", ask for clarification before pricing.
Definition: Air-gapped licensing means a controller and its access points never contact Cisco directly; license usage is reported by carrying files between the closed network and a connected workstation, or covered by a reservation code. This article is based on three Cisco documents re-read on 17 October 2026: 221758, 217348 and lic226054. Where a point could not be tied to a Cisco page, it is marked unconfirmed. It names no customer and gives no price.
What is the tender line probably asking for?
Quick Answer: A tender line saying PLR usually means the controller and its access points must be licensed without ever contacting Cisco. Cisco documents two different offline mechanisms, usage reporting with files and license reservation, and they are not interchangeable, so the wording should be clarified before anything is priced.
Procurement teams in isolated networks often copy the phrase "PLR" from older Cisco licensing language. It usually means: "the controller and its access points must be licensed without ever contacting Cisco." The practical question is how Cisco now lets a closed network stay compliant. Cisco's documents give two different mechanisms, and they are not interchangeable.
Mechanism 1: offline reporting with RUM and ACK (document 221758)
Quick Answer: For Catalyst 9800 controllers on Smart Licensing Using Policy, Cisco document 221758 describes an offline path: turn license transport off, save a usage (RUM) report, upload it in Cisco License Central, then import the acknowledgement (ACK) file on the controller. Cisco says the procedure applies to all versions after 17.3.
Document 221758, "Configure Offline (Air-gapped) Licensing on 9800 WLC" (revision 4.0, 27 May 2026), describes the SLUP method. The steps are:
- On the controller, set the connection mode to air gap with
license smart transport off, then export usage withlicense smart save usage all file bootflash:rum.txt. - In Cisco License Central, go to Reports, then Usage Data Files, and upload the RUM report. A Download button for the acknowledgement then appears.
- Back on the controller, import the ACK with
license smart import bootflash:ACK_rum.txt.
Cisco states the procedure applies to all versions after 17.3 (the lab used a virtual 9800-CL on 17.9.5). After a license factory reset, wait at least one hour before generating the RUM report. If the upload fails, Cisco says the cause may be that the controller is already registered through a direct connection; delete it from the inventory and upload again.
Cisco's example show license status output lists default policy values, including "Reporting ACK required: yes", a 365-day first-report requirement for unenforced perpetual attributes, and 90-day first-report and reporting intervals for subscription attributes. That is example output from a lab device in 2024, so read your own device's policy rather than assuming these numbers.
Mechanism 2: reservation with SLR and PLR (document lic226054)
Quick Answer: Cisco document lic226054 explains reserving licenses with SLR or PLR in Cisco License Central, especially for offline environments, and needs PLR enabled on the Smart Account. The page is generic: it does not name the Catalyst 9800 or access points, and it carries two publication dates that do not line up.
Document lic226054 explains how to reserve licenses with Specific or Permanent License Reservation in Cisco License Central, "especially for offline (air-gapped) environments". Prerequisites: a Cisco.com account, access to the Smart Account, the reservation request code or device details, and PLR enabled on the Smart Account. If PLR is not enabled, Cisco says to open a licensing case in Support Case Manager. The flow is to generate a license authorization in Cisco License Central (by device identifier or by reservation request code), choose the code format, then install the authorization code on the device using the product's own configuration guide.
This page is generic. It does not mention the Catalyst 9800 or access points. It also carries two dates that do not line up ("Updated June 15, 2026" and an initial release of June 16, 2026), so treat the exact publication date as unclear.
Where the two documents pull in different directions
Quick Answer: Cisco's 9800 document 217348 states that there is no SLR any more under SLUP and recommends periodic manual usage reporting, so the 9800-specific pages point to RUM and ACK files. Whether PLR is offered for the 9800 on current releases is unconfirmed; ask Cisco which method fits your exact release and model.
Document 217348 ("Configure and Troubleshoot Catalyst 9800 Unified Licensing and Smart Licensing with SLUP", revision 15.0, 5 June 2026) says: "There is no Smart Licensing Reservation (SLR) anymore. Instead you can periodically report your usage manually." It also says SLR was deprecated from 17.3.2 and recommends moving to offline SLUP reporting after an upgrade.
| Question | Offline SLUP reporting (221758, 217348) | Reservation (lic226054) |
|---|---|---|
| What moves between the sites | RUM report out, ACK file back | Reservation request code out, authorization code back |
| Documented for the 9800 | Yes, all versions after 17.3 | Not named in the page; applicability unconfirmed |
| Prerequisite on the account | Smart Account and Virtual Account holding the licenses | PLR enabled on the Smart Account |
| Recurring task | Periodic usage reporting | Not described on the page |
So for a 9800 on a current release, Cisco's 9800-specific pages point to RUM and ACK. Whether PLR is offered for the 9800 on SLUP releases is unconfirmed from these sources. An older 9800 licensing guide covering SLR and PLR exists (we saw it only as a search result and did not re-verify it against today's releases), so the PLR wording in a tender may come from that era. The safe step is to ask the Cisco account team or licensing support which method applies to the exact IOS XE version and controller model in the bid.
What actually needs a license: the access points
Quick Answer: Cisco's 217459 guide says the 9800 controller itself needs no license, and the access points joined to it are the licensed items, with usage stored on the controller as RUM reports. A 3,000-AP tender should therefore name the AP license tier, the term, and the Smart and Virtual Accounts that will hold them.
