Insights / Buying Guide

B300 vs H100: is the cheaper H100 quote still cheaper after the model no longer fits in 80GB?

80GB splits the job across more GPUs. About 1,000W liquid cooling stops a B300 quote at the facility.

Quick Take

Quick Take: Buy H100 when the model fits in 80GB and the rack stays air-cooled at 700W. Buy B300 when you need 288GB of HBM3E and the room can host about 1,000W of liquid cooling. NVLink 5 doubles interconnect bandwidth versus H100. Price and delivery follow those two lines.

If your largest model does not fit in 80GB per GPU, the H100 quote is only cheaper on paper — you split the model across more GPUs and more network. If your room cannot cool about 1,000W per GPU, the B300 quote stops at the facility. Check those two lines before you compare prices.

B300 vs H100: Side-by-Side Specs

Quick Answer: Skip Hopper secondary when models need more than about 80GB per GPU, multi-node training is memory-bound, or liquid cooling and 800 Gb/s networking are already funded. Stay on H100 when inference or sub-30B training fits air-cooled racks and mature supply matters more than peak FLOPS.

Quick Answer: B300 is a full generation ahead: 288GB HBM3E versus 80GB HBM3, about 8 TB/s versus 3.35 TB/s of bandwidth, NVLink 5 at 1,800 GB/s versus 900 GB/s, and roughly 1,000W liquid-cooled against 700W air-cooled. Plan CDU capacity before quoting either platform at rack scale.

Specification NVIDIA B300 (Blackwell Ultra) NVIDIA H100 (Hopper)
ArchitectureBlackwell Ultra NewerHopper
Process NodeTSMC 4NPTSMC 4N
Memory288 GB HBM3E 3.6x80 GB HBM3
Memory Bandwidth~8 TB/s 2.4x3.35 TB/s
FP8 Compute (dense)~5 PFLOPS~2 PFLOPS
FP16/BF16 Compute~2.5 PFLOPS~1 PFLOPS
FP64 Compute~66 TFLOPS~34 TFLOPS
NVLink VersionNVLink 5 2xNVLink 4
NVLink Bandwidth1,800 GB/s900 GB/s
Transformer Engine2nd Gen (FP4 support)1st Gen
Max TDP~1,000 W (liquid recommended)700 W (air cooling)
InterconnectConnectX-8 800 Gb/sConnectX-7 400 Gb/s
Form FactorSXM (DGX B300 NVL72)PCIe / SXM (DGX H100)

Architecture: Blackwell Ultra vs Hopper

Quick Answer: Hopper’s first-generation Transformer Engine made FP8 training viable; Blackwell Ultra rebuilds memory, interconnect, and precision around long-context reasoning. Capacity decides most bids: a 70B model quantized to FP8 needs roughly 70GB, so it lands on a single B300 where H100 must shard. Native FP4 keeps growing KV caches resident.

B300 is a full architectural generation ahead of H100. Hopper made FP8 training practical; Blackwell Ultra refines memory, NVLink, and Transformer Engine for long-context and multi-node reasoning workloads.

Memory: The Biggest Differentiator

B300’s 288 GB HBM3E is 3.6x H100’s 80 GB. Models that needed tensor parallelism across four H100 GPUs often fit on one B300. A 70B model in FP8 uses roughly 70 GB — one B300 versus two H100s in many topologies.

NVLink 5: Closing the Interconnect Gap

NVLink 5 doubles per-GPU bandwidth from 900 GB/s to 1,800 GB/s. In multi-GPU training, less idle time waiting on gradients improves cluster utilization — especially past 64 GPUs.

Second-Generation Transformer Engine

Native FP4 support improves memory density versus FP8 for inference. That helps KV cache scale with context length so 128K+ contexts that stress H100 at FP8 can stay on B300.

When to Choose NVIDIA B300

Quick Answer: Pick B300 for 100B-parameter training, long-context reasoning, and clusters where 288GB HBM3E with NVLink 5 removes model parallelism. Recommended builds start near 64 GPUs with direct-to-chip liquid cooling and 800 Gb/s ports, so the real gate is facility readiness rather than the GPU line on the quote.

Hyperscale LLM Training — 100B+ Parameter Models

288GB HBM3E1,800 GB/s NVLink~5 PFLOPS

Teams training GPT-class models often cut GPU count versus H100 while improving time-to-train, because larger memory per GPU simplifies topology and reduces communication overhead.

