Quick Take
Quick Take: Cover the whole Broadcom 64G generation on one RFQ: G710, G720, G730, both X7 directors, and the 7850 WAN box on Fabric OS 9.x. Treat Dell, HPE, IBM, Lenovo, Hitachi, and TGStor as aliases. OceanStor SNS has no peer here. Start with the DS-7720B 24-port G720 kit; do not mix it with TGStor G720 on one PO.
What Brocade Gen 7 Is
Quick Answer: Brocade Gen 7 is the 64G ASIC generation, not a Dell nickname. Line rates auto-negotiate 8/10/16/32/64G per optic. Local latency is 460 ns including FEC on G710, G720, and G730. Huawei SNS stops at G620, G630, and X6. TGStor is an ordering path like Dell, not a second ASIC line.
Definition: Brocade Gen 7 is a Fibre Channel hardware generation — not an Ethernet IP-SAN appliance, not a Connectrix-only family, and not a 128G Gen 8 refresh wearing an older nickname. Broadcom publishes the official platforms: G710, G720, G730, X7-4, X7-8, and the 7850 extension switch. Dell Connectrix, HPE B-series, IBM b-type, Lenovo ThinkSystem, Hitachi Vantara, and TGStor publish product names for that same ASIC; they are ordering paths, not a second product line. Fabric OS 9.x is the ship train (G710 about 9.2.2; G720 9.0.1a+; G730 9.1.0b+; 7850 introduced 9.2.0). Fabric OS 10.x can still manage these boxes; management software is not a generation stamp.
Shared technology pillars (Broadcom G710 / G720 / G730 product briefs, X7 Director product brief, Dell DS-7700B sheet Rev July 2025, Hitachi QRG BC-0590EN December 2025):
- Speed: line rates 8.5 / 10.53 / 14.025 / 28.05 / 57.8 Gb/s full duplex; auto 8/10/16/32/64G per installed optic. Speed follows the optic and the peer. A 32G factory kit is still Gen 7.
- Latency: local switch 460 ns including FEC on G710 / G720 / G730 sheets. That is not Gen 8 580 ns at 128G.
- Optics: 64G SFP+ SWL / LWL / ELWL; 32G SFP+; 2×64G SFP-DD (SN) on G720 / G730 and on FC64-64. Hitachi QRG notes secure optics on Gen 7 and Gen 8.
- SFP-DD: G720 has 8 DD cages (16 ports); G730 has 16 DD cages (32 ports). Those cages are required to hit 64 / 128.
- Security: Secure Boot, TruFOS, FOS hardening (no root), Fabric Vision. “Autonomous SAN” is vendor language, not a PO deliverable.
- HA: dual hot-swap PSU on G720 / G730 / X7 / 7850. G710 uses a single fixed PSU.
- Management: SANnav Portal + Global View, Web Tools, CLI, REST, SNMP. Line-item SANnav seats.
- Software: Enterprise bundle is typically included on OEM kits (Fabric Vision, Trunking, Extended Fabric, IR; FICON CUP on G720 / X7 as published). Still quote support and TruFOS.
- FICON: G720 Dell sheet includes CUP; X7 directors and the 7850 mainframe bundle publish FICON paths. Do not promise FICON on G710 unless a dated quote says so.
- AnyIO / USF: FC64-48 on X7 can run up to 24 AnyIO ports per blade (64G SWL SFP+; 10/25/50GbE). Not on G710 / G720 / G730.
ICL mix: Gen 7 ICL is QSFP. Gen 8 ICL is OSFP. A Gen 8 chassis that must meet a Gen 7 ICL port needs a qualified OSFP-to-2×QSFP breakout. Gen 6 / 5 ICL to X7 uses Gen 6 4×32G QSFPs on Gen 7 ICL ports (Broadcom X7 Hardware Installation Guide). UltraScale ICL: up to 12 directors; full mesh up to 9; up to 4608 Fibre Channel ports (vendor). Cabling-reduction claim on the X7 brief is about 75 percent (vendor).
Huawei has no Gen 7 SNS. OceanStor SNS public family stops at G620 / G630 / X6 (SNS3664 / 3764 / 3696E / 560x / 570x). Do not invent SNS G710 / G720 / G730 / X7 / 7850 or 0235… Gen 7 codes. TGStor (Huacun Zhigu) is a separate channel product path that lists G710–G730 / X7 — it is not Huawei, and it is not a legal “official Broadcom authorized OEM” claim.
Official Full-Lineup Hardware Map
Quick Answer: Six Broadcom platforms are official Gen 7: G710, G720, G730, X7-4, X7-8, and 7850. Dell, HPE, IBM, Lenovo, Hitachi, and TGStor columns are aliases. There is no Huawei row. G720 reaches 64 ports only with SFP-DD; SFP+ alone stops at 56. Empty X7 chassis ship two control processors and two core routing blades only.
The table is Broadcom-first. OEM columns are aliases for the same ASIC, not extra products. Never mix OEM SKUs on one purchase order: R7M13A is not 210-AZLV, is not 8969-P64, is not 7D5JCTO2WW, and is not HD-G720-24-64G-F-Z.P. DS-7720B and TGStor G720 cannot share one PO. Empty X7 boxes are control processors plus core routing only. Blades, ICL, power supplies, fans, and cords are separate RFQ lines.
