Direct Connect or ExpressRoute: a private cloud circuit, or are you pricing an SD-WAN box?

Hybrid RFQs still compare Direct Connect and ExpressRoute slides as if one wins the WAN. They are separate underlay paths into each hyperscaler — port speed, circuit SKU, colo cross-connect, and redundancy decide BOM risk, not SD-WAN overlay marketing.

Quick Take

Quick Take: AWS Direct Connect (dedicated or hosted ports) and Azure ExpressRoute (circuit SKU plus peering type) are peer cloud private interconnect paths — not SD-WAN appliance overlays. Multi-cloud estates often buy both on separate BOM lines. Peer on port speed, circuit bandwidth, colo location, cross-connect, and redundancy. BENQUAN GLOBAL LIMITED supplies interconnect procurement support.

When Direct Connect vs ExpressRoute Actually Matters

Quick Answer: Use this guide when hybrid or multi-cloud estates need a private underlay into AWS and Azure instead of internet-only egress. The real decisions are colocation placement, bandwidth metering and redundancy design. It is not a single-vendor WAN bake-off against SD-WAN appliances, which belong on separate RFQ rows.

Threads titled "Direct Connect vs ExpressRoute" rarely fail on latency slides — they fail on mixing interconnect underlay with SD-WAN overlay RFQs, or on unequal port or circuit bandwidth and missing cross-connect line items.
Underlay
Not Overlay
Port
vs Circuit SKU
Colo
Cross-Connect
Dual
Multi-Cloud BOM
  • Not SD-WAN: Branch overlay is a separate RFQ — see Prisma SD-WAN vs VeloCloud and EdgeConnect vs FortiGate SD-WAN.
  • Not DEM alone: Path visibility tools complement interconnect — see ThousandEyes vs Catchpoint.
  • Not SASE: Cloud SSE and ZTNA are separate from private circuit underlay — see Zscaler and Prisma Access guides when user traffic policy is the fork.
  • Single-cloud fork: AWS-only estates compare dedicated vs hosted Direct Connect. Azure-only estates compare ExpressRoute circuit SKUs and peering types.

AWS Direct Connect — Dedicated, Hosted, and Region Mapping

Quick Answer: Direct Connect delivers private Layer 2 or routed paths from your colo or partner handoff into AWS. Quote port speed (1G, 10G, 100G class), connection type (dedicated vs hosted), virtual interface count, and target AWS Region — each line item bills separately from SD-WAN or firewall SKUs.

Dimension What the RFQ must state
Connection type Dedicated connection (your port at Direct Connect location) vs hosted connection (partner provisions port, you buy virtual connection bandwidth)
Port speed Physical port tier — 1 Gbps, 10 Gbps, 100 Gbps class; confirm exact AWS-supported speed at chosen location
Location / partner Direct Connect location ID, colo meet-me room, or hosted-connection partner that aligns with latency and compliance to target Region
Virtual interfaces Private VIF (VPC), public VIF (S3, DynamoDB public endpoints), transit VIF (Transit Gateway) — count and BGP scope per VIF
AWS Region Each VIF maps to one Region; multi-Region estates need multiple paths or Transit Gateway hub design
Metering dimensions Port hours, outbound data transfer per GB (Region-specific), hosted-connection bandwidth tier — no fixed public list price; model dimensions on the quote

Hosted vs dedicated honesty

Dedicated gives you the full port — you pay port hours even when idle. Hosted lets smaller bandwidth increments through a partner but adds partner margin and provisioning lead time. Both still require cross-connect or partner handoff and redundant design when RTO demands dual paths.

Azure ExpressRoute — Circuit SKU, Peering, and Region

Quick Answer: ExpressRoute is an Azure-managed private circuit from a connectivity provider or ExpressRoute Direct into Azure regions. The BOM names circuit bandwidth SKU, peering type (private, Microsoft, public legacy paths), ExpressRoute Gateway SKU if required, and target Azure Region — separate from AWS Direct Connect even when colo is shared.

Dimension What the RFQ must state
Circuit SKU / bandwidth Provider circuit speed tier (50 Mbps through 10 Gbps+ classes) — ExpressRoute Direct uses port speeds at peering location
Peering type Private peering (VNet), Microsoft peering (Microsoft 365, Dynamics, Power Platform), public peering legacy deprecation awareness
Connectivity model Provider-managed ExpressRoute circuit vs ExpressRoute Direct (your hardware at peering site)
Gateway ExpressRoute Gateway SKU and scale units when VNet integration requires gateway — not optional on many designs
Azure Region Peering location maps to Region; global reach and premium SKU affect cross-Region routing options
Metering dimensions Provider circuit monthly, ExpressRoute Gateway hours, data transfer out, optional premium/global reach — itemize each on quote

Peering traps

Microsoft peering carries Microsoft 365 and SaaS paths — private peering carries VNet workloads. Mixing peering intent on one circuit without documenting BGP scope creates security and routing surprises. State peering type and allowed route prefixes on the RFQ brief.

Multi-Cloud Reality — Often Both, Not Either

Quick Answer: Estates running production on AWS and Azure simultaneously usually procure Direct Connect and ExpressRoute on separate BOM lines. Shared colo space can reduce cross-connect cost, but each cloud bills its own circuit, gateway, and egress metering — forcing a false winner wastes negotiation leverage.