  • Best forLarge-scale training, long-context reasoning, HPC
  • Minimum cluster size64+ GPUs recommended
  • Cooling requirementLiquid cooling (direct-to-chip)
  • Infra readinessNew build or major facility upgrade
  • Ideal forAI-first enterprises, cloud providers, research labs

When to Choose NVIDIA H100

Quick Answer: Choose H100 for inference serving, mid-size training to roughly 30B parameters, and fine-tuning inside air-cooled racks. A 25B-class FP8 job spreads across eight 700W GPUs in one node, and reusing existing 400 Gb/s switching keeps deployment risk low when peak memory would sit unused anyway.

Enterprise Inference Serving — Mid-Size Models

80GB HBM3900 GB/s NVLink~2 PFLOPS

Many 25B-class FP8 inference jobs fit on H100 nodes with tensor parallelism across eight GPUs. Existing 400 Gb/s and air cooling keep deployment risk lower than a B300 facility upgrade.

  • Best forInference, mid-size training, fine-tuning
  • Minimum cluster size8+ GPUs
  • Cooling requirementStandard air cooling (700W)
  • Infra readinessExisting data center power and cooling
  • Ideal forEnterprise IT, mid-market AI, cost-conscious fleets

Decision Framework

Quick Answer: Under 30B parameters, H100 is usually enough. Between 30B and 70B, either works: H100 with tensor parallelism, or B300 for a simpler topology. From 70B to 100B, B300 often fits one GPU. Past 100B it becomes the default, provided the site is not still air-cooled at 400 Gb/s.

Quick Decision Tree

Start with model size:

  • Under 30B — H100 is cost-effective and proven
  • 30B–70B — H100 with tensor parallelism, or B300 for simpler topology
  • 70B–100B — B300 often fits one GPU; H100 needs multi-GPU partition
  • 100B+ — B300 is the clear path when facility is ready

Then check infrastructure: If the site is air-cooled with 400 Gb/s networking, H100 can ship into current constraints. B300 may require a facility upgrade before the GPU PO.

Total Cost of Ownership: B300 vs H100

Quick Answer: Per-GPU hardware runs three to four times H100 class, and the delta widens once liquid cooling, 800 Gb/s NICs, and three years of 1,000W power are added. Large jobs still pay it back: two to three times the training throughput and cost per unit of work around 0.6x to 0.8x.

Cost Factor B300 (per GPU) H100 (per GPU)
Hardware (indicative channel)Higher (3–4x H100 class)Lower, mature supply
Power (3-year, indicative)Higher (~1,000W class)Lower (~700W)
Cooling infrastructureLiquid cooling budgetAir cooling typical
Networking (per port)800 Gb/s class400 Gb/s class
Training throughput (relative)~2x–3x H1001x baseline
Inference throughput (relative)~3x–5x H1001x baseline
TCO per unit of throughputOften 0.6x–0.8x on large jobs1x baseline

Contact us before you freeze the GPU path.

Frequently Asked Questions

Quick Answer: Five questions cover the premium, cluster mixing, workload fit, whether H100 still earns its place, and sourcing. The dividing line is memory and interconnect: 288GB of HBM3E with NVLink 5 pays back on 100B-parameter training and long-context work, while H100 stays cheaper per inference token.

Yes for large-scale LLM training and long-context reasoning where 288GB HBM3E and NVLink 5 cut GPU count. For smaller models or inference-only, H100 usually wins on TCO.

Possible but impractical for the same training job due to stragglers. Deploy separate clusters for different workload tiers.

100B+ training, 128K+ context reasoning, high-concurrency multi-turn serving, and FP64-heavy HPC where memory per GPU matters.

No. H100 remains strong for inference, mid-size training, and fine-tuning with mature supply and air-cooled deployments.

Key Takeaway

Key Takeaway: Size the model first, then the room: under 30B parameters order H100 into air-cooled racks with 400 Gb/s ports, and above 100B commit to B300 only once direct-to-chip cooling and 800 Gb/s switching are funded. BENQUAN GLOBAL LIMITED supplies the NVIDIA B300 and H100 with competitive pricing.

Deciding Between B300 and H100?

Share model size, concurrency, and cooling constraints. We validate BOM options and lead times for Hong Kong and APAC.

Request a Quote

Or call +852-21349834 · info@benquan.hk

Contents