| Class | Broadcom | Dell | HPE | IBM MTM | Lenovo | Hitachi / channel | TGStor |
|---|---|---|---|---|---|---|---|
| Entry 1U | G710 | DS-7710B | SN3700B | SAN24B-7 8969-P24 | DB710S 7DHN | HD-G710-8-32G-0-L.P / HD-G710-8-64G-0-L.P | TGStor G710 |
| Mid 1U | G720 | DS-7720B | SN6700B | SAN64B-7 8969-P64/R64 | DB720S 7D5J | HD-G720-24-{32,64}G-{R,F}-Z.P | TGStor G720 |
| Dense 2U | G730 | DS-7730B | SN6750B | SAN128B-7 8969-P96/R96 | DB730S 7D9J | HD-G730-48-64G-{R,F}-Z.P | TGStor G730 |
| Director 8U | X7-4 | ED-DCX7-4B | SN8700B 4-slot | SAN256B-7 8961-F74 | ThinkSystem X7-4 7DB4CTO1WW | HD-X74-0002-Z.P | TGStor X7-4 |
| Director 14U | X7-8 | ED-DCX7-8B | SN8700B 8-slot | SAN512B-7 8961-F78 | ThinkSystem X7-8 7DB4CTO2WW | HD-X78-0002-Z.P | TGStor X7-8 |
| Extension 1U | 7850 | MP-7850B | pending official HPE QS | SAN42B-R7 8969-R42 | pending Lenovo Press | HD-7850-0001-Z.P / HD-7850-0002-Z.P | not listed |
HPE name traps that break receiving: SN6600B is G620 (Gen 6). SN6650B is a 32G mid / dense box, not G710. G710 is SN3700B. G720 is SN6700B. G730 is SN6750B. X7 is SN8700B (R6A97A / R6A98A — confirm which SKU is 4-slot versus 8-slot on the dated QuickSpecs; do not swap if the quote disagrees). There is no Huawei column on this map. The TGStor column is product names only (G710 / G720 / G730 / X7-4 / X7-8). The Q4 2026 TGStor line has no 7850. Part-number search lives on SKU Lookup (TGStor) — do not dump TG- MPNs on this OEM map.
Not Gen 7 — Gen 6, Gen 8, Huawei SNS
Quick Answer: G610, G620, G630, SN6600B, DS-66xx, 7810, and SAN18B-6 stay Gen 6. G820, X8, FC128-48, SN6800B, SN8800B, DS-8820B, and IBM 8634/8635 are Gen 8. Huawei SNS maps only to G620, G630, and X6. Fabric OS 10.x can manage Gen 7 hardware; that does not turn it into Gen 8.
The expensive alias on a 2026 RFQ is calling every current Brocade box “Gen 7.” Use the contrast list as a reject column, not as a shopping list.
- Gen 6: G610 / G620 / G630 / SN6600B / DS-66xx / 7810 / MP-7810B / HD-7810-* / SAN18B-6
8960-R18. - Gen 8: G820 / X8 / FC128-48 / SN6800B / SN8800B / DS-8820B / ED-DCX8 / IBM
8634/8635. - No public G830 / DS-8830B as of 2026-08-27. Do not invent a dense 1U to close a port gap.
- No Huawei SNS Gen 7. SNS stays G620 / G630 / X6.
| Model (contrast only) | Generation | Why it is off this RFQ |
|---|---|---|
| G620 / SN6600B / SNS3664 | Gen 6 | 32G ASIC; Huawei SNS peer, not Gen 7 |
| G630 / SNS3764 / X6 directors | Gen 6 | Huawei SNS ceiling |
| 7810 / MP-7810B | Gen 6 | 12×32G FC + 6×1/10GbE extension |
| G820 / DS-8820B / SN6800B | Gen 8 | 24/56, no SFP-DD, 128G ASIC |
| X8-4 / X8-8 / 8635 | Gen 8 | OSFP ICL; not 8961 |
Older IBM paper printed SAN64B-7 as 8960-P64/R64. The current IBM support matrix (Gen 7 family block) lists 8969-P64/R64. Write the current matrix. If a quote still prints 8960, treat the 8960-versus-8969 conflict as pending confirmation before you freeze the PO.
X7-4 / X7-8 — Blades, ICL, Empty Chassis
Quick Answer: Yes. An X6 chassis plus leftover X6 blades plus a CR64 pair is the official FOS 9.x X6-upgraded-to-X7 path. Do not order CR32 — it is already in the box. Keep CPX6. Factory X7 still ships CPX7 plus CR64. Fabric OS 10.x is not listed for that upgraded chassis.
Directors are the modular core of Brocade Gen 7. X7-4 is 8U, not 9U — 9U is the Gen 8 X8-4 habit. The chassis you receive is two control-processor blades plus two core-routing blades. Every port blade, every QSFP ICL kit, every power supply, and every fan tray is a line you can forget. X6 and X7 share the chassis, backplane, power supplies, and fans. An X6 chassis becomes X7 by swapping CR64 core-routing blades with the chassis offline. Factory X7 still ships CPX7 plus CR64. Availability design is 99.999 percent (vendor). FICON is an X7 path (vendor).
| Dimension | X7-4 | X7-8 |
|---|---|---|
| Height | 8U; 4 horizontal port-blade slots | 14U; 8 vertical port-blade slots |
| Max FC (FC64-48) | 192 × 64G | 384 × 64G |
| Max FC (FC64-64) | 256 × 64G | 512 × 64G |
| ICL | 16 QSFP → 64 interconnect | 32 QSFP → 128 interconnect |
| Chassis bandwidth | 15.7 Tb/s (FC64-48 + ICL) or 19.8 Tb/s (FC64-64 + ICL) | 30.9 Tb/s or 39.6 Tb/s |
| Empty chassis | 2 CP + 2 CR | 2 CP + 2 CR |
| PSU (Lenovo Press) | 2 PSU 1+1 | 4 PSU 2+2 |
| Hitachi QRG buy list | 2 fans + 2 PSU | 3 fans + 4 PSU |
| Availability design | 99.999 percent (vendor) | same |
CR32 versus CR64
Slot match is height-specific: X6-4 and the resulting X7-4 take two CR64-4; X6-8 and X7-8 take two CR64-8. Both slots must be the same generation. CR32 and CR64 must not share a chassis — Fabric OS faults the last inserted core blade. On Fabric OS 9.2.x, CPX6 is Yes on native X6 and on the upgraded X6 and No on factory X7; CPX7 is Yes on factory X7 and No on the upgraded X6.
