Quick Take
Quick Take: Kazakhstan has the largest dated government target (186 MW in 2027 plus 109 MW in Q2 2028). Qazinform (19 October 2026) adds a Valley CapEx estimate of about USD 5 billion, Phase-1 215 MW fully reserved, and first 50 MW in Q2 2027 — keep those on a separate RFQ row from Firebird's U.S. export license for 45,000 Grace Blackwell GPUs and the third-quarter 2027 commercial-launch target. Do not merge 295 MW with Firebird's ~500 MW Phase-2 potential or with the Valley ~$5B CapEx line. Uzbekistan still has the earliest operating phase (12 MW targeted by end-2026). Every date below is a target, not a completed milestone.
Definition: A data center pipeline is the list of announced, financed and under-construction facilities, each with a capacity target and a date. This guide collects the flagship project for each Central Asian country in one table, separates reported figures from unconfirmed ones, and ends with an RFQ checklist for integrators and data center teams planning equipment orders. We do not retell Uzbekistan's TAS-1 facility here; that is covered in TAS-1 Tashkent Data Center: What Changes?
Key extractable numbers
Dated Kazakhstan targets on this page: 186 MW in 2027 plus 109 MW in Q2 2028. Qazinform (19 October 2026) adds a Valley CapEx estimate of about USD 5 billion, Phase-1 215 MW fully reserved, and first 50 MW in Q2 2027. Keep those MW rows separate from Firebird’s U.S. export-license framing for 45,000 Grace Blackwell GPUs and a third-quarter 2027 commercial-launch target—do not merge 295 MW with the GPU license story on one RFQ line. Hrazdan 12 MW in-service (Armenia, Mirror-Spectator 10 November 2026) is not this Kazakhstan license row — see Firebird 12 MW: sold out or 280 MW dirt.
The regional context: a proposed Common Computing Infrastructure
Quick Answer: The IICA reports that Uzbekistan's president proposed a Common Computing Infrastructure at a leaders' meeting of Central Asia and Azerbaijan. National data centers would be linked while each state keeps control of its own capacity. It remains a proposal: the IICA article gives no timetable or budget, so no regional milestone can be planned around it yet.
According to the Uzbekistan-based IICA, at the 8th Consultative Meeting of the Heads of State of Central Asia and Azerbaijan, President Shavkat Mirziyoyev proposed a Common Computing Infrastructure for the region. The idea is to link data centers built on each state's own computing capacity, so each country keeps control of its infrastructure while workloads and resources can be shared. This is a proposal. The IICA article gives no timetable or budget.
Country-by-country table
Quick Answer: Kazakhstan carries the largest dated targets, with 186 MW in 2027 and 109 MW in Q2 2028. Uzbekistan has the earliest operating phase, at 12 MW targeted by end-2026. Tajikistan, Kyrgyzstan and Turkmenistan list projects but no public MW figures in the sources reviewed, and every date shown is a target, not a completed milestone.