Cisco's 217459 guide (air-gapped 9800 with Catalyst Center) states the 9800 controller does not need licensing and that the licensed items are the access points joined to it; their usage is stored on the controller as RUM reports. For a 3,000-AP project, the tender should therefore state the AP license tier, the term, and which Smart Account and Virtual Account will hold them.
Why compliance now matters more
Quick Answer: Cisco says unified licensing brings license enforcement for on-premises customers, with Day 0 enforcement for unlicensed APs and Day N enforcement for expired licenses in future releases, applied when the software image is updated. An air-gapped site that never reports usage may therefore meet enforcement at its next upgrade.
Document 217348 says unified licensing, available with Cisco Networking Subscriptions, introduces license enforcement for on-premises customers. IOS XE 17.15.2 (December 2024) was the first release supporting unified licensing with per-device reporting and compliance status. Cisco says future releases introduce Day 0 enforcement for unlicensed APs and Day N enforcement for expired licenses, applied when the software image is updated. In practice, an air-gapped site that never reports usage may meet enforcement at its next upgrade. The document also says that if APs still show Non-Compliant after correct SLUP setup, check that enough licenses were purchased and deposited into the correct Smart Account and Virtual Account. For a virtual 9800-CL, 217348 also flags a mandatory ACK requirement starting with IOS XE 17.7.1.
What we could not confirm
Quick Answer: Three points could not be confirmed from the Cisco pages reviewed: whether PLR is available for the Catalyst 9800 family on current IOS XE, any maximum AP count or special handling at 3,000 APs, and how HA pairs, RMA replacements and AP changes work under PLR. Confirm each with Cisco in writing.
- Whether PLR is available for the Catalyst 9800 family on current IOS XE: no first-hand source found.
- Any maximum AP count, or special handling for 3,000 APs: none stated in the three documents.
- How HA pairs, RMA replacements and AP count changes are handled under PLR: not covered. For SLUP, 217348 says a replacement controller is treated as a new device and the old device's license count must be released manually.
Who this article is for, and who it is not for
Quick Answer: Tender and bid teams, network architects and procurement staff answering a closed-network wireless licensing requirement for many access points are the audience. It does not serve buyers who need a binding Cisco entitlement statement or a price, because entitlements are created in the Smart Account and confirmed by Cisco.
For: tender and bid teams, network architects and procurement staff who must answer a closed-network wireless licensing requirement for a large AP count.
Not for: buyers who need a binding Cisco entitlement statement or a price. License entitlements are created in your Smart Account and confirmed by Cisco; we give no price and no guarantee about PLR eligibility.
Tender-response checklist
Quick Answer: A tender response should state the controller model and exact IOS XE release, the AP model, tier, term and quantity, the Smart and Virtual Accounts, and the offline method confirmed with Cisco. It should also name who carries the RUM file out of the closed network and how often, plus the plan for RMA, HA and AP additions.
- Controller model and exact IOS XE release
- AP model, license tier and term, and quantity
- Smart Account and Virtual Account that will hold the licenses
- Chosen offline method (RUM and ACK, or reservation) confirmed with Cisco
- Who carries the RUM file from the closed network to a connected workstation, and how often
- Plan for RMA, HA and AP additions
BENQUAN GLOBAL LIMITED supplies Cisco wireless hardware, sourced through authorized channels, and coordinates Cisco license orders from Hong Kong. We ship from our China and Hong Kong warehouses and support air freight and customs clearance. We do not issue the licenses ourselves.
Frequently Asked Questions
Per Cisco's 217459 guide, no. The access points joined to it are what you license.
Per 221758: set license smart transport off, save the usage report to a file, upload it to Cisco License Central, then import the ACK file on the controller.
No. PLR installs an authorization code through a reservation workflow; SLUP offline reporting exchanges RUM and ACK files. Cisco's 217348 says SLR is gone in SLUP releases, and PLR support for the 9800 on current releases is unconfirmed here.
Key Takeaway
Key Takeaway: For a tender asking for PLR on a 9800, Cisco's 9800-specific pages point to offline RUM and ACK reporting, while PLR support on current releases is unconfirmed. Clarify the method with Cisco before pricing 3,000 APs. BENQUAN GLOBAL LIMITED supplies Cisco wireless hardware sourced through authorized channels but does not issue the licenses.
References
Quick Answer: The article relies on three Cisco documents re-read on 17 October 2026: 221758, 217348 and lic226054. A fourth, 217459, was seen only as a search excerpt. Each claim is tied to its document, and points that no page confirms are marked unconfirmed in the text.
- Cisco, "Configure Offline (Air-gapped) Licensing on 9800 WLC", document 221758, rev 4.0, 27 May 2026 — www.cisco.com
- Cisco, "Configure and Troubleshoot Catalyst 9800 Unified Licensing and Smart Licensing with SLUP", document 217348, rev 15.0, 5 June 2026 — www.cisco.com
- Cisco, "How can I reserve a license for my device using SLR or PLR in Cisco License Central", document lic226054 — www.cisco.com
- Cisco, "Configure Catalyst 9800 WLC Smart Licensing Using Policy with Catalyst Center", document 217459 (read as a search excerpt only) — www.cisco.com
## References