  • Dual production: Budget two underlay paths — AWS VIFs plus ExpressRoute circuit — even when traffic volumes differ.
  • Shared colo: One meet-me room can host both handoffs; cross-connect may be one logical demarc but two provider contracts.
  • DR asymmetry: DR Region may need a second circuit SKU — do not assume primary Region path covers failover Region.
  • Egress math: Data transfer out meters per cloud and Region — model dimensions separately; do not blend into one WAN Mbps figure.
If procurement ranks "AWS vs Azure interconnect" as a single bake-off while both clouds host production, stop and split the BOM. Each hyperscaler underlay is its own contract line.

SD-WAN Overlay Complement — Not Replacement

Quick Answer: Direct Connect and ExpressRoute are underlay private paths. SD-WAN overlay — whether appliance NGFW, cloud-managed Prisma SD-WAN, or VeloCloud — selects among MPLS, DIA, LTE, and private interconnect as transport. Quote overlay and interconnect on separate RFQ lines with explicit circuit references.

  • Overlay on private underlay: SD-WAN appliances at branch or data center steer traffic across DIA and private interconnect — the interconnect does not replace overlay policy or NGFW.
  • Cloud-managed overlay: Prisma SD-WAN vs VeloCloud covers orchestration — still needs physical or hosted circuit into each cloud.
  • Appliance overlay: EdgeConnect vs FortiGate SD-WAN — NGFW plus overlay on same box; interconnect lands on separate port or VLAN.
  • Visibility: ThousandEyes vs Catchpoint — DEM validates path quality over interconnect and internet; does not provision circuits.

Firewall RFQ is another line

NGFW, SASE, and SSE subscriptions are not ExpressRoute or Direct Connect substitutes. A branch FortiGate or PA appliance SD-WAN quote belongs on its own BOM row — see FortiGate and Prisma SD-WAN guides — with interconnect listed as referenced underlay transport.

BOM & Colo Structure — Ports, Cross-Connect, Redundancy

Quick Answer: A complete interconnect BOM itemizes port or circuit bandwidth, colo cross-connect, provider or cloud port hours, gateway SKUs, virtual interface or peering count, and dual-circuit redundancy. Missing cross-connect or second path is the most common delivery-risk gap on hybrid quotes.

BOM line AWS Direct Connect Azure ExpressRoute
Physical layer Dedicated port or hosted partner connection Provider circuit or ExpressRoute Direct port
Bandwidth tier Port speed + hosted connection Mbps cap Circuit SKU Mbps + gateway scale units
Colo / cross-connect Meet-me cross-connect at Direct Connect location Provider demarc or ExpressRoute Direct cross-connect
Logical layer VIF count, BGP prefixes, Transit Gateway attachment Peering type, VNet gateway, route server if used
Redundancy Second port or second hosted connection in diverse path Second circuit SKU or dual ExpressRoute Direct ports
Separate RFQ rows SD-WAN, NGFW, DEM — reference circuit ID, do not bundle Same — firewall and overlay on distinct line items

Lead time risk

Colo cross-connect, provider circuit provisioning, and hosted-connection partner queues often exceed cloud API provisioning time. State ATP dates on each line — port availability at a location is not the same as end-to-end private path ready.

RFQ Checklist — Interconnect BOM on One Brief

Quick Answer: Issue one underlay brief carrying AWS Direct Connect line items, Azure ExpressRoute line items, colocation cross-connect scope, and optional SD-WAN or NGFW on separate rows. Equalize committed bandwidth, redundancy model and subscription term before comparing providers, and request dated lead times for provider acceptance and colocation work orders.

What to put on the RFQ

  • Target AWS Regions and Azure Regions per workload class
  • Required Mbps per path (peak and committed), RTO/RPO for circuit failure
  • Direct Connect: dedicated vs hosted, port speed, location ID, VIF types and count
  • ExpressRoute: circuit SKU, peering type, gateway SKU, provider or Direct model
  • Colo: facility, cross-connect scope, diverse path requirement
  • Redundancy: dual port, dual circuit, or active-active vs active-standby
  • Metering: port hours, outbound data transfer dimensions — no blended WAN figure
  • Separate rows: SD-WAN overlay, NGFW, SASE, DEM tools
  • Lead time: provider ATP, colo work order, quote validity window

Submit the interconnect brief on rfq.html.

Frequently Asked Questions

Quick Answer: Direct Connect and ExpressRoute are separate underlay paths, so multi-cloud production estates usually buy both on separate bill of materials lines. Keep SD-WAN overlay, NGFW and digital experience monitoring on their own RFQ rows, then peer each column on bandwidth, colocation, cross-connect and redundancy rather than latency marketing.

Only for single-cloud estates choosing one path. Multi-cloud production usually needs both on separate BOM lines. Peer each column on bandwidth, colo, and redundancy — not latency marketing.

No. Interconnect is underlay into each cloud. SD-WAN overlay rides on DIA, MPLS, LTE, and private circuits. Quote on separate RFQ rows.

Dedicated: your port at a Direct Connect location. Hosted: partner port with per-connection bandwidth tiers. Both need colo handoff and cross-connect line items.

Submit port or circuit bandwidth, colo, peering intent, and redundancy on one brief.

Key Takeaway

Key Takeaway: AWS Direct Connect and Azure ExpressRoute are peer underlay paths into each hyperscaler — not substitutes for SD-WAN overlay or NGFW. Multi-cloud estates often dual-buy. Win on colo cross-connect honesty, equal bandwidth assumptions, and separate BOM lines for overlay and security. BENQUAN GLOBAL LIMITED supplies interconnect procurement support with competitive pricing for global buyers.

Not sure your interconnect BOM is complete?

If Direct Connect port tiers, ExpressRoute circuit SKUs, colo cross-connect, or multi-cloud dual-path redundancy are unclear, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment