Quick Take
Quick Take: Published Tbps figures on these gateways describe clustered or accelerated setups, so a quote sized on firewall throughput will under-deliver once IPS and TLS inspection are on. Threat prevention lands near 35 Gbps on the 19100 and rises through the 29200; Base and Plus differ on memory, storage and cage speed.
Performance Ladder
Quick Answer: 19100 → 19200 (19000 class) then 29100 → 29200 (29000 class) for higher NGFW/TP headroom. *Check Point published performance highlights. Hyperscale / cluster aggregates can be higher — confirm design with SE. Model — Firewall* — NGFW* — Threat Prevention* Quantum Force 19100 — 200 Gbps — 90 Gbps — 35 Gbps Quantum Force 19200 — 245 Gbps.
Figures follow Check Point Quantum Force product pages and datasheets (lab methodology varies). Always validate blade package (e.g., SandBlast SNBT), VS licenses, and cluster design on the quote. BENQUAN GLOBAL LIMITED supplies Check Point gateways and subscriptions. Related: FortiGate 6000F, PA-5400, F5 rSeries, SKU Lookup. Request a quote.
| Model | Firewall* | NGFW* | Threat Prevention* |
|---|---|---|---|
| Quantum Force 19100 | 200 Gbps | 90 Gbps | 35 Gbps |
| Quantum Force 19200 | 245 Gbps | 100 Gbps | 44 Gbps |
| Quantum Force 29100 | 365 Gbps | 130 Gbps | 60 Gbps |
| Quantum Force 29200 | 500 Gbps | 165 Gbps | 75 Gbps |
*Check Point published performance highlights. Hyperscale / cluster aggregates can be higher — confirm design with SE.
Overview
Quick Answer: Check Point's current high-end gateways, aimed at data center perimeter, internal segmentation, and heavy NGFW duty. The published Tbps headlines describe accelerated or clustered setups, so size against the threat prevention column instead. Enabling IPS, antivirus, sandboxing, and TLS inspection together cuts usable throughput sharply.
The 19000 and 29000 families replace earlier large Check Point appliance generations for DC perimeter, internal segmentation, and high-throughput NGFW use cases. Marketing headlines sometimes quote multi-hundred-Gbps or Tbps firewall figures that reflect accelerated or hyperscale configurations — treat the published Firewall / NGFW / Threat Prevention highlight table as the primary single-appliance comparison, then re-size with your policy mix.
Hardware & I/O
Quick Answer: A 2U chassis with dual power supplies, available in AC or DC. Base configurations typically ship eight SFP+ ports with 128 GB of memory and a single 960 GB NVMe drive; Plus roughly doubles memory and storage and opens 25G and 100G cages. Field-installable NIC cards cover the rest.
- Form factor: ~2U rack, dual AC PSUs typical; dual DC PSU kit available for 19000/29000.
- Management / sync: copper management ports plus SFP28 sync ports on published Base configs.
- Onboard data ports: Base often starts with 8×1/10G SFP+; Plus adds more SFP+, 10/25G, and (on top SKUs) 40/100G QSFP28.
- Memory / disk: Base commonly 128 GB RAM + 1×960 GB NVMe; Plus commonly 192 GB + 2×960 GB NVMe (model-dependent).
- Field NIC cards: CPAC-8-1/10F-D, CPAC-4-10/25F-D / -DA (accelerated), CPAC-2-40/100F-D.
- LOM / rails: Lights-Out Management and telescopic rails on Plus / option kits.
| Option class | Examples |
|---|---|
| Interface cards | 8×1/10G SFP+; 4×10/25G SFP28; 2×40/100G QSFP28 |
| Memory upgrades | 64 GB / 128 GB kits for 29000 class |
| Storage / PSU | 960 GB NVMe spare; AC or dual-DC PSU |
| Security package | SandBlast (SNBT) subscription commonly bundled on Base/Plus for year-1 |
Use Cases
Quick Answer: Data-center perimeter NGFW, east-west segmentation, and hyperscale clusters for bursty north-south traffic. 19200 or 29100 with 25/100G NICs facing leaf-spine; size on TP with SSL inspection enabled. 29200 Plus when threat prevention and port density both lead; add VS licenses for multi-tenant gateways.
DC / campus core firewall
19200 or 29100 with 25/100G NICs facing leaf-spine; size on TP with SSL inspection enabled.
High-throughput SandBlast edge
29200 Plus when threat prevention and port density both lead; add VS licenses for multi-tenant gateways.
Vs FortiGate 6000F / PA-5400 / F5
Multi-vendor RFQs: FortiGate 6000F, PA-5400, F5 rSeries (ADC vs NGFW roles differ).
Campus access pairing
Pair DC Force gateways with campus access such as Extreme 5520/5720 or Catalyst/CX when the RFQ spans LAN + security.
Buying Checklist
Quick Answer: Eight decisions, and the first one drives the rest: pick a threat prevention target rather than a firewall-only number. From there choose the model tier, Base or Plus, the NIC cards your fabric needs, clustering if throughput demands it, subscription years beyond the first, logging capacity, and power type.
- Threat prevention target (not firewall-only)
- 19100 / 19200 vs 29100 / 29200 headroom
- Base vs Plus port, RAM, NVMe, VS bundle
- NIC cards and optics for 10/25/100G fabrics
- Cluster / Hyperscale Network Security design if needed
- SandBlast and other blade subscriptions beyond year-1
- Smart-1 / Infinity management and logging capacity
- AC vs DC power, LOM, rails, and spare PSUs
Search security SKUs on SKU Lookup.
Frequently Asked Questions
Quick Answer: Three questions: how this line relates to the 16000 and 26000 appliances it succeeds, whether hyperscale clustering is necessary, and how to source it. Refresh quotes should name 19100 through 29200 rather than end-of-sale predecessors, and a single pair covers most sites without clustering.
The official Quantum Force 19100 datasheet is linked from Check Point's product page: checkpoint.com/quantum/force/19100. This page is the RFQ ladder — firewall, NGFW, and threat-prevention columns for 19100–29200 — so you size on threat prevention before opening the vendor PDF. Confirm SandBlast and VS licenses on the quote.
Quantum Force 19000/29000 is the current modular high-end line Check Point markets for new DC deployments. Refresh RFQs should quote 19100–29200 (or current midrange Force models) rather than end-of-sale predecessors — confirm lifecycle on each SKU.
Single appliances cover most mid/large sites. Hyperscale clustering is for elastic scale-out and resilience beyond a pair — add it only when throughput or availability requirements justify the fabric.
Contact info@benquan.hk or request a quote.
Key Takeaway
Key Takeaway: Quote a threat-prevention number first and let it choose the model: a 19200 or 29100 pair covers most data-center perimeters without Maestro clustering, and Plus is worth it only when 25G or 100G cages are in the design. BENQUAN GLOBAL LIMITED supplies Check Point Quantum Force gateways with competitive pricing and worldwide shipping.