| Country | Flagship project | Reported scale and timing | Status (as reported) |
|---|---|---|---|
| Kazakhstan | Data Center Valley, Ekibastuz (Pavlodar region) | Designed to scale to at least 1 GW. Government target: 186 MW online in 2027 and 109 MW in Q2 2028 (295 MW total). Qazinform 19 Oct 2026: Phase-1 215 MW fully reserved; first 50 MW Q2 2027; Valley CapEx estimate ~USD 5 billion; power narrative from ~2.5 US¢/kWh | Construction under way; Phase-1 capacity reserved (ministry / Qazinform) — not a completed energisation |
| Kazakhstan | Akashi Data Center (Astana) | EDB financing USD 31.2 million (DCD 23 Oct 2026). Campus ~100MW planned; Phase-1 ~10MW targeted 2027; >4,200 racks; ~55,000 sqm; ~11 ha; Tier IV-quality claim as reported; project CapEx narrative ~USD 354m. Not Ekibastuz Data Center Valley. | EDB agreement announced Oct 2026; Phase-1 target 2027 — not a completed energisation |
| Kazakhstan | Freedom Data Center (Almaty) | Almaty in stages across 2026–2027 (IICA) | Construction initiated in 2026 (IICA) |
| Uzbekistan | DataVolt data center, Tashkent IT Park | 12 MW targeted by end-2026; planned to reach 300 MW later; up to USD 150 million financing from an international lender group | First phase under way |
| Uzbekistan | Alat (Bukhara region) 90 ha land sale | USD 350 million planned data center; 300 jobs. Investor, MW, power, cooling water, purpose and completion date undisclosed (Gazeta.uz 5 Nov 2026) | Land purchased — parameters undisclosed. Not DataVolt’s 25 ha Bukhara MoU. Not Beeline Kagan. |
| Uzbekistan | Shanghai LinkWise computing center, Takhiatash district, Karakalpakstan | First phase launched September 2026; expansion scheduled 2026–2027 | First phase launched (IICA) |
| Uzbekistan | Uzatom and Muroosystems | 50 MW data center powered by small modular reactors | Project announced December 2025 |
| Tajikistan | IT Hub Dushanbe (data center plus regional AI center) | No MW figure in sources | Construction began June 2026 |
| Kyrgyzstan | Thermal power plant with data center, Chon-Alai district | No MW figure in sources | Public–private agreement signed May 2026 |
| Turkmenistan | National data processing center | No MW figure in sources | Plans announced March 2026 |
Kazakhstan: the largest dated target, with caveats
Quick Answer: Kazakhstan's government target remains 295 MW by Q2 2028 (186 MW in 2027 plus 109 MW in Q2 2028 per Capacity, 6 October 2026). Qazinform (19 October 2026) restates Valley Phase-1 215 MW fully reserved, first 50 MW in Q2 2027, long-term 1 GW, and a ministry CapEx estimate of about USD 5 billion (some June narratives cited a larger package — keep CapEx rows dated and separate). Separately, NVIDIA's blog covering Firebird states a U.S. export license for 45,000 NVIDIA Grace Blackwell GPUs, Phase 1 commercial-launch target in Q3 2027, and ~500 MW Phase-2 potential. Do not add 295 MW + ~500 MW + Valley $5B into one CapEx cell.
Capacity reports that Deputy Prime Minister Zhaslan Madiyev gave the 186 MW and 109 MW figures at a government meeting in Astana on 6 October 2026. Power for Data Center Valley comes from the Ekibastuz GRES-1 plant. The same report notes that all Kazakh government data currently sits in a single 6 MW facility in Astana, so the step up is large.
Valley site update (Qazinform / ministry, 19 October 2026): after a site visit by Madiyev and Kazakhtelecom's Bagdat Mussin, the ministry said Phase-1 capacity of 215 MW is fully reserved, the first 50 MW data center is expected in Q2 2027, the cluster is planned to grow toward 1 GW, and total investment is expected around USD 5 billion. Qazinform also cites electricity rates starting as low as about 2.5 US cents per kWh as a site advantage — treat tariff as a reported narrative, pending confirmation on your PPA. Kursiv and other local coverage note that June messaging had referenced a larger (~USD 10 billion) agreement package with Firebird and NVIDIA; the October ~$5 billion line may measure a different scope. On an RFQ, print a dated Valley CapEx / reservation row separate from any Firebird Phase-1 CapEx quote.
6 November 2026 split (do not add it to the 19 October row): Xinhua, citing the prime minister’s press service, says phase 1 is three data centers totaling 304 MW — 68 MW, 164 MW and 72 MW — with operations targeted in Q2, Q3 and Q4 2027 in that order. The same report cites about USD 3.1 billion of annual export revenue, a KPMG figure of USD 115 billion over a 20-year operating life, a path to 1 GW by 2029, and an earlier government line of USD 10 billion with 100,000 GPUs. Interfax the same day, also citing the government press service, says phase-2 preliminary agreements with Gaw Capital, Boosteroid and Firebird cover 480 MW in the Pavlodar-region Valley. Xinhua adds a 620 MW potential on that phase-2 line, plus separate talks for another 240 MW (potential 420 MW). Neither report assigns the 164 MW hall to Firebird, and neither states a foundation or excavation percentage. Print this as its own dated row. Do not add 304 MW to 215 MW, to the 295 MW government total, or to Firebird’s ~500 MW phase-2 potential.
