Quick Take
Quick Take: Do not freeze a 2026 Dell Connectrix RFQ on Dell Floor alone. If the target net sits below Floor, write a Cost Relief (CR) line from Brocade/Broadcom. CR is not a PID and does not add 64G ports. PoD is another H1. BENQUAN replies in 1 business day. Channel net pending confirmation.
What is Cost Relief on a Connectrix quote?
Quick Answer: CR is Cost Relief. Think of Dell Floor as the lowest ticket the hotel front desk can print from its own system. Cost Relief is the brand HQ covering part of that ticket so the desk can print a lower rate for this project. It is not a room type. It is not a SKU.
Typical scene: a 64G dense Connectrix pack — DS-7730B class, ports and optics already frozen, support years already chosen — comes back with a Floor note. The target net sits below that Floor. Someone pastes “CR” into the SKU column as if it were a transceiver. That pack will not book. Write three rows: Floor, target versus Floor, Cost Relief yes or no. That is a typical procurement trap, not a named customer.
Dell sells Connectrix. The switch silicon and FOS family are Brocade (Broadcom). Floor is an OEM quote-system limit. Cost Relief is a project-specific extra cost cut from the switch vendor so the OEM can go below Floor. Recheck any quote older than 15 days. List, Floor dollars, and booked nets stay off this page. Channel net pending confirmation.
- Fit: Open Connectrix RFQs that named CR without saying Cost Relief; packs that treated Floor as the PO price; below-Floor targets with no vendor-relief flag; mixed PoD + CR on one line.
- Unfit: A how-to for filing or winning a CR approval; a PoD vs full-port decoder; a Gen 7 or Gen 8 PID map; MDS vs FOS bake-off; a public discount table.
Floor, Cost Relief, list — keep three columns
Quick Answer: Floor is OEM-printable off. CR is vendor Cost Relief so the OEM can go below Floor. List is not Floor. PoD is not CR. Empty cells are honest. Invented CR SKUs are not.
| Term on the sheet | Who sets it | What it is | RFQ action |
|---|---|---|---|
| Dell Floor | Dell quote system | Deepest off the OEM can print without extra vendor relief | Copy the Floor note if printed. Do not paste it into the net cell. |
| Cost Relief (CR) | Brocade / Broadcom on the project | Extra vendor cost cut so the OEM can book below Floor | Yes / no / already requested in writing. Not a PID. |
| List / recommended | OEM commercial list | Starting column. Not Floor. Not CR. | Keep it labeled. Do not mix with net. |
| Ports on Demand | License SKU family | Adds licensed ports. Other H1. | Do not use CR to buy missing 64G ports. |
| Support years / deploy | OEM service SKUs | PSNBD class years and professional services | Freeze with the BOM. CR does not rewrite them. |
If Floor is enough for the target, say so. Do not invent a CR request to look aggressive. If Floor is not enough, an empty CR cell that implies “the OEM will just print it” is the trap. Recheck any quote older than 15 days. Channel net pending confirmation.
What this page is not
Quick Answer: Not a CR-approval playbook. Not Ports on Demand. Not the Gen 7 or Gen 8 OEM map. Not MDS versus Connectrix. Not a public % OFF table. Not Palo Alto CVP.
Worldwide shipping and ex-stock free-port language on this site is not Cost Relief. A free-port pallet without Floor / CR fields is still an incomplete pack. Partner-internal CR notes stay off customer HTML. This page does not publish Floor dollars, booked nets, or unit counts from any live quote.
Typical use cases: who must act this week?
Quick Answer: Act if this week's Connectrix pack names CR as a SKU, treats Floor as the PO price, or sits below Floor with no relief flag. Do not wait for a fake CR PID.
Integrators: lock ports, optics, airflow, and support years first. CR will not add an SFP. Procurement: lead time on hardware is one field. Floor versus target net is a second field. Cost Relief eligibility is a third. Mixing them hides the gate.
- Below-Floor target: write CR yes/no and whether it was requested in writing. Empty is honest.
- Floor already covers the target: do not open a CR file to decorate the sheet.
- CR pasted as a PID: strike it. Put Cost Relief on the commercial row.
- PoD mixed in: missing ports stay on the PoD page. Do not buy ports with CR language.
- MDS dual-path: leverage on the sibling compare page. Not a CR substitute.
Buyer decision matrix
Quick Answer: If target sits at or above Floor, book against Floor. If target sits below Floor, freeze a Cost Relief flag before ranking quotes. If you do not know Floor, stop ranking.
| Situation | List posture | RFQ ask |
|---|---|---|
| Target at or above Dell Floor | OEM-printable | Copy Floor note. CR cell = not required. |
| Target below Floor, CR already requested in writing | Pending vendor relief | Keep the written flag. Do not invent a CR SKU. Net pending confirmation. |
| Target below Floor, no CR line | Incomplete | Add Cost Relief yes/no. Do not treat Floor as the booked net. |
| CR written in the SKU column | Mis-typed commercial path | Move CR to the commercial row. Freeze the real BOM. |
| PoD ports still missing | License gap | Use the PoD sibling page. CR does not add ports. |
How do you freeze Floor vs Cost Relief on one Connectrix RFQ?
Quick Answer: Copy Floor note, below-Floor flag, CR yes/no, model class, port/optic brief, and support years. Review target is 1 business day. No public net. Channel net pending confirmation.
- Step 1 — Write Dell Floor — Own field. Empty is honest. Do not paste Floor into net.
- Step 2 — Flag target versus Floor — At / below. Keep dollars off the public page.
- Step 3 — Name Cost Relief yes or no — Brocade/Broadcom project Cost Relief. Ask if it was already requested in writing.
- Step 4 — Keep PoD off this line — Missing 64G ports are a license problem, other H1.
- Step 5 — Freeze the BOM first — DS-7730B class or peer, port count, optic speed, airflow, support years. CR does not rewrite them.
- Step 6 — Send the three-column pack — Floor / target vs Floor / CR flag. Free-port language is not Cost Relief. Dual-path MDS stays on the compare page.
RFQ checklist
Quick Answer: Send model class, port/optic brief, support years, Floor note if printed, below-Floor flag, and whether CR is already requested. No public net. Not a CR-approval kit.
What to put on the RFQ
- Connectrix model class (example: DS-7730B family — confirm the exact SKU with the vendor)
- Port count and optic speed (64G class) plus airflow
- Support years and whether professional services are in or out
- Dell Floor note if the OEM sheet printed one
- Target versus Floor: at Floor / below Floor (no public dollars)
- Cost Relief: not required / requested in writing / unknown
- Strike-through any CR cell sitting in the SKU column
Submit on rfq.html. BENQUAN reviews equal Connectrix briefs in 1 business day. Recheck any quote older than 15 days. Worldwide shipping is not Cost Relief. Channel net pending confirmation.
Common RFQ pitfalls when CR shows up on a Connectrix sheet
Quick Answer: Buyers lose calendar when they treat CR as a PID, Floor as the PO price, or PoD as Cost Relief. Keep three columns. Do not ask this page how to game vendor approvals.
- CR in the SKU column: it is Cost Relief, not a transceiver.
- Floor pasted as net: Floor is OEM-printable off, not the booked price.
- Below Floor with a blank CR cell: incomplete pack.
- PoD mixed with CR: ports are a license H1.
- Invented CR PID: strike it.
- Free-port as Cost Relief: logistics is not vendor relief.
- MDS as a CR substitute: other H1.
- Public % OFF table: this page will not print one. Pending confirmation.
- This page as a CR-approval playbook: it is not.
Frequently Asked Questions
Quick Answer: CR is Cost Relief, not a SKU. Floor is not the PO price. PoD is not CR. MDS is not a CR substitute. No public % OFF. Channel net pending confirmation.
No. CR is Brocade/Broadcom project Cost Relief. It is not a PID, not a transceiver, and not a support year. It only decides whether an OEM quote can book below Dell Floor. Channel net pending confirmation.
No. PoD is a port-license product. Cost Relief does not add 64G ports. Keep PoD on the sibling licensing page. Mixing them on one RFQ line hides both gates.
Floor is the deepest off the OEM system can print without extra vendor Cost Relief. If your target net sits below Floor, freeze a CR yes/no field. Do not treat Floor as the booked net. Pending confirmation.
No. Freeze ports, optics, airflow, and support years first. CR is a commercial path, not a BOM change. Typical scene, not a named customer.
List, Floor, and net stay off public pages. Soft channel prices are industry estimates pending confirmation. Recheck any quote older than 15 days. BENQUAN maps equal briefs in 1 business day.
MDS is a different fabric OS path. Use it as sizing leverage on the sibling compare page. It is not a CR substitute and does not print a Dell Floor.
References
Quick Answer: Use Dell Connectrix B-Series public family sheets and Broadcom Fibre Channel switch pages to confirm the model class. Cost Relief is not printed as a customer SKU on those sheets. Recheck any quote older than 15 days.
- Dell — Connectrix B-Series DS-7700B / DS-7710B spec sheet (public family sheet; fetched 2026-10-20)
- Broadcom — Fibre Channel switches (Brocade family) (public SAN family index; fetched 2026-10-20)
- PoD licensing cost 2026 — port licenses, not Cost Relief
Key Takeaway
Key Takeaway: Freeze three columns on every 2026 Dell Connectrix RFQ: Dell Floor, target versus Floor, and Cost Relief (CR) yes or no. CR is Brocade/Broadcom project Cost Relief, not a SKU and not Ports on Demand. Do not publish Floor dollars. BENQUAN maps Connectrix RFQs with competitive pricing. Channel net pending confirmation.