| Blade | Generation | Native chassis | FOS 9.2.x | FOS 10.0.x | RFQ action |
|---|---|---|---|---|---|
| CR32-4 / CR32-8 | Gen 6 | X6-4 / X6-8 only | Yes on X6 only; No on factory X7 and on X6-upgraded-to-X7 | Not listed | Already in the X6 box. Not an upgrade part |
| CR64-4 / CR64-8 | Gen 7 | Factory X7-4 / X7-8; also the X6-upgraded-to-X7 path | Yes on factory X7 and on upgraded X6; No on native X6 | Yes on factory X7 only (no upgraded-X6 column) | The pair you order to field-migrate |
Cost-save BOM — X6 chassis + CR64 + X6 blades
Official path name: X6 Director Upgraded to X7. There is no public net price on this path, so do not write a dollar saving. After the swap, ports stay 32G until you buy FC64 blades. Factory X7 Secure Boot on CPX7 is not included. You still pay the CR64 pair, an offline window, TruFOS, and OEM labor.
| Line | What stays on the RFQ |
|---|---|
| Keep | X6 chassis, power supplies, fans, CPX6, leftover FC32-48 / FC32-64 / SX6 |
| Order | Two CR64-4 (X6-4) or two CR64-8 (X6-8). Ask the OEM for the Brocade X6 Field Migration Guide. Do not invent Dell, HPE, or IBM kit 210- or feature codes. |
| Later | FC64-48 / FC64-64 / FC32-X7-48 when you need 64G or a Fabric OS 10.x 32G blade |
| Do not order | A second empty X7 chassis, CPX7 into an upgraded X6, or CR32 |
| Fit | Need Gen 7 cores and later 64G blades, freeze CapEx on the chassis now |
| Unfit | Contract demands factory X7 plus CPX7 Secure Boot, or the target train is already Fabric OS 10.x (upgraded chassis not listed) |
Five official migrate steps (X7 FAQ / Field Migration Guide):
- Confirm Fabric OS 9.x and a valid TruFOS certificate.
- Take the chassis offline. Swap both CR32 blades for both CR64 blades of the matching height.
- Keep CPX6. After the FPGA load it displays as CPX6+.
- Follow the OEM Brocade X6 Field Migration Guide only. Do not invent a channel kit.
- Do not downgrade below Fabric OS 9.0.x. Fabric OS 10.x on this upgraded box stays pending. On dual fabric, move traffic to the other fabric first.
Official cost-save paths
Only these ten paths are official. Grey stock, mixed OEM part numbers, and Huawei SNS as a cheap Gen 7 substitute are not official cost-save.
| # | Path | RFQ rule |
|---|---|---|
| 1 | Field migrate (primary) | X6 chassis + CR64 + leftover X6 port blades + CPX6+. Fabric OS 9.x. |
| 2 | Factory X7 mix leftover blades | Buy empty X7 (CPX7 + CR64); park FC32-48 / FC32-64 / SX6; buy FC64 only for 64G slots. Fabric OS 9.2.x Yes. Fabric OS 10.0.x factory X7 still lists SX6 and FC32-X7-48, not FC32-48 / FC32-64. |
| 3 | 32G optics first | Gen 7 cages auto-negotiate. A 32G factory kit is still Gen 7. Do not buy a full 64G optic list while peers stay 32G. |
| 4 | Fixed-switch PoD, not day-one max ports | G710 8 to 24; G720 24 to 64 (last 8 need SFP-DD PoD); G730 48 to 128. |
| 5 | FC32-X7-48, not FC64-48, for 32G | 32G director ports on a Fabric OS 10.x train are FC32-X7-48, not FC64-48. |
| 6 | ICL, not blade ISL | ICL sits on the CR. X7 FAQ: up to about 33 percent more device ports and about 75 percent less cabling (vendor). Enterprise bundle is included; the only paid extra license is ICL PoD. X7-8 min 1 / max 4 kits; X7-4 min 1 / max 2. |
| 7 | X7 to a live X6 | BR-X7GEN6ICLKIT-100M-1 (8 × 4×32G QSFP plus the same ICL PoD). Do not buy a second X7 just to talk to X6. After an X6 is upgraded to Gen 7, use secure ICL optics; non-secure 32G QSFP MPN 57-1000351-01 / 57-1000480-01 are no longer supported (Scale-Out ICL guide). |
| 8 | Keep SX6 | SX6 stays on Fabric OS 9.2.x and 10.0.x X7 tables. Do not default to 7850. The 7850 is a 1U 64G / 100GbE extension box, not a free SX6 replacement and not a director. |
| 9 | Do not repurchase Enterprise bundle | X7 FAQ: Fabric Vision, Extended Fabric, Trunking, FICON CUP, 10G FC, and Integrated Routing ship included. Still quote ICL PoD, TruFOS, and support years. |
| 10 | Dual-fabric rolling window | Official CR-swap procedure: move traffic to the other fabric first. Not a grey path. |
Blades shared on both chassis: FC64-48, FC64-64 (SFP-DD), FC32-X7-48, FC32-48, and SX6 extension (16×32G FC + 16×1/10GbE + 2×40GbE). FC64-48 AnyIO: 24 ports per blade; needs 64G SWL SFP+. ICL rule (Broadcom Hardware Installation Guide): minimum 4 ICL ports (2 per CR) between a chassis pair; add in pairs. ISL and ICL are not concurrent between the same pair. Copy the OEM PSU / fan table that matches the contract — Lenovo Press and Hitachi QRG disagree on how they phrase the buy list; they do not give you license to invent a third count.
The X7 FAQ (March 2024) states that X6 and X7 share the chassis, so leftover FC32-48, FC32-64, and SX6 can install; FC32-X7-48 is the Gen 7 32G blade and is not the same part as FC32-48. The 9.2.x Supported Blades table still marks FC32-48 and FC32-64 Yes on X7, while the 10.0.x X7 column keeps FC64-48, FC64-64, FC32-X7-48, SX6, CR64, and CPX7 and no longer lists FC32-48 or FC32-64 — SX6 remains listed, so do not write that 10.x dropped SX6. Write the target FOS train on the director line; leftover FC32-48 or FC32-64 stock is not certified on a 10.x train. IBM z17 note: FC32-48 is not supported for z17 and cannot share a logical switch with z17-connected channels (IBM FOS 9.2.2 qualification letter footnote e).
Dell: order ED-DCX7-4B / ED-DCX7-8B by marketing name plus airflow plus blade / ICL / PSU quantity. Public director 210-xxxx codes stay pending unless a dated Dell sheet prints them. HPE SN8700B chassis SKUs are R6A97A / R6A98A; blade / ICL / PSU SKUs stay pending official SN8700B QuickSpecs if they are not on the quote. Lenovo: 7DB4CTO1WW (X7-4) and 7DB4CTO2WW (X7-8). Blade FRU part numbers: copy Lenovo Press LP1587 only; otherwise pending.
Fixed Switches — G710, G720, G730
Quick Answer: G710 is 1U, 8 to 24, no SFP-DD, single fixed power supply. G720 is the hero 1U mid: 48 SFP+ plus 8 SFP-DD, 24 to 64, dual power supplies. G730 is 2U, 96 SFP+ plus 16 SFP-DD, base 48, scale to 128. A 32G factory kit is still Gen 7. HPE writes G720 as 56/24; Dell writes 24 to 64.
The hero RFQ entry is the G720 Dell OEM 24-port kit — Connectrix DS-7720B 24-port base scaling to 64. Write it as that string, not as the whole page. 32G-populated kits are still Gen 7. SFP+ only reaches 56; SFP-DD PoD is required to reach 64. That is the buyer trap versus Gen 8 G820 24/56 (no SFP-DD).
G710 / DS-7710B / SN3700B
1U. Scale 8 → 24 via two 8-port SFP+ PoD licenses. No SFP-DD. Access Gateway default is 16 F + 8 N (Broadcom G710 product brief). Dell DS-7710B sheet bandwidth is 3.072 Tb/s; HPE SN3700B page prints 1.536 Tbps. Same 24 × 64G ports; treat the split as full-duplex versus simplex convention and cite both — do not pick a winner. Power (Dell): max 105 W full / 45 W empty. Single integrated PSU plus 4 fans. Size (Dell): 428.8 × 42.9 × 306.6 mm; weight about 4.24 kg without optics. Latency 460 ns.
- Dell July 2025:
210-BNXXRTF + 8×32G + ENT + integrated FAN/PSU + rails;210-BNXYRTF + 8×64G + same extras. - HPE SN3700B:
S5A94A24/8 + 8×32G SW SFP28;S5A95A24/8 + 8×64G SW SFP56; PoDS5A96A(8-port + 32G) andS5A97A(8-port + 64G). - Lenovo DB710S
7DHN:7DHNCTO1WW/7DHNA001WW= 8p + 8×32G + lifetime;7DHNCTO2WW/7DHNA000WW= 8p + 8×64G + lifetime. No power cord in the box. - Hitachi:
HD-G710-8-32G-0-L.P/HD-G710-8-64G-0-L.P(lifetime). PoDXBR-SMED8G7POD-32G.P/XBR-SMED8G7POD-64G.P. RailsXBR-R000162.Pincluded.
G720 / DS-7720B / SN6700B — hero RFQ
1U. Hardware is 48 SFP+ + 8 SFP-DD (each DD = 2 ports). Scale to 56 with SFP+ only; 64 only with SFP-DD PoD. Sheet bandwidth 4.096 Tb/s. Latency 460 ns. ISL trunk 8 × SFP+ / 512 Gb/s. Power (Dell): 349 W full 64G / 57 W empty. Dual hot-swap PSU. Size: 440 × 43.9 × 355.6 mm; 7.17 kg with two PSU, no optics. FICON CUP included on the Dell DS-7720B sheet. Access Gateway: Dell lists 56 F + 8 N; Broadcom G720 product brief also lists 48 F + 8 N in one table — write Dell AG 56/8 and note the Broadcom 48/8 row as document variance / pending confirmation.
- Dell:
210-AZLVFTR + 24×64G + rails;210-AZLWRTF + 24×64G + rails;210-AZLTFTR + 24×32G + rails;210-AZLURTF + 24×32G + rails. - HPE SN6700B:
R6B05A56/24 + 24×32G exhaust;R6B06A56/24 + 24×32G intake;R7M13A56/24 + 24×64G exhaust;R7M14A56/24 + 24×64G intake. PoD:R6B09A8p+32G;R7M18A8p+64G;R8U65A16p SFP-DD (8 × SFP56-DD). - Lenovo DB720S
7D5J:7D5JCTO1WWexhaust 24×32G;7D5JCTO2WWexhaust 24×64G (FOS 9.0.1a+);7D5JCTO3WWintake 24×32G;7D5JCTO4WWintake 24×64G. No power cord in the box. - Hitachi:
HD-G720-24-32G-R-Z.P/-F-Z.P;HD-G720-24-64G-R-Z.P/-F-Z.P(36 months). PoD:XBR-MIDR8PTPOD-32G.P/XBR-MIDR8PTPOD-64G.P/XBR-MIDR16DDG7POD-64G.P.
G730 / DS-7730B / SN6750B
2U. 96 SFP+ + 16 SFP-DD = 128 ports. Base 48. Scale with 24-port SFP+ PoDs plus a 32-port SFP-DD PoD (any order). Sheet bandwidth 8.192 Tb/s. Latency 460 ns. Power (Dell): 969 W full 128G / 364 W empty. Dual hot-swap PSU, 80 Plus Gold. Size: 440 × 86.7 × 609.6 mm; 18.92 kg with 2 PSU + 3 fans, no optics. Heat at 128 ports: 3195 Btu/hr.
- Dell:
210-BELUFTR + 48×64G + rails;210-BELTRTF + 48×64G + rails. - HPE SN6750B: Store
R8U61A(48/128, 48×64G SW, exhaust). Intake twin pending if it is not on the dated quote — do not invent. PoD SKUs pending official SN6750B QuickSpecs if they are not printed on the RFQ. - Lenovo DB730S
7D9J:7D9JCTO1WW/7D9JA000WWexhaust 48×64G;7D9JCTO2WW/7D9JA001WWintake 48×64G. FOS 9.1.0b+. 3-year warranty. - Hitachi:
HD-G730-48-64G-R-Z.P/-F-Z.P. PoD:XBR-MENT24G7POD-64G.P/XBR-MENT32DDG7POD-64G.P.
7850 Extension versus Director versus Fixed
Quick Answer: The 7850 is a 1U FCIP and FICON extension switch, not a director and not a ToR core. Dell MP-7850B publishes 24 times 64G Fibre Channel, 16 times 1/10/25GbE, and two 100GbE ports, all enabled. It shipped on Fabric OS 9.2.0. Contrast the Gen 6 7810. HPE and Lenovo 7850 SKUs stay pending official paper.
Purpose: FCIP / IP Extension / FICON over WAN. Introduced on Fabric OS 9.2.0. Ports on Dell MP-7850B and Hitachi sheets: 24 × 64G FC + 16 × 1/10/25GbE + 2 × 100GbE. Dell sheet: all ports enabled (unlocked). 1U. Dual PSU. Includes Fabric Vision, Extension Trunking, ARL, IPsec, IR (Dell). It is not a core director. It is not Gen 8. Fabric OS 10.x can still manage it. Contrast Gen 6 7810 / MP-7810B: 12 × 32G FC + 6 × 1/10GbE.
- Hitachi:
HD-7850-0001-Z.Popen-systems (16×64G SW + Ethernet optics + ENT);HD-7850-0002-Z.Pmainframe (16×64G LW + FICON ENT + CUP + Advanced Accelerator). Port-side exhaust only on the QRG. 36 months. - IBM: SAN42B-R7
8969-R42. - HPE and Lenovo 7850 SKU / platform name: pending official paper. Do not invent an SN number.
Comparison — G710 through X7 plus G820 Neighbor
Quick Answer: Put G710, G720, G730, both X7 chassis, and 7850 on one equal-BOM table, with G820 as a Gen 8 neighbor. Directors win modular scale and AnyIO. G720 wins 1U mid density with SFP-DD. G710 is the single-PSU edge. 7850 is WAN extension only. Never treat 24/64 as G820 24/56.
Equal assumptions: dual fabric, support years written, optics counted per lit port, generation labeled on every column, and one OEM path per purchase order. Soft stickers stay industry estimate / pending confirmation. The Gen 7 route limitation is honest: G710 has one PSU, G720 needs SFP-DD to hit 64, an empty X7 quote is not a fabric, and 7850 does not replace a director. Versus Cisco MDS, this page is the Brocade column — peer MDS on the same port floor if the estate is dual-vendor.
| Dimension | G710 | G720 | G730 | X7-4 | X7-8 | 7850 | G820 (Gen 8) |
|---|---|---|---|---|---|---|---|
| Generation | Gen 7 / 64G | Gen 7 / 64G | Gen 7 / 64G | Gen 7 / 64G | Gen 7 / 64G | Gen 7 extension | Gen 8 / 128G |
| Form | 1U fixed | 1U fixed | 2U fixed | 8U director | 14U director | 1U WAN | 1U fixed |
| Port scale | 8 → 24 (no DD) | 24 → 64 (needs DD) | 48 → 128 | 192 / 256 | 384 / 512 | 24 FC + Ethernet | 24 → 56 (no DD) |
| Sheet bandwidth | 3.072 Tb/s (Dell) / 1.536 Tbps (HPE) | 4.096 Tb/s | 8.192 Tb/s | 15.7 / 19.8 Tb/s | 30.9 / 39.6 Tb/s | extension, not core | 7.168 Tb/s |
| Latency | 460 ns | 460 ns | 460 ns | director sheet | director sheet | WAN path | 580 ns @ 128G |
| PSU | Single fixed | Dual hot-swap | Dual hot-swap | 2 (1+1) | 4 (2+2) | Dual | Dual |
| ICL | None | None | None | 16 QSFP | 32 QSFP | None | None on 1U |
| AnyIO | No | No | No | FC64-48 | FC64-48 | No | Directors only |
| Dell alias | DS-7710B | DS-7720B | DS-7730B | ED-DCX7-4B | ED-DCX7-8B | MP-7850B | DS-8820B |
| Hero trap | Need redundant PSU | Call 24/64 a 24/56 | Invent G830 | Chassis-only quote | Chassis-only quote | Call it a director | 64G story on 128G ASIC |
Limitation of the G710 route: one integrated PSU and a 24-port ceiling. Limitation of the G720 route: 64 ports are not free — SFP-DD PoD plus matching optics must be on the BOM. Limitation of the director route: empty X7 plus hope is not a fabric. Limitation of a mixed-OEM quote: an HPE R7M line next to a Hitachi HD- line is two purchase orders pretending to be one. Limitation versus G820: if 128G is the primary ASIC, this page is the contrast column, not the buy.
OEM Ordering Appendix — Six Paths, No Huawei
Quick Answer: Pick one catalog before you type part numbers. Mixing an HPE SN6700B kit, a Dell 210- G720 row, IBM 8969, Lenovo 7D5J, Hitachi HD-G720, and TGStor G720 makes six POs. Leave ED-DCX7 210- strings, IBM feature codes, and any HPE 7850 name blank until official paper exists. Skip SNS.
Brocade Gen 7 is one ASIC family. The PO is not. Copy the table that matches the storage contract and leave the other tables on the shelf. Three items stay pending official paper and must not be guessed: Dell 210-xxxx for ED-DCX7-4B / ED-DCX7-8B, IBM reseller feature codes, and the HPE 7850 B-series SKU / platform name. Hitachi catalog reuses Broadcom channel part numbers from the Hitachi Vantara Brocade Quick Reference Guide (BC-0590EN, December 2025).
Broadcom channel / Hitachi Vantara
Same HD- / BR- / XBR- list. Empty X7 kits below include 36 months support and ship 0 PSU / 0 FAN / 2 CP / 2 CORE / 0 ports. Power cords are not in the chassis box.
| Role | SKU | What it is |
|---|---|---|
| Fixed bases | ||
| G710 32G / 64G | HD-G710-8-32G-0-L.P / HD-G710-8-64G-0-L.P | 8-port lifetime kits |
| G710 PoD | XBR-SMED8G7POD-32G.P / XBR-SMED8G7POD-64G.P | 8-port + optics |
| G720 32G / 64G | HD-G720-24-32G-{R,F}-Z.P / HD-G720-24-64G-{R,F}-Z.P | 36 months; R / F airflow |
| G720 PoD | XBR-MIDR8PTPOD-32G.P / XBR-MIDR8PTPOD-64G.P / XBR-MIDR16DDG7POD-64G.P | SFP+ and SFP-DD |
| G730 64G | HD-G730-48-64G-R-Z.P / HD-G730-48-64G-F-Z.P | 48-port base |
| G730 PoD | XBR-MENT24G7POD-64G.P / XBR-MENT32DDG7POD-64G.P | 24-port SFP+ / 32-port DD |
| X7 empty chassis | ||
| X7-8 chassis | HD-X78-0002-Z.P | Buy 3 fans + 4 PSU (Hitachi QRG) |
| X7-4 chassis | HD-X74-0002-Z.P | Buy 2 fans + 2 PSU (Hitachi QRG) |
| X7 blades | ||
| FC64-64 32×64G DD | BR-X764-2164.P | SFP-DD blade |
| FC64-48 48×64G SW / LW | BR-X764-2148.P / BR-X764-5148.P | 64G SFP+ |
| FC64-48 48×32G SW / LW | BR-X764-1148.P / BR-X764-3148.P | 32G SFP+ |
| FC32-X7-48 | BR-X732-2148.P / BR-X732-0148.P | 48×32G / 0 SFP |
| SX6 | HD-SX6-0001-Z.P / HD-SX6-0002-Z.P | Extension blade |
| ICL / 7850 | ||
| ICL kits | BR-X7ICLKIT-100M-01-Z.P / BR-X7GEN6ICLKIT-100M-01-Z.P / BR-X7ICLKIT-2KM-01-Z.P | X7-8 min 1 / max 4; X7-4 min 1 / max 2 |
| 7850 open / mainframe | HD-7850-0001-Z.P / HD-7850-0002-Z.P | Port-side exhaust only on QRG |
Dell Connectrix
Fixed-switch 210- codes are on the July 2025 DS-7700B sheet. Director 210- codes for ED-DCX7 are not on the public director sheets used for this page — order ED-DCX7-4B / ED-DCX7-8B by marketing name plus airflow plus blade / ICL / PSU quantity.
| Broadcom | Dell marketing name | Published SKU / how to order |
|---|---|---|
| G710 | DS-7710B | 210-BNXX (8×32G RTF); 210-BNXY (8×64G RTF) |
| G720 | DS-7720B | 210-AZLV / AZLW (24×64G FTR/RTF); 210-AZLT / AZLU (24×32G FTR/RTF). Hero = 24-port kit scaling to 64. |
| G730 | DS-7730B | 210-BELU (FTR 48×64G); 210-BELT (RTF 48×64G) |
| X7-4 / X7-8 | ED-DCX7-4B / ED-DCX7-8B | Marketing name + airflow + blade/ICL/PSU qty. 210- pending. |
| 7850 | MP-7850B | 24×64G FC + Ethernet unlocked on the Dell sheet |
HPE B-series
G710 = SN3700B. G720 = SN6700B. G730 = SN6750B. X7 = SN8700B. SN6600B is Gen 6 contrast only. HPE 7850 name stays pending official QuickSpecs.
| Role | SKU | What it is |
|---|---|---|
| SN3700B (G710) | ||
| 24/8 + 32G | S5A94A | 8×32G SW SFP28 |
| 24/8 + 64G | S5A95A | 8×64G SW SFP56 |
| PoD 32G / 64G | S5A96A / S5A97A | 8-port + optics |
| SN6700B (G720) | ||
| 56/24 + 32G | R6B05A / R6B06A | Exhaust / intake |
| 56/24 + 64G | R7M13A / R7M14A | Exhaust / intake |
| PoD | R6B09A / R7M18A / R8U65A | 8p+32G / 8p+64G / 16p SFP-DD |
| SN6750B / SN8700B | ||
| SN6750B 48/128 | R8U61A | 48×64G SW, exhaust. Intake / PoD pending official QS if not on the quote. |
| SN8700B chassis | R6A97A / R6A98A | 4-slot / 8-slot — confirm on dated QuickSpecs |
| 7850 | pending official HPE QS | Do not invent an SN number |
IBM b-type
Official matrix gives Machine Type / model. Reseller feature codes stay pending official IBM sales manual.
| Broadcom | IBM name | Machine type |
|---|---|---|
| G710 | SAN24B-7 | 8969-P24 |
| G720 | SAN64B-7 | 8969-P64/R64 (current matrix; older paper 8960-P64/R64 is pending confirmation if still printed) |
| G730 | SAN128B-7 | 8969-P96/R96 |
| X7-4 | SAN256B-7 | 8961-F74 |
| X7-8 | SAN512B-7 | 8961-F78 |
| 7850 | SAN42B-R7 | 8969-R42 |
| Feature codes | pending official sales manual | Do not invent codes |
Lenovo ThinkSystem
Machine types 7DHN / 7D5J / 7D9J / 7DB4. No power cord in the fixed-switch boxes. Director CTO frames ship CP+CR+rails only. 7850 SKU pending Lenovo Press.
| Role | SKU | What it is |
|---|---|---|
| DB710S 32G / 64G | 7DHNCTO1WW / 7DHNCTO2WW | Also 7DHNA001WW / 7DHNA000WW |
| DB720S exhaust 32G / 64G | 7D5JCTO1WW / 7D5JCTO2WW | FOS 9.0.1a+ on 64G |
| DB720S intake 32G / 64G | 7D5JCTO3WW / 7D5JCTO4WW | Intake twins |
| DB730S exhaust / intake | 7D9JCTO1WW / 7D9JCTO2WW | Also 7D9JA000WW / 7D9JA001WW; FOS 9.1.0b+ |
| X7-4 / X7-8 | 7DB4CTO1WW / 7DB4CTO2WW | 8U / 14U; blades from LP1587 only |
| 7850 | pending Lenovo Press | Do not invent a CTO |
TGStor (product names only)
TGStor G710, TGStor G720, TGStor G730, TGStor X7-4, and TGStor X7-8 sit on the same OEM map as Dell DS-7710B / DS-7720B / ED-DCX7. The Q4 2026 TGStor line has no 7850 — that cell is not listed. Do not paste TG- MPNs here. Search part numbers on SKU Lookup (TGStor). DS-7720B and TGStor G720 cannot share one PO. TGStor is a channel product path, not Huawei SNS, and is not a legal “official Broadcom authorized OEM” claim.
Fit / Unfit Decision Boundary
Quick Answer: Choose Gen 7 when the estate stays on 64G or 32G optics in Gen 7 cages and one OEM — Dell through TGStor — can cover G710, G720, G730, X7, or 7850. Skip it when 128G G820 or X8 is the primary ASIC, when Huawei SNS Gen 7 is required, or when G710 needs redundant power in one 1U box.
Fit Brocade Gen 7
- Estate stays on 64G, or will run 32G optics in Gen 7 cages, with Fabric OS 9.x confirmed.
- Need G710 edge, G720 1U mid, G730 128-port fixed, X7 core, or 7850 replication on one OEM path.
- Huawei channel is not required. Dual-fabric A/B with matching airflow.
- OEM path matches the storage contract (Dell Connectrix / HPE B-series / IBM b-type / Lenovo ThinkSystem / Hitachi / TGStor / Broadcom channel).
Unfit
- Need 128G / G820 / X8 as the primary ASIC.
- Need Huawei SNS “Gen 7” — that SKU does not exist.
- Mix 8969 with 8634 / 8635 on one PO, mix HPE + Hitachi + Dell part numbers on one PO, or put
DS-7720Band TGStor G720 on the same PO. - Call 7850 a director; call a 32G G720 kit “Gen 6”; invent G830.
- Choose G710 when the site needs redundant PSU in the same 1U box.
RFQ How-To Steps
Quick Answer: Write the generation first. If the contract is Huawei SNS, stop: there is no Gen 7 SNS. Then pick one OEM — Dell, HPE, IBM, Lenovo, Hitachi, or TGStor — and one form. Do not mix DS-7720B with TGStor G720. Lock airflow, optics, and X7 extras. Soft prices stay industry estimate pending confirmation.
- Step 1 — Freeze generation. Write Gen 7 (64G, Fabric OS 9.x), Gen 6, or Gen 8 on the first line. Do not let “current Brocade” stand in for a generation.
- Step 2 — Check Huawei SNS. If the storage contract is Huawei SNS, stop. There is no Gen 7 SNS. Dual-quote a Broadcom OEM path or keep SNS on Gen 6.
- Step 3 — Freeze OEM path, then form factor. Pick Broadcom/Hitachi, Dell, HPE, IBM, Lenovo, or TGStor — one vendor per PO. Then choose G710, G720, G730, X7-4, X7-8, or 7850. Do not put
DS-7720Band TGStor G720 on the same PO. TGStor 7850 is not listed. - Step 4 — Lock airflow. FTR or RTF on fixed kits; NPI or NPE on director PSU and fans. Mismatched kits fail receiving.
- Step 5 — Line-item optics. 32G versus 64G versus SFP-DD per lit port. Write PoD quantity. G720 64 ports require SFP-DD PoD. Use that OEM’s part numbers only.
- Step 6 — Add director extras. Write the target FOS train. Empty X7 ships CP and CR only. Add FC64-48 / FC64-64 / SX6 blades; if Fabric OS 10.x needs 32G, order FC32-X7-48. Do not assume leftover FC32-48 or FC32-64 are certified on a 10.x train. Add QSFP ICL kits, PSU and fan count, rails, SANnav, TruFOS, and support years.
- Step 7 — Field-migrate an X6 director to keep. If the estate is an X6 director to keep: field-migrate with CR64, not CR32; keep chassis, X6 blades, and CPX6; target Fabric OS 9.x; Fabric OS 10.x on that upgraded box stays pending.
- Step 8 — Duplicate dual fabric. Mirror Fabric A and Fabric B with identical airflow and optic counts.
- Step 9 — Label soft prices. Channel corridors = industry estimate / pending confirmation. Submit on rfq.html?intent=bom-risk before CapEx freeze.
Common RFQ Pitfalls
Quick Answer: The costly mixes are R7M13A on a Dell line, 8969 next to 8634, and a guessed HPE 7850 SKU. Other rejects include treating a 32G G720 kit as Gen 6, calling 7850 a director, inventing Huawei SNS G720, omitting SFP-DD when the design needs 64 ports, and mixing FTR with RTF.
- Mixed OEM PO: HPE R7M, Dell 210-AZLV, IBM 8969, Lenovo 7D5J, Hitachi HD-, and TGStor G720 lines are different catalogs. One vendor per order.
DS-7720Band TGStor G720 cannot share one PO. - Guessed pending SKUs: Dell ED-DCX7 210- codes, IBM feature codes, HPE 7850 name, and SN6750B intake / PoD if they are not on the dated quote.
- 24/64 versus 24/56: G720 + SFP-DD versus G820 SFP+ only. Different generations, different media.
- 32G kit called Gen 6: chassis generation is not the ship optic.
- G720 without SFP-DD: SFP+ alone stops at 56 ports.
- Airflow mix: FTR/RTF on the 1U pair, or NPI fans with NPE PSU on an X7, is a dock reject.
- 7850 as a director: it is WAN extension. It does not replace X7 blade count.
- Invented Huawei SNS Gen 7: SNS stops at G620 / G630 / X6.
- G710 HA miss: single fixed PSU. Do not promise redundant power in that 1U.
- Unlabeled soft prices: channel corridors without “industry estimate / pending confirmation” become fake public price claims.
- Leftover X6 blades on FOS 10.x: leftover FC32-48 or FC32-64 quoted onto a Fabric OS 10.x X7 as if they still appear on the 10.0.x Supported Blades table. Hardware can install; the 10.0.x X7 column no longer lists those two port blades.
- CR32 as an upgrade SKU: CR32-4 and CR32-8 are already seated in the X6. The field-migrate pair is CR64-4 or CR64-8. Do not add another CR32 line as the upgrade.
- CR32 plus CR64 mixed: Both core slots must match. Mixing CR32 with CR64 in one chassis faults the last inserted core blade.
- Fabric OS 10.x claimed on upgraded X6: The 10.0.x Supported Blades table lists factory X7 only. An X6 Director Upgraded to X7 stays on Fabric OS 9.x until a 10.x column exists.
Frequently Asked Questions
Quick Answer: Eleven questions cover alias traps, the X6-to-X7 migrate, and the TGStor X7 path. Huawei has no Gen 7 SNS. 24/64 is G720 with SFP-DD. A 32G kit stays Gen 7. Keep an X6 chassis only with CR64 on Fabric OS 9.x. TGStor sells X7-4 and X7-8 as product names, not a SKU dump.
No. Huawei OceanStor SNS public family maps to G620, G630, and X6 only (SNS3664 / 3764 / 3696E / 560x / 570x). There is no SNS G710, G720, G730, X7, or 7850. If the storage contract is Huawei SNS, dual-quote a Broadcom OEM path or keep SNS on Gen 6.
24/64 is Gen 7 G720 math: 48 SFP+ plus 8 SFP-DD cages. SFP+ alone reaches 56; SFP-DD PoD is required to reach 64. 24/56 is Gen 8 G820 math with SFP+ PoD only and no SFP-DD. Mixing the two strings on one PO mis-orders optics and licenses.
No. Chassis generation is not the ship optic. A G720 or G710 kit that leaves the factory with 32G SFP+ is still Gen 7 hardware. Speed follows the optic and the peer. Do not label a 32G-populated Gen 7 chassis as G620 or SN6600B.
No. Fabric OS 10.x can manage Gen 7 hardware. That does not change the ASIC generation. Gen 7 ships on Fabric OS 9.x (G710 about 9.2.2; G720 9.0.1a+; G730 9.1.0b+; 7850 introduced 9.2.0). Gen 8 G820 and X8 are a different hardware list.
No. Write the generation on line 1. IBM 8961-F74 / 8961-F78 are X7 (Gen 7). IBM 8635-F84 / 8635-F88 are X8 (Gen 8). Mixing those machine types on one purchase order is two generations pretending to be one fabric order.
No. The 7850 is a 1U FCIP / IP Extension / FICON WAN box (Dell MP-7850B / IBM SAN42B-R7 8969-R42). It is not X7-4, not X7-8, and not a ToR core. Do not substitute it for a director blade count.
G710 scales 8 to 24 with two 8-port SFP+ PoD licenses, has no SFP-DD, and uses a single fixed power supply. G720 scales 24 to 64, needs SFP-DD to hit 64, and ships dual hot-swap power supplies. Pick G710 only when 24 ports and a single PSU are acceptable.
Yes on hardware. The X7 FAQ says X6 and X7 share the chassis, so FC32-48, FC32-64, and SX6 can install. Fabric OS 9.2.x lists those blades on X7. Fabric OS 10.0.x keeps SX6 and FC32-X7-48 and drops FC32-48 and FC32-64. Do not assume leftover X6 port blades are certified on a 10.x train.
Yes on the FOS 9.x X6 Director Upgraded to X7 path. Keep the chassis, power supplies, fans, CPX6, and leftover FC32-48, FC32-64, or SX6 blades. Order two CR64-4 or two CR64-8. Do not insert CPX7. Fabric OS 10.0.x does not list that upgraded chassis.
No. CR32-4 and CR32-8 are the Gen 6 cores already in the X6. Field migrate by replacing both with CR64-4 or CR64-8. Do not mix CR32 with CR64 in one chassis. Do not treat leftover CR32 as an upgrade SKU.
Yes — TGStor X7-4 / X7-8, same ASIC path as Dell ED-DCX7. Also TGStor G710 / G720 / G730. No TGStor 7850 on the Q4 2026 line. Product names only on this page; do not dump TG- MPNs here. DS-7720B and TGStor G720 cannot share one PO. TGStor is a channel product path, not Huawei SNS, and is not a legal official Broadcom authorized OEM claim.
References
Quick Answer: Confirm platforms on Broadcom G710, G720, G730, and X7 product briefs, the Gen 7 switch FAQ, the Dell DS-7700B July 2025 sheet, Hitachi QRG BC-0590EN, IBM b-type matrix, HPE SN3700B and SN6700B collaterals, and Lenovo Press LP2064, LP1358, LP1563, and LP1587. Soft prices stay industry estimate.
- Broadcom — Gen 7 Switch FAQ (PDF)
- Broadcom — G710 Switch product brief (PDF)
- Broadcom — G720 Switch product brief (PDF)
- Broadcom — G730 Switch product brief (PDF)
- Broadcom — X7 Director product brief (PDF)
- Broadcom — X7 Director FAQ (PDF)
- Broadcom — Scale-Out ICL design guide (PDF)
- Broadcom — Fabric OS 9.2.x Supported Blades table
- Broadcom — Fabric OS 10.0.x Supported Blades table
- Broadcom — Brocade G720 switch product page
- Dell — Connectrix DS-7700B / DS-7710B spec sheet (July 2025)
- IBM — b-type SAN switch and Broadcom product matrix
- Broadcom — Hitachi Vantara Brocade Quick Reference Guide (SKU list)
- Lenovo Press LP2064 — ThinkSystem DB710S (PDF)
- Lenovo Press LP1358 — ThinkSystem DB720S
- Lenovo Press LP1563 — ThinkSystem DB730S
- Lenovo Press LP1587 — ThinkSystem X7-8 and X7-4 directors
- HPE — SN3700B (G710) collateral
- HPE — SN6700B (G720) collateral
- HPE Store — SN6700B (G720) product page
- Dell — MP-7800B / MP-7850B family spec sheet
Primary identity source: Broadcom Gen 7 product briefs + Dell DS-7700B July 2025 + Hitachi QRG BC-0590EN December 2025, reviewed 2026-08-27. Soft channel prices remain industry estimate / pending confirmation. This buying guide is not a published price list.
Key Takeaway
Key Takeaway: Quote Gen 7 when the estate stays on 64G and Fabric OS 9.x. Use G710 for 8-to-24 edge, G720 when SFP-DD must reach 64, G730 for 128-port fixed, X7-4 or X7-8 for blades and QSFP ICL, and 7850 for WAN. Copy one OEM catalog. BENQUAN GLOBAL LIMITED supplies Brocade G710, G720, G730, X7, and 7850 switches with competitive pricing.