Firebird update (late October 2026): the NVIDIA Blog states Firebird has secured a U.S. export license for 45,000 NVIDIA Grace Blackwell GPUs for its Kazakhstan AI Factory. Phase 1 is under construction with Kazakhtelecom at Data Center Valley and targets commercial launch in the third quarter of 2027. A planned second phase would bring Firebird's total potential AI infrastructure capacity in Kazakhstan to approximately 500 megawatts. Firebird's own release also cites Phase 1 potential capacity up to 109 MW and an estimated USD 5 billion investment with more than 45,000 NVIDIA GB300 GPUs — treat CapEx and exact SKU nets as pending confirmation, and do not assume Firebird's $5B equals the ministry Valley $5B line. Earlier Capacity coverage still described a large Firebird package and a binding term sheet with Kazakhtelecom while noting that some Astana agreements were frameworks rather than closed investment; the license announcement does not by itself prove a hall is energised.
Installed base vs future license: the same NVIDIA Blog says Kazakhtelecom has already deployed 400 NVIDIA H200 and 480 NVIDIA B300 GPUs in Astana and Almaty, and plans more than 1,000 GPUs in Data Center Valley next year plus more than 1,000 NVIDIA Vera Rubin GPUs in the Ekibastuz region. Those “next year” lines are plans, not completed milestones. On an RFQ, print four separate columns: (1) government MW dates from Capacity, (2) Valley Phase-1 215 MW reserved / 50 MW Q2 2027 / ~$5B CapEx from Qazinform, (3) Firebird license / Grace Blackwell / GB300 / 2027 Q3 commercial-launch target, (4) currently installed H200/B300 counts. Merging 295 MW with ~500 MW potential or stacking two $5B lines double-counts the story.
On connectivity, Madiyev said the Trans-Caspian fibre-optic line between Kazakhstan and Azerbaijan is scheduled to launch in October 2026, with 390 km of cable laid between Sumgayit and Aktau and a design capacity of around 400 Tbps.
Akashi Astana update (DCD, 23 October 2026): Eurasian Development Bank agreed USD 31.2 million in financing with Akashi Data Center in Astana for a Tier IV-quality campus planned at about 100MW (more than 4,200 racks, about 55,000 sqm, about 11 ha), with roughly 10MW in phase 1 targeted for 2027 and a project investment narrative near USD 354 million. Keep this row separate from Ekibastuz Data Center Valley and from Firebird’s export-license / Grace Blackwell timeline. Soft net and OEM rack brands remain pending confirmation.
Uzbekistan: earliest operating capacity and the biggest commitment total
Quick Answer: Uzbekistan's ministry says data center investment commitments now exceed USD 6 billion, and a government computing cluster using NVIDIA technology reached 90% utilisation in its first month. DataVolt's 12 MW Tashkent facility is expected to be ready by end-2026, with 300 MW as the stated ultimate plan. Computing remains expensive for many local startups.
Euronews reports that Uzbekistan's Ministry of Digital Technologies says investment commitments for data centers now exceed USD 6 billion. A government computing cluster using NVIDIA technology launched this summer and reached 90% utilisation in its first month, according to the ministry; the minister said the next stage is being procured. DataVolt's 12 MW Tashkent facility is expected to be ready by the end of 2026, with a stated ultimate plan of 300 MW. Euronews also notes that computing remains expensive for many local startups.
Tajikistan, Kyrgyzstan and Turkmenistan: announced, not yet sized
Quick Answer: For Tajikistan, Kyrgyzstan and Turkmenistan, the reviewed sources give only the project type and the month it began or was agreed. No capacity or completion dates were published there, so any MW number is unconfirmed. Check official ministry announcements before using figures in a tender response.
For these three countries the only public information in our sources is the project type and the month it started or was agreed. We give no capacity or completion dates because none were published there. These figures are unconfirmed until each ministry publishes them, so check official announcements before putting numbers in a tender response.
How to read a pipeline announcement before you plan orders
Quick Answer: Read a pipeline announcement by checking four things: whether the date marks construction start, first-phase service or full capacity; what is binding, such as a term sheet versus a financing close; where the power line comes from; and who buys the IT equipment. These checks decide who sends the RFQ and how far a date can be trusted.
- Separate the date type. Is it construction start, first phase "ready for service", or full capacity? Kazakhstan's government 2027 and 2028 dates are commissioning targets; Firebird's third-quarter 2027 line is a commercial-launch target tied to a licensed GPU count — still not a completed hall.
- Check what is binding. A term sheet, an export license, a memorandum and a financing close carry different weight. Firebird's U.S. export license for 45,000 Grace Blackwell GPUs is a compliance gate, not proof the Data Center Valley hall is ready to receive freight.
- Keep MW stories on separate rows. Capacity's 295 MW government total and Firebird's ~500 MW Phase-2 potential are not additive. Print both; do not sum them on one CapEx line.
- Look for the power line. Capacity and power supply decide dates more than equipment does.
- Ask who buys the IT equipment. Operator, tenant or financier? The answer decides who sends the RFQ and who names the importer of record for any GPU line.
What this pipeline means for equipment sourcing (inference)
Quick Answer: Everything here is inference, not reported fact. Kazakhstan's 2027 dates and Uzbekistan's end-2026 target may bunch fit-out orders into the same quarters. Staged delivery to a warehouse is often safer than shipping to an unenergised hall, and GPU or AI server lines need export-control and end-user checks before any booking.
Everything in this section is our inference, not a reported fact.
- Timing clusters. Kazakhstan's 2027 commissioning dates and Uzbekistan's end-2026 target mean fit-out orders may bunch in the same quarters. Early BOM validation and spares planning matter more in a crowded window.
- Facility readiness decides delivery. Several sites are still under construction. Staged delivery to a warehouse is often safer than shipping to a hall that is not yet energised.
- Network and optics lines stretch first. New halls need switching, firewalls, storage and optics together.
- Compliance is per line item. GPU and AI server lines need export-control and end-user checks, and the importer of record must be named before booking.
BENQUAN GLOBAL LIMITED operates from Hong Kong with China and Hong Kong warehouses and supports air freight and customs clearance coordination for IT equipment from brands such as Cisco, HPE, Lenovo, Fortinet, F5 and NVIDIA, sourced through authorized channels. Import permits and clearance remain the responsibility of the importing party and its licensed local broker.
Who this guide is for, and who it is not for
Quick Answer: Integrators, tender teams and data center operators who need a dated regional overview before validating a BOM are the audience, along with procurement staff judging which sites may order in which quarter. It does not serve anyone needing verified Tajik, Kyrgyz or Turkmen capacity figures, investment advice, or a legal view on customs and export rules.
For: integrators, tender teams and data center operators in the region who need a dated overview before validating a BOM; procurement staff comparing which sites are likely to order in which quarter.
Not for: anyone who needs verified capacity figures for Tajikistan, Kyrgyzstan or Turkmenistan (none were published in our sources), investment advice, or a legal view on customs and export rules. Confirm those with a licensed local customs broker and official sources.
RFQ checklist for Central Asia data center projects
Quick Answer: A Central Asia data center RFQ should list exact SKUs and quantities, the destination city and named importing party, the end user and parent company for any GPU line, the delivery window, Incoterms with clearance responsibility, and spares and support terms. Complete details up front make quotes easier to compare.
- Exact SKUs and quantities for servers, switches, firewalls, storage and optics
- Destination city and the named importing party
- End user and parent company for any GPU or AI server line
- Required delivery window, and whether staged delivery is acceptable
- Incoterms and who handles import clearance
- Spares and support terms
Frequently Asked Questions
Kazakhstan: 186 MW in 2027 and 109 MW in Q2 2028, per the government statement reported by Capacity. Data Center Valley is designed to scale to at least 1 GW.
