Fibre Channel SAN / Price Notice

How to Mitigate the Brocade BSN Support Portal Price Increase Effective November 2026?

Broadcom Brocade channel book: average +5.7% from November 2, 2026. X8 +10%, G720/G820 +5%, 7810/7850 +25%. FRUs higher. Optics and software stay. Not a TGStor list.

Quick Take

Quick Take: The BSN channel price book rises 5.7 percent on average from November 2, 2026, citing supplier costs through 2026 and 2027. X8 chassis, blades, and ICL POD kits move 10 percent. G720 and G820 plus POD move 5 percent. Extension 7810 and 7850 move 25 percent. FRUs jump harder. Optics and software stay. FY26-ship backlog is excepted.

Percentages below are from a Broadcom Brocade BSN channel notice received 2026-08-27. They are not public list dollars and not a TGStor, Dell, or HPE book. Soft quotes remain industry estimate / pending confirmation against the official BSN price book.

What This BSN Notice Is

Quick Answer: A Brocade BSN price increase is a Broadcom channel-book change for Brocade Storage Networking hardware, FRUs, and Active support — not a published net quote and not a TGStor list. Average 5.7 percent hides SKU moves from 5 to 60 percent. New pricing applies to orders shipped after November 1, 2026. Named effective day is November 2.

Definition: A Brocade BSN price increase is a partner-book adjustment on Broadcom Brocade Storage Networking, received here as a channel notice dated in the buyer’s inbox on 27 August 2026. The mail cites rising supplier costs through 2026 and 2027, names an average 5.7 percent move, and says the newest BSN price book is attached. This page publishes the stated percentages only. It does not invent list dollars, SKU-level BSN part numbers, or a public PDF hotlink.

The notice applies to future bookings, shipments, and backlog, then carves two exceptions: optics and software do not rise, and backlog orders to be shipped in FY26 stay on the old book. Implementation language is “orders shipped after November 1, 2026.” The headline effective day is November 2, 2026. Write both clocks on the RFQ. Do not invent October 31 as the FY26 last-ship day unless an official book prints that date.

  • Fit this page: Open BSN bookings, FY27 ship dates, Gen6 through Gen8 Active renewals, or spare-heavy FRU estates on G710 through X8 / 7850.
  • Boundary: Treating this as a TGStor, Dell Connectrix, HPE B-series, IBM, or Huawei SNS price list; hiking optics or software; applying chassis percents to FRUs; inventing public dollars.

Same ASIC generation is not the same commercial book. DS-8820B is not a BSN G820 line. TGStor G820 is not a BSN G820 line. G748 and G749 in this notice are HPE server-embedded Brocade, not TGStor product names. For the hardware map, use the Gen 7 OEM RFQ and the Gen 8 G820 / X8 map. For portal entitlement before you open a case on the new book, see BSN register and upgrade access.

Product Hardware Increases

Quick Answer: Hardware: X8 chassis, port blades, and ICL POD kits plus 10 percent. HPE-embedded G748 and G749 plus 10 percent. G720 and POD plus 5 percent. G820 and POD plus 5 percent. Extension 7810 and 7850 plus 25 percent. Optics and software have no increase. These are channel-book deltas, not public list dollars.

Brocade BSN price increase November 2026 map: product plus 5 to 25 percent, FRU plus 12 to 60 percent, support plus 5 to 9 percent. Optics and software unchanged. Not a TGStor list.
Figure 1. BSN channel-book percentages from the 2026-08-27 notice. Unique BENQUAN composition. Soft quotes pending official book confirmation.

The average 5.7 percent is a blended channel figure. A G820 plus POD line at plus 5 percent and a 7850 line at plus 25 percent do not share the same CapEx shock. Reprice each class on its own row. Ports on Demand kits ride with the parent switch in this notice: G720 POD and G820 POD take the same 5 percent as the chassis; X8 ICL POD kits take the same 10 percent as the X8 chassis and port blades.

Hardware classChannel-book increaseBuyer note
X8 director chassis10%Applies to the chassis, not automatically to every FRU
X8 port blades and ICL POD kits10%Same percent as the X8 chassis in this notice
G748 and G749 (HPE server embedded)10%Not a TGStor product name
G720 and POD5%Fixed Gen7 mid-range plus Ports on Demand
G820 and POD5%Fixed Gen8 plus Ports on Demand
781025%Extension class; larger than fixed-switch chassis
785025%Extension class; Q4 2026 TGStor line has no 7850
Optics0%No increase stated
Software0%No increase stated

Leave SFP+, SFP-DD, Q-Flex, 128G SFP+, and OSFP ICL optics on the current book unless a later official sheet changes them. Software licenses that are not called out in the support table stay flat on the product side. Support licenses for Gen6 Active are a different row — see the support section.

FRU Increases versus Chassis Moves

Quick Answer: Spares move harder than the parent box. An X8 control-processor blade is five times the chassis percent. A 7850 FRU is more than double the 7850 hardware hike. G710 and G730 spares still rise even though this notice prints no matching chassis percent for those two fixed switches. Reprice the spare kit as its own column.

Field Replaceable Units are the largest single shock in this notice. An X8 chassis at plus 10 percent sits next to an X8 control-processor blade at plus 50 percent. A 7850 chassis at plus 25 percent sits next to a 7850 FRU at plus 60 percent. Buyers who roll a two-year spare kit into the same PO as the chassis will understate CapEx if they apply one blended 5.7 percent to every line.

FRUIncreaseVersus parent chassis / POD
G710 FRU40%G710 chassis is not listed as a product hike in this notice; FRU still moves
G720 FRU20%Parent G720 + POD is 5%
G730 FRU12%G730 chassis is not listed as a product hike; FRU still moves
G820 FRU25%Parent G820 + POD is 5%
X8 CP blade50%X8 chassis / blades / ICL POD are 10%
G748 FRU30%Parent embedded hardware is 10%
G749 FRU30%Parent embedded hardware is 10%
7810 FRU40%Parent 7810 is 25%
7850 FRU60%Parent 7850 is 25%

G710 and G730 appear on the FRU list even though this notice does not print a matching chassis percent for those two fixed switches. Do not invent a G710 or G730 chassis hike. Do reprice G710 and G730 spares. Compare FRU versus chassis on the same row before you freeze a spare kit.

Support Price Increases

Quick Answer: Support: Gen8 Active 5 to 9 percent — X8 Directors and ICL kits 5 percent, G820 9 percent. Gen7 Active 7 percent. Gen6 Active products and licenses 7 percent. OEMs may true-up renewals in Q4 2026 at current price. Already-EOL products keep existing annual increase schedules.

Support is a second book, not a copy of the hardware table. Gen8 Active spans 5 to 9 percent with two named cells: X8 Directors and ICL kits at 5 percent, G820 at 9 percent. Gen7 Active is a flat 7 percent. Gen6 Active products and licenses are also 7 percent. That last row is the only place this notice explicitly ties licenses to the support hike — do not fold it into the “software has no product increase” sentence without saying which book you mean.

Support classIncreaseClock
GEN8 Active — X8 Directors and ICL kits5%Renewals and orders shipped after 1 Nov 2026
GEN8 Active — G8209%Same clock
GEN7 Active products7%Same clock
GEN6 Active products and licenses7%Same clock
Already-EOL productsExisting annual scheduleNot pulled onto this grid
OEM renewal true-upCurrent priceQ4 2026 window
FY26-ship backlog supportOld bookVendor fiscal FY26 ship

OEMs can true-up renewals in Q4 2026 at the current price. That is a dated window, not a standing discount. If the renewal can close inside Q4 2026, ask the OEM column whether the true-up still applies to that serial. Products already in End of Life stay on their existing annual increase schedules — this notice does not overwrite those calendars with the 5 to 9 percent Active grid.

Date Clock and What Does Not Move

Quick Answer: Two exceptions matter: optics and software do not rise, and backlog orders to be shipped in FY26 stay on the old book. New product and support pricing applies to renewals and orders shipped after November 1, 2026. Freeze the ship date on the purchase order. Do not invent an October 31 cutoff.

The notice prints two dates that are easy to smash into one. November 2, 2026 is the named effective day and the average 5.7 percent headline. “After November 1, 2026” is the ship-date implementation for both product and support. A unit that ships on November 1 may still be old-book if the seller honors “after November 1.” A unit that ships on November 2 is on the new book. Write the promised ship date as a contractual field, not a comment.