The Uzbek minister said DataVolt's 12 MW phase will be ready by the end of 2026. This is a target, and it is worth re-checking before planning deliveries.
Not in the sources reviewed. IICA reports the project types and start or signing months only, so any MW number for these three countries is unconfirmed.
No. Keep them separate. Capacity still reports Kazakhstan's 186 MW in 2027 plus 109 MW in Q2 2028 (295 MW). The NVIDIA Blog states Firebird's U.S. export license for 45,000 Grace Blackwell GPUs, a third-quarter 2027 commercial-launch target for Phase 1 with Kazakhtelecom, and about 500 MW potential in a planned Phase 2. A license is not a hall-ready date.
No. Akashi is an Astana campus. DCD (23 October 2026) reports EDB financing of USD 31.2 million, about 100MW planned capacity, roughly 10MW in phase 1 targeted for 2027, and a project CapEx narrative near USD 354 million. Ekibastuz Data Center Valley is a separate Pavlodar-region / GRES-1 power story. Do not merge Akashi with Valley or with Firebird's Grace Blackwell license row.
Key Takeaway
Key Takeaway: Kazakhstan has the largest dated capacity targets and Uzbekistan the earliest operating phase, but every date is a target and three countries have no public MW figures. Use the pipeline as a planning aid, confirm each project with official sources, and send an RFQ brief. BENQUAN GLOBAL LIMITED supplies IT equipment sourced through authorized channels.
References
Quick Answer: The page rests on IICA (10 October 2026), Capacity (6 October 2026), Euronews (28 September 2026), Qazinform (19 October 2026 Valley CapEx / 215 MW reserved), Xinhua and Interfax (6 November 2026 phase split and phase-2 names), plus the NVIDIA Blog and Firebird release on the late-October 2026 Kazakhstan export-license update. Figures are attributed in the text; anything those sources do not state is marked unconfirmed.
- IICA (Uzbekistan), "Common Computing Infrastructure of Central Asia: From National Data Centers to a Regional Digital Ecosystem", 10 Oct 2026 — iica.uz
- Capacity, "Kazakhstan targets 295MW of data centre capacity by 2028 as Ekibastuz build begins", 6 Oct 2026 — capacityglobal.com
- Euronews, "AI infrastructure push draws $6bn in data-centre commitments", 28 Sep 2026 — www.euronews.com
- Qazinform, "Kazakhstan builds $5 billion AI data center hub in Ekibastuz", 19 Oct 2026 — qazinform.com (Phase-1 215 MW reserved; first 50 MW Q2 2027; ~USD 5B; ~2.5 US¢/kWh narrative)
- NVIDIA Blog, "Kazakhstan Expands Compute for Its AI Future" — blogs.nvidia.com (45,000 Grace Blackwell license; Q3 2027 Phase 1; ~500 MW Phase-2 potential; 400 H200 / 480 B300 installed)
- Firebird, Kazakhstan AI Factory license announcement, 23–24 Oct 2026 — firebird.ai
- Data Center Dynamics, "Akashi secures $31.2m financing from EDB for Kazakhstan data center", 23 Oct 2026 — datacenterdynamics.com (USD 31.2m EDB; ~100MW / ~10MW phase 1 2027; Astana — not Ekibastuz Valley)
- Xinhua, "Kazakhstan's Data Center Valley expected to generate 3 bln USD in annual exports", 6 Nov 2026 — english.news.cn (PM press service: 304 MW as 68/164/72; Q2/Q3/Q4 2027; 480 MW phase 2 with a 620 MW potential; separate 240/420 MW talks; 1 GW by 2029; USD 3.1 billion annual exports; KPMG USD 115 billion over 20 years; earlier USD 10 billion / 100,000 GPUs)
- Interfax-Kazakhstan, "Kazakhstan signs preliminary deals for 480 MW at Data Center Valley", 6 Nov 2026 — interfax.kz (Gaw Capital, Boosteroid, Firebird; 480 MW; Pavlodar; preliminary)