Clock or exceptionWhat movesWhat stays
Named effective day 2 Nov 2026Headline average 5.7%—
Shipped after 1 Nov 2026New product and support percentsOptics and software product lines
FY26-ship backlog—Old product and support book
Q4 2026 OEM true-up—Current support price if the renewal closes in window
Already-EOLExisting annual schedule onlyThis 5–9% Active grid

FY26 is vendor fiscal language. This page does not invent the last calendar day of Broadcom FY26. If a quote prints “ship FY26” without a day, send it back. The official BSN price book referenced in the partner mail is not published as a public download here — request that book on the RFQ if you need SKU-level confirmation.

Who Should Use This Notice

Quick Answer: Fit this page if you hold open BSN bookings, FY27 ship dates, or Gen6 through Gen8 support renewals. Unfit if you only buy TGStor commercial codes, Huawei SNS, or Cisco MDS — those are different books. Also unfit if every line is already EOL under an existing annual increase schedule.

Use this notice when the seller of record is quoting Broadcom Brocade BSN hardware or Active support and the ship or renewal date crosses November 2026. Spare-heavy estates should read the FRU table first: a 7850 FRU at plus 60 percent or an X8 CP blade at plus 50 percent will move the spare kit more than the chassis row.

  • Fit: Open BSN POs with ship after 1 November 2026; Gen8 G820 / X8 CapEx; 7810 / 7850 extension; G748 / G749 HPE-embedded; Gen6–Gen8 Active renewals that can still use the Q4 2026 OEM true-up.
  • Unfit: TGStor-only RFQs that have no BSN book; Dell Connectrix-only POs until Dell confirms; Huawei OceanStor SNS; Cisco MDS; optics-only or software-only adds; already-EOL serials on a locked annual increase.

If the brief is a dual-path RFQ — BSN versus TGStor versus Dell — keep three price columns. Copying plus 5 percent from G820 onto a TG-G820 kit is an invented OEM move. The TGStor full-lineup page stays a product-name map, not this price notice.

How to Reprice the RFQ

Quick Answer: Six steps: inventory open BSN lines by ship date, split FY26-ship backlog from later ships, apply the product and FRU percentages, apply support percentages, keep optics and software unchanged, then RFQ OEM books separately. Do not paste these percents onto TGStor or Dell columns without a matching OEM notice.

  1. Step 1 — Inventory open lines by ship date. List every open BSN or OEM fabric line with the promised ship date, support end date, and whether the line is chassis, POD, FRU, optic, software, or support.
  2. Step 2 — Split FY26-ship backlog. Hold backlog orders to be shipped in FY26 on the old book. Move later ships onto the November clock. If the quote says “FY26” without a day, send it back.
  3. Step 3 — Apply product and POD percents. X8 chassis, port blades, and ICL POD kits plus 10 percent. G748 and G749 plus 10 percent. G720 and G820 plus POD plus 5 percent. 7810 and 7850 plus 25 percent.
  4. Step 4 — Apply FRU percents separately. Do not reuse chassis percents on spares. G710 40 percent, G720 20 percent, G820 25 percent, G730 12 percent, X8 CP blade 50 percent, G748 and G749 30 percent, 7850 60 percent, 7810 40 percent.
  5. Step 5 — Apply support and the OEM true-up. Gen8 Active 5 to 9 percent, Gen7 Active 7 percent, Gen6 Active products and licenses 7 percent. Ask OEMs about a Q4 2026 true-up at current price. Skip already-EOL annual schedules.
  6. Step 6 — Keep optics and software flat, RFQ OEM books separately. Leave optics and software unchanged. Do not paste these percents onto TGStor, Dell, HPE, or IBM columns until those sellers confirm. Send the split BOM to RFQ.

Common RFQ Pitfalls

Quick Answer: Common mistakes: treating November 2 and after-November-1 as the same clock, applying chassis percents to FRUs, hiking optics or software, assuming TGStor or Dell books moved the same day, and repricing already-EOL support. G748 and G749 are HPE server-embedded Brocade, not a TGStor G748.

  • One date, two clocks. November 2 is the headline. After November 1 is the ship rule. A November 1 ship can still be old-book.
  • Blending 5.7 percent onto every SKU. The average hides 5 percent G820 chassis next to 60 percent 7850 FRUs.
  • FRU = chassis. X8 CP blades are 50 percent, not 10 percent. G710 FRUs move even though no G710 chassis hike is printed.
  • Hiking optics or software. The product notice says no increase. Gen6 Active licenses on the support table are a different book.
  • Copying percents onto TGStor or Dell. Those are other commercial books. Pending confirmation.
  • Inventing TGStor G748 / G749 or TGStor 7850. G748 / G749 are HPE server-embedded. Q4 2026 TGStor has no 7850.
  • Overwriting EOL annual increases. Already-EOL serials stay on their existing schedule.
  • Missing the Q4 2026 OEM true-up. Renewals that can close in Q4 2026 may still lock current support.

Real-World Deployment Scenarios

Quick Answer: Map the three scenarios below to your workload, facility, and commercial constraints before freezing CapEx. Equal-BOM RFQs should cite which scenario drives the shortlist.

Scenario 1: Enterprise Renewal Cliff (Budget Bound)

Workload Profile: Multi-site SAN support renewals land after the November 2026 BSN price change.

Architectural Fit: Pull forward renewals or multi-year quotes before the cliff; document portal SKUs so finance compares equal coverage years.

Scenario 2: Mixed OEM Skin Estate (Entitlement Bound)

Workload Profile: Dell/HPE/IBM labeled directors still renew via Brocade-aligned support paths.

Architectural Fit: Map each chassis to the correct support portal SKU—mis-tagged renewals create coverage gaps after the hike.

Scenario 3: Spare + TPMA Hybrid (Risk Bound)

Workload Profile: Buyer wants to offset hike with third-party maintenance plus critical spares.

Architectural Fit: Keep firmware/TAC path explicit; hybrid models need written RACI before dropping OEM coverage on core directors.

Frequently Asked Questions

Quick Answer: November 2 is the named effective day; implementation is orders shipped after November 1. Average 5.7 percent hides 5 to 60 percent SKU moves. Optics and software stay. FY26-ship backlog is excepted. OEM true-up in Q4 2026 can lock current support. Confirm the official BSN book on RFQ.

The named effective day is November 2, 2026. Implementation language is new pricing for orders shipped after November 1, 2026. Freeze the promised ship date on the purchase order. Do not invent an October 31 FY26 last-ship day unless the official book prints it.

No. This notice is the Broadcom Brocade BSN channel book only. TGStor commercial codes and Dell Connectrix SKUs are different books. Same ASIC generation is not the same price action. OEM moves stay pending confirmation.

No. The channel notice states no increases for optics and software. Leave those lines on the current book unless a later official sheet changes them.

Backlog orders to be shipped in FY26 stay on the old book for both product and support. Later ships and renewals after November 1, 2026 take the new percentages. Confirm the vendor fiscal ship window on the PO.

G748 and G749 are HPE server-embedded Brocade models in this notice, not TGStor product names. Hardware moves 10 percent; FRUs move 30 percent. Do not invent a TGStor G748 on the RFQ.

Yes. The notice lets OEMs true-up renewals in Q4 2026 at the current price. Already-EOL products keep their existing annual increase schedules and are not pulled onto this 5 to 9 percent Active grid.

References

Quick Answer: Validate hardware families on Broadcom public G720, G820, and X8 pages. Percentages on this page come from the 2026-08-27 BSN channel notice, not from those datasheets. Request the official BSN price book on RFQ. This page publishes no list dollars.

Primary numeric source for percentages: BSN channel notice received 2026-08-27 (partner email; official price book attached to that mail, not republished here). Hardware family pages above confirm model names only. Soft quotes remain industry estimate / pending confirmation.

Key Takeaway

Key Takeaway: Lock every open Brocade line by ship date before November 2, 2026. Apply chassis, POD, FRU, and support percents from this BSN notice only. Leave optics and software flat. Do not copy these percents onto TGStor, Dell, or HPE books until those sellers confirm. BENQUAN GLOBAL LIMITED supplies Brocade BSN switch configurations with competitive pricing.

Need the open BSN BOM split by ship date?

If FY26-ship backlog, FRU spares, and Gen6–Gen8 support are still on one blended percent, request a free compatibility and delivery risk assessment before the November clock.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents